
frameless arched hangars in Astana
and the regionfrom 23 500 ₸*/m² in 1 month*Crew labour cost
Durable and energy-efficient frameless hangars thanks to high quality standards and oversight by engineering services at every stage of construction.
200+ successfully completed projects in 25 years of workOnline broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

frameless arched hangars in Astana
and the region
from 23 500 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient frameless hangars thanks to high quality standards and oversight by engineering services at every stage of construction.
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

frameless arched hangars in Astana
and the region
from 23 500 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient frameless hangars thanks to high quality standards and oversight by engineering services at every stage of construction.
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST
Features of building frameless hangars

Frameless arched hangars are structures in which the walls and roof form a single self-supporting arched construction, with no internal supports or columns. They are made from galvanised panels of high-strength steel.


Frameless hangars are a unique solution for quickly erecting large structures, especially when time or budget is limited.
Features of building frameless hangars
Frameless arched hangars are structures in which the walls and roof form a single self-supporting arched construction, with no internal supports or columns. They are made from galvanised panels of high-strength steel.

Frameless hangars are a unique solution for quickly erecting large structures, especially when time or budget is limited.


Features of building frameless hangars
Frameless arched hangars are structures in which the walls and roof form a single self-supporting arched construction, with no internal supports or columns. They are made from galvanised panels of high-strength steel.
Frameless hangars are a unique solution for quickly erecting large structures, especially when time or budget is limited.





what hangars are built for













what hangars are built for













what hangars are built for













FRAMELESS HANGARS ARE DIVIDED INTO 2 TYPES:
leave a request
INSULATED
from 30 000 KZT/m2

from 23 500 KZT/m2
COLD
FRAMELESS HANGARS ARE DIVIDED INTO 2 TYPES:

INSULATED
from 30 000 KZT/m2

COLD
from 23 500 KZT/m2
FRAMELESS HANGARS ARE DIVIDED INTO 2 TYPES:


INSULATED
from 23 500 KZT/m2
from 30 000 KZT/m2
COLD
types of hangar insulation
Our company offers several types of insulation when you order an insulated hangar


Polyurethane foam
mineral wool
from 30 000 KZT/m2
from 50 000 KZT/m2
types of hangar insulation
Our company offers several types of insulation when you order an insulated hangar


Polyurethane foam
mineral wool
from 30 000 KZT/m2
from 50 000 KZT/m2
types of hangar insulation
Our company offers several types of insulation when you order an insulated hangar

Polyurethane foam

from 30 000 KZT/m2
mineral wool
from 50 000 KZT/m2
Cost of building frameless hangars in Astana
No concrete work - steel structure only
Including foundation work
Including the foundation and floor screed
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
23 500 KZT/m2
30 000 KZT/m2
50 000 KZT/m2
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
35 000 KZT/m2
42 000 KZT/m2
65 000 KZT/m2
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
40 000 KZT/m2
45 000 KZT/m2
70 000 KZT/m2


