
Prefabricated steel structure buildings in Astana
and the region from 70 000 ₸*/m² in 1 month*Crew labour costDurable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of workOnline broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Prefabricated steel structure buildings in Astana
and the region
from 70 000 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Prefabricated steel structure buildings in Astana
and the region
from 70 000 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST
steel structure buildings we construct









steel structure buildings we construct
We will call you back within 3 minutes
steel structure buildings we construct
We will call you back within 3 minutes
Cost of building a steel structure building in Astana
| TERM | MATERIAL | ROUGH FINISHING | FINAL FINISHING |
|---|---|---|---|
| from 30 days | Metal frame filled with sandwich panels | from 70000 KZT/m2 | from 110000 KZT/m2 |
Advantages of building a steel structure building with profi-dom

Cheaper by 30-40%
Unlike permanent construction facilities

10-point seismic resistance
Steel structure buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

Top quality class
Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
from -50°
C to +50°C
Maintaining the required temperature to within 0.5°C
No property tax
Saves up to 2,2% of the cadastral value annually
Resistance to natural disasters
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

100%
thermal insulation
Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
Mobility
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Sound insulation
up to 45-50 dB
Comparable to the insulation of a brick wall 25 cm thick
Advantages of building a steel structure building with profi-dom

Unlike permanent construction facilities
Cheaper by 30-40%

Steel structure buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°
C to +50°C
Saves up to 2,2% of the cadastral value annually
No property tax
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100%
thermal insulation
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Mobility
Comparable to the insulation of a brick wall 25 cm thick
Sound insulation
up to 45-50 dB
We will call you back within 3 minutes
Advantages of building a steel structure building with profi-dom

Unlike permanent construction facilities
Cheaper by 30-40%

Steel structure buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°
C to +50°C
Saves up to 2,2% of the cadastral value annually
No property tax
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100%
thermal insulation
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Mobility
Comparable to the insulation of a brick wall 25 cm thick
Sound insulation
up to 45-50 dB
We will call you back within 3 minutes
our company's services
- 01.
Building construction
We offer a full range of building construction services - from developing the design to handing over the finished property.
- 02.
We develop custom building designs taking all your wishes into account.
- 03.
obtaining permits
We take on the entire process of obtaining the permits required to start construction.
- 04.
Steel structures
We manufacture and install steel structures of any complexity - garages, hangars and warehouses.
- 05.
Interior finishing
We carry out interior finishing - from rough work to final finishes.
- 06.
Exterior finishing
We finish the facades from the foundation to the roof.
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe of building your steel structure building in 1 minute
catalogue of completed steel structure building projects
The price is given for shell construction, including the cost of building materials

Project No. 223 ShopBuilding area: 427 m²
Building footprint: 447,18 m²

Project No. 226 ShopBuilding area: 2077 m²
Building footprint: 2292 m²

Project No. 227 Swimming poolBuilding area: 2004 m²
Building footprint: 5654,4 m²

Project No. 229 TownhouseBuilding area: 117 m²
Building footprint: 480 m²

Project No. 230 TownhouseBuilding area: 228,61 m²
Building footprint: 1132,88 m²

Project No. 231 TownhouseBuilding area: 366,6 m²
Building footprint: 1000 m²

Project No. 632Total area: 13 824 m²
Building footprint: 13 824 m²
Customer reviews of prefabricated steel structure building construction in Almaty
Customer reviews of prefabricated steel structure building construction in Astana Your feedback matters a great deal to us






Stages of constructing a prefabricated steel structure building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Stages of constructing a prefabricated steel structure building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Stages of constructing a prefabricated steel structure building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Steel structure buildings in Astana
It solves a key challenge for Astana businesses — rapidly creating industrial space with a predictable budget. The technology makes it possible to erect a warehouse, workshop or logistics terminal in 2–4 months instead of the 1–2 years of conventional construction. A structure of steel frame and sandwich panels provides strength, energy efficiency and durability. This is a guide for owners and technical specialists — here you will find a detailed breakdown of the cost per m², installation timeframes and design requirements in Astana's conditions.
What prefabricated light steel structure buildings are and how they work
The evolutionary path: how construction in Astana moved from cinder block workshops to precise steel frames
As an alternative, we tried timber frames. But in Astana's climate, wood deformed from humidity swings, rotted and did not meet fire codes. These solutions did not catch on for industrial facilities.
Modern solutions elegantly resolve these problems. Factory production ensures millimetre precision. Installation is carried out at –25 °C using bolted connections instead of welding. A fixed estimate and short timeframes make the technology optimal for business, which is why steel structure building construction is exactly what is in demand.
Construction technologies: LMK vs LSTK — which to choose for a project in Astana
Parameter | LMF (light metal frame) | LGSF (thin-walled structures) |
Steel thickness | 3–8 mm | 0.8–2.5 mm |
Service life | 50+ years | 25–30 years |
Maximum span | Up to 30 m | Up to 12 m |
Load resistance | High (snow, wind, machinery) | Medium (requires reinforcement) |
Frame cost | Higher by 15–25% | Lower |
Cost of turnkey prefabricated steel structure building construction
Cost item | What it includes |
Design and approvals | Development of KM, KZh, KMD; architectural solutions; fire calculation; technical conditions. |
Foundation (pile-grillage) | Geological surveys; piles; concrete; rebar; foundation works. |
Metal frame (LMF) | Columns, trusses, ties; fabrication and anti-corrosion treatment; delivery of the structures. |
Enclosing structures (sandwich panels 120 mm) | Wall and roof sandwich panels; trim elements; fasteners; installation. |
Gates and doors | Sectional gates; swing gates; dock shelters (ramp covers); doors. |
Engineering systems | Heating; ventilation; electrics; water supply; sewerage; fire alarm. |
Installation works and logistics | Crew labour; crane rental; transport costs; technical supervision. |
TOTAL per m² ("warm envelope") | The building is fully ready for use. |
Expert advice from Yermek Rakhimzhanov, chief project engineer for steel structures: "Request a technical and commercial proposal with an itemised breakdown. If a contractor quotes a lump sum without a breakdown — that is a risk. Our experience shows: 70% of disputes with clients arise from unaccounted costs for the foundation or crane work."
Erecting steel structure buildings: realistic timeframes for the climate of Astana
Design (3–5 weeks). The engineer develops the structural scheme, calculates the loads and selects the grade of steel. At this stage the insulation thickness and the foundation type are determined. The finished design is approved by the fire service and the architectural authorities.
Fabrication of the steel frame (4–6 weeks). The factory cuts the profiles, welds the trusses and applies an anti-corrosion coating. Each element is labelled for quick assembly.
Foundation (2–4 weeks). A pile-grillage foundation is suitable for the steel frame. It is stable on Astana's loams and does not require a long curing time.
Construction of prefabricated steel structure buildings includes a final stage — installation (4–8 weeks). The crew assembles the frame, installs the panels and fits the roof and gates. Work is carried out at temperatures down to –20 °C using winter rigging.








