PROFI-DOM — construction company +7 (777) 327-97-34
ENRUKZ

Prefabricated steel structure buildings in Astana

and the region from 70 000 ₸*/m² in 1 month*Crew labour cost
calculate the construction cost

Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction

  • 200+ successfully completed projects in 25 years of work
  • Online broadcast of the construction progress 24/7*
  • Extended warranty from 5 years
  • 100% compliance with current
    standards: SNiP, SP, GOST

Prefabricated steel structure buildings in Astana

and the region

from 70 000 ₸*/m² in 1 month

*Crew labour cost

Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects in 25 years of work

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

Prefabricated steel structure buildings in Astana

and the region

from 70 000 ₸*/m² in 1 month

*Crew labour cost

Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects in 25 years of work

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

steel structure buildings we construct

COLD STORAGE WAREHOUSES
CAR SHOWROOMS
ADMINISTRATIVE BUILDINGS
OFFICES AND BUSINESS CENTRES
SERVICE STATIONS AND CAR REPAIR SHOPS
SHOPS
FRUIT STORAGE FACILITIES
vegetable storage facilities
SHOPPING CENTRES
RESTAURANTS AND CAFES
DORMITORIES
WORKSHOPS
get a consultationWe will call you back within 3 minutes

steel structure buildings we construct

HANGARSWAREHOUSESCAR WASHESHOTELS AND INNSOFFICES AND BUSINESS CENTRESINDUSTRIAL BUILDINGSWORKSHOPSCOLD STORAGE WAREHOUSESSERVICE STATIONS AND CAR REPAIR SHOPSSHOPPING CENTRESRESTAURANTS AND CAFESDORMITORIESSHOPSCAR SHOWROOMSADMINISTRATIVE BUILDINGSFRUIT STORAGE FACILITIESvegetable storage facilities
get a consultation

We will call you back within 3 minutes

steel structure buildings we construct

HANGARSWAREHOUSESCAR WASHESHOTELS AND INNSOFFICES AND BUSINESS CENTRESINDUSTRIAL BUILDINGSWORKSHOPSCOLD STORAGE WAREHOUSESSERVICE STATIONS AND CAR REPAIR SHOPSSHOPPING CENTRESRESTAURANTS AND CAFESDORMITORIESSHOPSCAR SHOWROOMSADMINISTRATIVE BUILDINGSFRUIT STORAGE FACILITIESvegetable storage facilities

We will call you back within 3 minutes

Cost of building a steel structure building in Astana

TERMMATERIALROUGH FINISHINGFINAL FINISHING
from 30 daysMetal frame filled with sandwich panelsfrom 70000 KZT/m2from 110000 KZT/m2
LEAVE A REQUESTWe will call you back within 3 minutes

Advantages of building a steel structure building with profi-dom

Cheaper by 30-40%

Unlike permanent construction facilities

10-point seismic resistance

Steel structure buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

Top quality class

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa

from -50°
C to +50°C

Maintaining the required temperature to within 0.5°C

No property tax

Saves up to 2,2% of the cadastral value annually

Resistance to natural disasters

They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

100%
thermal insulation

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards

Mobility

Relocating or expanding the building by 100% of its area takes only 2-3 weeks

Sound insulation
up to 45-50 dB

Comparable to the insulation of a brick wall 25 cm thick

LEAVE A REQUESTWe will call you back within 3 minutes

Advantages of building a steel structure building with profi-dom

Unlike permanent construction facilities

Cheaper by 30-40%

Steel structure buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa

Top quality class

Maintaining the required temperature to within 0.5°C

from -50°
C to +50°C

Saves up to 2,2% of the cadastral value annually

No property tax

They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards

100%
thermal insulation

Relocating or expanding the building by 100% of its area takes only 2-3 weeks

Mobility

Comparable to the insulation of a brick wall 25 cm thick

Sound insulation
up to 45-50 dB

We will call you back within 3 minutes

Advantages of building a steel structure building with profi-dom

Unlike permanent construction facilities

Cheaper by 30-40%

Steel structure buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa

Top quality class

Maintaining the required temperature to within 0.5°C

from -50°
C to +50°C

Saves up to 2,2% of the cadastral value annually

No property tax

They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards

100%
thermal insulation

Relocating or expanding the building by 100% of its area takes only 2-3 weeks

Mobility

Comparable to the insulation of a brick wall 25 cm thick

Sound insulation
up to 45-50 dB

We will call you back within 3 minutes

our company's services

  1. 01.