need a consultation?
Leave a request or contact us at +7 (777) 327-97-34
The price does not include utilities, gates, windows or lighting.
The maximum possible hangar height is 11 metres; a retaining wall of up to 3- metres can also be raised at the base. This gives a total of 14 metres at the ridge.
The maximum possible width is 24 metres.
Cost of building frameless hangars in Astana
No concrete work - steel structure only
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
23 500 KZT/m2
30 000 KZT/m2
50 000 KZT/m2
Including foundation work
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
35 000 KZT/m2
42 000 KZT/m2
65 000 KZT/m2
Including the foundation and floor screed
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
40 000 KZT/m2
45 000 KZT/m2
70 000 KZT/m2
The price does not include utilities, gates, windows or lighting.
The maximum possible hangar height is 11 metres; a retaining wall of up to 3- metres can also be raised at the base. This gives a total of 14 metres at the ridge.
The maximum possible width is 24 metres.
Cost of building frameless hangars in Astana
No concrete work - steel structure only
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
23 500 KZT/m2
30 000 KZT/m2
50 000 KZT/m2
Including foundation work
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
35 000 KZT/m2
42 000 KZT/m2
65 000 KZT/m2
Including the foundation and floor screed
Cold
Insulated with 3 cm of polyurethane foam
Insulated, mineral wool with a double wall
40 000 KZT/m2
45 000 KZT/m2
70 000 KZT/m2
The price does not include utilities, gates, windows or lighting.
The maximum possible hangar height is 11 metres; a retaining wall of up to 3- metres can also be raised at the base. This gives a total of 14 metres at the ridge.
The maximum possible width is 24 metres.
List of works for building a frameless hangar
The price includes labour, materials and the transport costs of delivering the material to the city of Astana
Pouring the foundation strip with vibration, a foundation 1 m high and 40 cm wide. Grade 200
Preparing the site and marking out the building footprint
Preparing and digging the soil base for the cushion or the trench of the strip foundation
Installing the formwork
Reinforcement of the foundation strip
Dismantling the formwork
Coating waterproofing of the foundation in 2 layers
Backfilling the foundation strip with sand-gravel mix
Compacting the sand-gravel mix
Reinforcement of the rough screed for the strip foundation with 12-diameter composite rebar at a 150 mm spacing
Pouring the rough screed, concrete grade 250
Assembly of the hangar structure, galvanised steel 1 mm
Installation of mechanical gates 4×4.5 metres - 2 units
Installation of windows on the end walls of the hangar above the gates, 1 m by 4,5 m
Lighting installation: LED lighting in a single row down the middle of the hangar on a metal cable
The calculations are approximate and may be adjusted depending on the exact specification and the customer's wishes
The costs of transporting materials and of the crew's travel and accommodation to the regions are calculated individually
COLD-TYPE FRAMELESS ARCHED HANGAR
The price is given for cash payment
List of works for building a frameless hangar
The price includes labour, materials and the transport costs of delivering the material to the city of Astana
Preparing the site and marking out the building footprint
Preparing and digging the soil base for the cushion or the trench of the strip foundation
Installing the formwork
Reinforcement of the foundation strip
Pouring the foundation strip with vibration, a foundation 1 m high and 40 cm wide. Grade 200
Dismantling the formwork
Coating waterproofing of the foundation in 2 layers
Backfilling the foundation strip with sand-gravel mix
Compacting the sand-gravel mix
Reinforcement of the rough screed for the strip foundation with 12-diameter composite rebar at a 150 mm spacing
Pouring the rough screed, concrete grade 250
Assembly of the hangar structure, galvanised steel 1 mm
Installation of mechanical gates 4×4.5 metres - 2 units
Installation of windows on the end walls of the hangar above the gates, 1 m by 4,5 m
Lighting installation: LED lighting in a single row down the middle of the hangar on a metal cable
The calculations are approximate and may be adjusted depending on the exact specification and the customer's wishes
COLD-TYPE FRAMELESS ARCHED HANGAR
The costs of transporting materials and of the crew's travel and accommodation to the regions are calculated individually
The price is given for cash payment
List of works for building a frameless hangar
The price includes labour, materials and the transport costs of delivering the material to the city of Astana
The costs of transporting materials and of the crew's travel and accommodation to the regions are calculated individually
The price is given for cash payment
COLD-TYPE FRAMELESS ARCHED HANGAR
The calculations are approximate and may be adjusted depending on the exact specification and the customer's wishes
Preparing the site and marking out the building footprint
Preparing and digging the soil base for the cushion or the trench of the strip foundation
Installing the formwork
Reinforcement of the foundation strip
Pouring the foundation strip with vibration, a foundation 1 m high and 40 cm wide. Grade 200
Dismantling the formwork
Coating waterproofing of the foundation in 2 layers
Backfilling the foundation strip with sand-gravel mix
Compacting the sand-gravel mix
Reinforcement of the rough screed for the strip foundation with 12-diameter composite rebar at a 150 mm spacing
Pouring the rough screed, concrete grade 250
Assembly of the hangar structure, galvanised steel 1 mm
Installation of mechanical gates 4×4.5 metres - 2 units
Installation of windows on the end walls of the hangar above the gates, 1 m by 4,5 m
Lighting installation: LED lighting in a single row down the middle of the hangar on a metal cable
Advantages of building a frameless hangar with Profi-Dom