Metal frame
Enclosing structures
Roofing systems
Design features




Metal frame
Enclosing structures
Roofing systems
Design features
Comparing technologies: steel frame vs reinforced concrete — which is more cost-effective for business
Criterion | Metal frame with sandwich panels | Monolithic reinforced concrete |
Construction time (1000 m²) | 2–4 months | 12–18 months |
Cost per m² | 155 000 – 290 000 Kzt | 350 000 – 500 000 Kzt |
Service life | 50 years | 100+ years |
Energy efficiency | High (with the right panels) | Low (requires insulation) |
Layout flexibility | Easy to dismantle and expand | Complex reconfigurations |
Foundation | Lightweight (piles) | Massive (slab) |
Site requirements and the regulatory framework for construction in Astana
Key requirements:
- Geology: Surveys are mandatory to determine the bearing capacity of the soil. Peat bogs and quicksand require soil replacement.
- Utilities: Availability of technical conditions for connection to the networks.
- Permits: Obtaining the urban development plan, the building permit and approval of the design by the fire service.
- Fire-retardant treatment of the frame (fire resistance rating R15–R45).
- Fire breaks of 6 to 18 metres.
- Installation of alarm and fire-suppression systems.
Expert advice from Yermek Rakhimzhanov, chief project engineer for steel structures: "Do not cut corners on geology. The 300 000 KZT saved on surveys turns into 3 000 000 on redoing the foundation after the first winter. We had a case where a client refused the surveys — a year later the corner of the building settled by 15 cm because of frost-heaving soil."
Operation and warranty for prefabricated steel structure buildings
Energy efficiency is the main advantage with competent design. A building with 150 mm panels holds heat like a brick wall 1.2 metres thick. But thermal bridges appear at the joints — quality installation eliminates this problem.
Technical supervision is a mandatory stage. The engineer monitors compliance with the design, the quality of the bolted connections and the tightness of the joints. Cutting corners on technical supervision leads to a skewed frame and freezing corners, which directly reduces the reliability of a solution such as a steel structure building.
How to choose a contractor for construction in Astana
Frequently asked questions about steel structure building construction in Astana
How long does it take to build such a building?
- Small facilities up to 500 m²: 3-4 weeks
- Medium buildings 500-2000 m²: 1,5-3 months
- Large facilities over 2000 m²: 3-5 months
What materials are used as enclosing structures in steel structure buildings?
- Sandwich panels: 50-200 mm thick, with various insulation materials (mineral wool, polystyrene, PIR)
- Profiled sheet: 0,5-1,5 mm thick, can be used with additional insulation
- Facade cassettes: metal thickness 0,7-2 mm, with the option of adding insulation
- Wall sandwich panels assembled element by element: allow a ventilated facade to be created
Are prefabricated steel structure buildings suitable for Astana's climate?
- Snow load: The snow load calculation for Astana must be significantly higher than for Almaty — 200-300 kg/m² and above, depending on the district and the prevailing wind direction.
- Wind load: The wind load in Astana is significantly higher than in Almaty and must be calculated for 45-50 m/s (0.45-0.5 kPa) and above, depending on the location. Steel structures must be designed to account for these high wind loads.
- Thermal insulation: Using sandwich panels 150-200 mm thick for the walls and 200-250 mm for the roof is necessary to achieve an acceptable thermal resistance coefficient. It is important to aim for a value of at least 5.5-6.5 m²·°C/W. Insulation with low thermal conductivity (PUR/PIR) is recommended.
- Frost resistance of steel: When designing steel structures, the grade of steel used for construction and its frost resistance must be taken into account. Low temperatures can affect the strength of the metal.
- Corrosion resistance: Anti-corrosion treatment of the steel structures, especially the welded joints, must be applied to protect against moisture and temperature swings.
Are there height restrictions for such buildings in Astana?
- Single-storey industrial buildings: Up to 15-18 metres. Wind loads must be taken into account during design.
- Multi-storey public buildings: It is recommended to limit the height to 4-5 storeys (18-20 metres) without additional measures.
- Greater number of storeys: Possible with special structural solutions, a reinforced frame, additional wind-protection measures and detailed calculations. Approval from the architectural and construction authorities is mandatory. The effect of wind loads on the stability of tall buildings must be taken into account.










































