    Building construction

    We offer a full range of building construction services - from developing the design to handing over the finished property.

  2. 02.

    design →

    We develop custom building designs taking all your wishes into account.

  3. 03.

    obtaining permits

    We take on the entire process of obtaining the permits required to start construction.

  4. 04.

    Steel structures

    We manufacture and install steel structures of any complexity - garages, hangars and warehouses.

  5. 05.

    Interior finishing

    We carry out interior finishing - from rough work to final finishes.

  6. 06.

    Exterior finishing

    We finish the facades from the foundation to the roof.

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    5-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    A temporary fence is put up for tidy storage and strict control of building materials

  8. 08.
    Online monitoring of work progress

    You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

Answer 4 questions and get an estimate accurate to 95%

Find out the cost and timeframe of building your steel structure building in 1 minute

What type of building do you want to construct?

What area should the building be?

Do you already have a building design, or does a new one need to be developed?

Do you already have a plot for constructing the building?

One last step!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

catalogue of completed steel structure building projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Number of bedrooms
Project No. 220 Sports complexProject No. 220 Sports complex
Floors: 6
Building area: 3073 m²
230 475 000kzt
VIEW PROJECT
Project No. 1001 SchoolProject No. 1001 School
Floors: 3
Building area: 9507,4 m²
VIEW PROJECT
Project No. 1002 SchoolProject No. 1002 School
Floors: 4
Building area: 10102,52 m²
VIEW PROJECT
Project No. 221 CafeProject No. 221 Cafe
Floors: 1
Building area: 309 m²
23 175 000kzt
VIEW PROJECT

Develop a custom design for your steel structure building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34
Privacy Policy

Develop a custom design for your steel structure building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34
Privacy Policy

Develop a custom design for your steel structure building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34

Customer reviews of prefabricated steel structure building construction in Almaty

Customer reviews of prefabricated steel structure building construction in Astana Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!

Stages of constructing a prefabricated steel structure building

Preparatory work

Carrying out engineering surveys

Building design

Manufacture of building components at the factory

Erecting the building

Commissioning

Stages of constructing a prefabricated steel structure building

Preparatory work

Carrying out engineering surveys

Building design

Manufacture of building components at the factory

Erecting the building

Commissioning

Stages of constructing a prefabricated steel structure building

Preparatory work

Carrying out engineering surveys

Building design

Manufacture of building components at the factory

Erecting the building

Commissioning

Steel structure buildings in Astana

Author: Yermek Rakhimzhanov, chief engineer of steel structure projects

It solves a key challenge for Astana businesses — rapidly creating industrial space with a predictable budget. The technology makes it possible to erect a warehouse, workshop or logistics terminal in 2–4 months instead of the 1–2 years of conventional construction. A structure of steel frame and sandwich panels provides strength, energy efficiency and durability. This is a guide for owners and technical specialists — here you will find a detailed breakdown of the cost per m², installation timeframes and design requirements in Astana's conditions.

What prefabricated light steel structure buildings are and how they work

The structure consists of a steel frame and enclosing panels. The steel frame takes the loads, while the sandwich panels protect against cold and moisture. Modern solutions withstand snow of 1.5 kPa and wind of 23 m/s, which meets the standards for Astana. The insulation thickness is calculated for a winter temperature of –35 °C.

The evolutionary path: how construction in Astana moved from cinder block workshops to precise steel frames

Building a steel structure building has become a logical choice compared with traditional technologies. Ten years ago, industrial facilities were built from cinder block and precast reinforced concrete. Cinder block walls required a powerful foundation, and installation depended on the temperature. Reinforced concrete structures were expensive, and their erection took months. The main drawback was the inability to plan the budget precisely due to the constant rise in material prices.

As an alternative, we tried timber frames. But in Astana's climate, wood deformed from humidity swings, rotted and did not meet fire codes. These solutions did not catch on for industrial facilities.

Modern solutions elegantly resolve these problems. Factory production ensures millimetre precision. Installation is carried out at –25 °C using bolted connections instead of welding. A fixed estimate and short timeframes make the technology optimal for business, which is why steel structure building construction is exactly what is in demand.