25-50 years
The service life of the hangar when building codes are observed and the structure is operated and maintained correctly

Seismic resistance of 10 points
Prefabricated hangars have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

Top quality class
Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
from -50°C to +50°C
Maintaining the required temperature to within 0.5°C

100% thermal insulation
Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
Resistance to natural disasters
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Advantages of building a frameless hangar with Profi-Dom

The service life of the hangar when building codes are observed and the structure is operated and maintained correctly
25-50 years

Prefabricated hangars have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
Seismic resistance of 10 points

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°C to +50°C

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100% thermal insulation
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters
We will call you back within 3 minutes
Advantages of building a frameless hangar with Profi-Dom

The service life of the hangar when building codes are observed and the structure is operated and maintained correctly
25-50 years

Prefabricated hangars have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
Seismic resistance of 10 points

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa

Top quality class
Maintaining the required temperature to within 0.5°C
from -50°C to +50°C

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100% thermal insulation
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters
We will call you back within 3 minutes
Types of hangars we assemble
Metal thickness 0,8 mm

Width
Height
10 m
7 m
Width
Height

12 m
7 m
Metal thickness 1 mm

Width
Height
12 m
7 m
Width
Height

18 m
9 m
Metal thickness 2 mm

Width
Height
12 m
7 m
Width
Height

up to 40 m
up to 20 m
Types of hangars we assemble
Metal thickness 0,8 mm
Metal thickness 1 mm
Metal thickness 2 mm

Width
Height
10 m
7 m
Width
Height

12 m
7 m

Width
Height
12 m
7 m
Width
Height

18 m
9 m

Width
Height
12 m
7 m
Width
Height

up to 40 m
up to 20 m
Types of hangars we assemble
Metal thickness 0,8 mm
Metal thickness 1 mm
Metal thickness 2 mm

Width
Height
10 m
7 m
Width
Height

12 m
7 m

Width
Height
12 m
7 m
Width
Height

18 m
9 m

Width
Height
12 m
7 m
Width
Height

up to 40 m
up to 20 m
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe for building your frameless arched hangar in 1 minute
hangars we have built











Customer reviews of arched hangar construction in Astana
Your feedback matters a great deal to us