Construction technologies: LMK vs LSTK — which to choose for a project in Astana

The choice between light metal structures and light steel thin-walled structures determines the budget and service life. The main trade-off of LSTK is assembly speed at the expense of load-bearing capacity. LMK is stronger but takes more time to assemble.

Parameter

LMF (light metal frame)

LGSF (thin-walled structures)

Steel thickness

3–8 mm

0.8–2.5 mm

Service life

50+ years

25–30 years

Maximum span

Up to 30 m

Up to 12 m

Load resistance

High (snow, wind, machinery)

Medium (requires reinforcement)

Frame cost

Higher by 15–25%

Lower

Cost of turnkey prefabricated steel structure building construction

The price per m² is made up of the type of frame, the insulation thickness and the engineering systems. A fixed estimate can only be drawn up after a soil survey. Cutting corners on the quality of the steel or insulation leads to higher heating and repair costs.


Cost item

What it includes

Design and approvals

Development of KM, KZh, KMD; architectural solutions; fire calculation; technical conditions.

Foundation (pile-grillage)

Geological surveys; piles; concrete; rebar; foundation works.

Metal frame (LMF)

Columns, trusses, ties; fabrication and anti-corrosion treatment; delivery of the structures.

Enclosing structures (sandwich panels 120 mm)

Wall and roof sandwich panels; trim elements; fasteners; installation.

Gates and doors

Sectional gates; swing gates; dock shelters (ramp covers); doors.

Engineering systems

Heating; ventilation; electrics; water supply; sewerage; fire alarm.

Installation works and logistics

Crew labour; crane rental; transport costs; technical supervision.

TOTAL per m² ("warm envelope")

The building is fully ready for use.

The flip side of a low price is hidden costs. Simplifying the frame reduces the safety margin, and thin insulation does not hold temperature in winter. The warranty on such facilities usually does not exceed 1 years.

Expert advice from Yermek Rakhimzhanov, chief project engineer for steel structures: "Request a technical and commercial proposal with an itemised breakdown. If a contractor quotes a lump sum without a breakdown — that is a risk. Our experience shows: 70% of disputes with clients arise from unaccounted costs for the foundation or crane work."

Erecting steel structure buildings: realistic timeframes for the climate of Astana

It takes 2–4 months for a 1000 m² building. The timeframe depends on three factors: project complexity, logistics and weather. Winter installation extends the process by 10–15%.

Design (3–5 weeks). The engineer develops the structural scheme, calculates the loads and selects the grade of steel. At this stage the insulation thickness and the foundation type are determined. The finished design is approved by the fire service and the architectural authorities.
Fabrication of the steel frame (4–6 weeks). The factory cuts the profiles, welds the trusses and applies an anti-corrosion coating. Each element is labelled for quick assembly.
Foundation (2–4 weeks). A pile-grillage foundation is suitable for the steel frame. It is stable on Astana's loams and does not require a long curing time.
Construction of prefabricated steel structure buildings includes a final stage — installation (4–8 weeks). The crew assembles the frame, installs the panels and fits the roof and gates. Work is carried out at temperatures down to –20 °C using winter rigging.
Metal frame
Metal frame
Enclosing structures
Enclosing structures
Roofing systems
Roofing systems
Design features
Design features

Metal frame

Enclosing structures

Roofing systems

Design features

Metal frame

Enclosing structures

Roofing systems

Design features

Comparing technologies: steel frame vs reinforced concrete — which is more cost-effective for business

An analysis of the key parameters shows the advantages of steel structures for commercial facilities. By choosing reinforced concrete for durability, you sacrifice commissioning speed and budget.

Criterion

Metal frame with sandwich panels

Monolithic reinforced concrete

Construction time (1000 m²)

2–4 months

12–18 months

Cost per m²

155 000 – 290 000 Kzt

350 000 – 500 000 Kzt

Service life

50 years

100+ years

Energy efficiency

High (with the right panels)

Low (requires insulation)

Layout flexibility

Easy to dismantle and expand

Complex reconfigurations

Foundation

Lightweight (piles)

Massive (slab)

Site requirements and the regulatory framework for construction in Astana

Before starting construction of a steel structure building, assess the site. It must have access roads, space for storing panels and the ability to connect to a temporary power supply.

Key requirements:
  • Geology: Surveys are mandatory to determine the bearing capacity of the soil. Peat bogs and quicksand require soil replacement.
  • Utilities: Availability of technical conditions for connection to the networks.
  • Permits: Obtaining the urban development plan, the building permit and approval of the design by the fire service.
Fire safety is a critical parameter. Steel structures are classified in fire hazard class K3. This requires:

  • Fire-retardant treatment of the frame (fire resistance rating R15–R45).
  • Fire breaks of 6 to 18 metres.
  • Installation of alarm and fire-suppression systems.

Expert advice from Yermek Rakhimzhanov, chief project engineer for steel structures: "Do not cut corners on geology. The 300 000 KZT saved on surveys turns into 3 000 000 on redoing the foundation after the first winter. We had a case where a client refused the surveys — a year later the corner of the building settled by 15 cm because of frost-heaving soil."

Operation and warranty for prefabricated steel structure buildings

The warranty on the steel frame is 10 years and on the sandwich panels 3–5 years. Operation requires an annual inspection of the frame, clearing snow off the roof and checking the seals.

Energy efficiency is the main advantage with competent design. A building with 150 mm panels holds heat like a brick wall 1.2 metres thick. But thermal bridges appear at the joints — quality installation eliminates this problem.

Technical supervision is a mandatory stage. The engineer monitors compliance with the design, the quality of the bolted connections and the tightness of the joints. Cutting corners on technical supervision leads to a skewed frame and freezing corners, which directly reduces the reliability of a solution such as a steel structure building.

How to choose a contractor for construction in Astana

Choosing the right contractor determines the success of the project. Turn to companies with experience working in Astana's climate, their own design office and a portfolio of completed projects. Check reviews and ask for an itemised estimate and a schedule. A reliable partner will build the facility on time, keep within budget and provide a warranty.

Frequently asked questions about steel structure building construction in Astana

How long does it take to build such a building?
Steel structure building construction is also notable for its high speed. The timeframe depends on the size and complexity of the project:

  • Small facilities up to 500 m²: 3-4 weeks
  • Medium buildings 500-2000 m²: 1,5-3 months
  • Large facilities over 2000 m²: 3-5 months
What materials are used as enclosing structures in steel structure buildings?
The following are most often used as enclosing structures:

  1. Sandwich panels: 50-200 mm thick, with various insulation materials (mineral wool, polystyrene, PIR)
  2. Profiled sheet: 0,5-1,5 mm thick, can be used with additional insulation
  3. Facade cassettes: metal thickness 0,7-2 mm, with the option of adding insulation
  4. Wall sandwich panels assembled element by element: allow a ventilated facade to be created
Are prefabricated steel structure buildings suitable for Astana's climate?
Yes, prefabricated steel structure buildings are suitable for Astana's climate, but the following factors must be taken into account:

  • Snow load: The snow load calculation for Astana must be significantly higher than for Almaty — 200-300 kg/m² and above, depending on the district and the prevailing wind direction.
  • Wind load: The wind load in Astana is significantly higher than in Almaty and must be calculated for 45-50 m/s (0.45-0.5 kPa) and above, depending on the location. Steel structures must be designed to account for these high wind loads.
  • Thermal insulation: Using sandwich panels 150-200 mm thick for the walls and 200-250 mm for the roof is necessary to achieve an acceptable thermal resistance coefficient. It is important to aim for a value of at least 5.5-6.5 m²·°C/W. Insulation with low thermal conductivity (PUR/PIR) is recommended.
  • Frost resistance of steel: When designing steel structures, the grade of steel used for construction and its frost resistance must be taken into account. Low temperatures can affect the strength of the metal.
  • Corrosion resistance: Anti-corrosion treatment of the steel structures, especially the welded joints, must be applied to protect against moisture and temperature swings.
Are there height restrictions for such buildings in Astana?
Height restrictions for steel structure buildings in Astana depend on urban planning codes, the type of building and the soil characteristics:

  • Single-storey industrial buildings: Up to 15-18 metres. Wind loads must be taken into account during design.
  • Multi-storey public buildings: It is recommended to limit the height to 4-5 storeys (18-20 metres) without additional measures.
  • Greater number of storeys: Possible with special structural solutions, a reinforced frame, additional wind-protection measures and detailed calculations. Approval from the architectural and construction authorities is mandatory. The effect of wind loads on the stability of tall buildings must be taken into account.
Phone:+7 (777) 327-97-34Our address:Astana, Kabanbay batyr, 7/2Daily: 9:00–21:00 (by appointment)