Frameless hangar construction in Astana
If you are looking for a fast, economical and durable solution for a warehouse, workshop or arena in Astana, modern arched structures are the option worth considering first. This construction technology, which has replaced bulky LMK and unreliable tents, makes it possible to obtain a shelter with calculated strength for the capital's harsh climate within a short time. In this article, without fluff or advertising, we will cover every aspect: from how a self-supporting arch works to the real timelines and cost of a turnkey project in your region.
What a self-supporting arched hangar is and what advantages it offers businesses in Astana
Expert advice from Sergey Kuleshov, chief design engineer: «The key advantage of the technology is speed. Under favourable conditions, only 5–7 days pass from a finished base to a closed envelope. For a business this means minimal downtime and the chance to put the facility into operation in the same season. That is exactly why prefabricated arched hangars have become the optimal solution for today's market.»
The principle of a self-supporting structure: why an arch is stronger than a frame
Technical specifications and materials: what to look for when choosing
- Steel and coating:
- Spans and radii:
Frameless hangar construction in Astana: how we calculate snow and wind loads
Foundation and plinth: what base a frameless hangar needs
- Strip foundation: Ideal for stable, non-heaving soils. It is a concrete strip around the perimeter, on which a plinth of brick or concrete blocks is laid. Reliable and durable.
- Pile-and-grillage foundation: Our main solution for most facilities in Astana and the region. Piles sunk below the freezing depth provide stability on frost-heaving soils, while the grillage serves as that rigid base for the plinth. Fastening to the base is done with reliable anchors.
Comparison table: frameless arched hangar vs LMK vs tent solution
Parameter | Self-supporting arched hangar | LMK / sandwich panels | Tent hangar |
Installation time | 5-14 days | 1-3 months | 3-7 days |
Cost (CAPEX) | Medium | High | Low |
Foundation | Lightweight plinth | Massive, expensive | The simplest |
Thermal envelope | Requires insulation | A ready-made "thermos" | Practically none |
Service life | 25-40 years | 50+ years | 5-15 years |
Air-tightness | High (standing-seam joint) | High (panels) | Low (seams) |
Insulation and microclimate: how to beat condensation and keep the heat in
- Sprayed PU foam:
- Mineral wool:
Expert advice from Sergey Kuleshov, chief design engineer: «The main trade-off when choosing insulation is budget versus purpose. For an unheated warehouse, where the main task is to beat condensation, 25-30 mm of PU foam is often enough. For a heated workshop, a calculation and 50-100 mm are needed. Don't cut corners on this, otherwise in winter you will be heating the street and in summer fighting water on the floor.»
Stages of building a turnkey frameless hangar: from the site to handover
- Site preparation and survey. Our surveyor and engineer visit the site in Astana or a neighbouring area. We assess the soils, the terrain and the access roads and determine the optimal foundation type.
- Design and load calculation. We develop a working design taking into account all of Astana's loads.
- Construction of the foundation and plinth. We carry out the earthworks and pour the strip foundation or the pile-and-grillage foundation. In parallel, coils of profiled steel are prepared at the factory.
- Roll-forming the profile and assembling the arches. This is the key stage. A roll-forming machine is set up on site and «produces» a finished arched panel. The installers join the panels together with a locking seam. The roll-forming speed is up to 300-500 sq. m per shift.
- Sealing the seams and installing trim. All longitudinal seams are additionally sealed. The end walls, gates, ventilation systems and translucent skylights are installed.
- Handover of the facility and signing of the acceptance certificates. You accept the finished turnkey frameless hangar, and we hand over the as-built documentation.
Specification table for the shell of a frameless hangar
Parameter | Value / range | Comment |
Material | Galvanised steel | Grade 350 |
Steel thickness | 0,8 mm – 1,2 mm | Depends on the span and loads |
Zinc coating | Z275 | Standard for industrial facilities |
Joint type | Double locking seam | Provides strength and air-tightness |
Corrugation pitch | 67 mm / 125 mm | Affects longitudinal rigidity |
Maximum span | Up to 30 m | Requires an individual calculation |
Typical arch radius | 1/2 of the span width | For example, for a 18 m hangar the radius is ~9 m |
Cost of building a frameless hangar in Astana: what makes up the "turnkey" price
- Foundation and plinth (15-25%):
- Metal and coating (40-50%):
- Roll-forming and installation (20-25%):
- Trim elements and engineering (10-15%):
- Insulation (optional, +30-60% to the cost):
A modern solution for fast and durable construction
Frequently asked questions about arched hangar construction in Astana
What are frameless arched hangars?
- No internal supports or columns
- Made from galvanised steel panels
- Assembled with special equipment directly on the construction site
- Provide a large open space inside
- Have high strength and load resistance
- Fast erection times (from a few days to a few weeks)
- Cost efficiency compared with traditional structures
What are the main advantages of frameless arched warehouses?
- Fast assembly (up to 1000 m² can be erected in a week)
- Cost efficiency of construction due to the absence of a frame
- Large open space with no internal supports
- High strength and load resistance thanks to the arched shape
- Easy to dismantle and relocate
- Corrosion resistance thanks to the use of galvanised steel
What size limits do frameless arched warehouses have?
- The span width can reach 18-25 metres with no additional supports
- The ridge height can range from 6 to 12 metres
- The length is practically unlimited and is set by the customer's needs
- Ability to create multi-span structures to increase the width
- Snow and wind load limits depending on the region
- Can be extended in a modular way by adding new sections
How is fire safety ensured in frameless arched warehouses?
- Use of non-combustible materials (metal) for the main structure
- Treatment of metal surfaces with fire-retardant compounds
- Installation of fire alarm and automatic fire extinguishing systems
- Arrangement of escape routes and installation of fire doors
- Division of large warehouses into fire compartments
