
Construction of industrial buildings and structures in Astana
and the region from 23 500 ₸*/m² in 1 month*Crew labour costCost-effective and versatile industrial buildings with guaranteed durability and energy efficiency, ensuring rapid commissioning and adaptability to any production tasks
Strict adherence to construction deadlines
High strength and durability
Material service life 50+ years
100% compliance with current
standards: SNiP, SP, GOST

Construction of industrial buildings and structures in Astana
and the region
from 23 500 ₸*/m² in 1 month
*Crew labour cost
Cost-effective and versatile industrial buildings with guaranteed durability and energy efficiency, ensuring rapid commissioning and adaptability to any production tasks
Strict adherence to construction deadlines
High strength and durability
Material service life 50+ years
100% compliance with current
standards: SNiP, SP, GOST

Construction of industrial buildings and structures in Astana
and the region
from 23 500 ₸*/m² in 1 month
*Crew labour cost
Cost-effective and versatile industrial buildings with guaranteed durability and energy efficiency, ensuring rapid commissioning and adaptability to any production tasks
Strict adherence to construction deadlines
High strength and durability
Material service life 50+ years
100% compliance with current
standards: SNiP, SP, GOST
materials we build industrial buildings from

brick



FINBLOCK

heat block



foam block





materials we build industrial buildings from













brick
AERATED CONCRETEMONOLITHFINBLOCK
heat block
GAS BLOCKSIP PANELSfoam block
FRAMEMODULESSandwich panelsPOLYSTYRENE CONCRETEsteel structuresWe will call you back within 3 minutes
materials we build industrial buildings from













brick
AERATED CONCRETEMONOLITHFINBLOCK
heat block
GAS BLOCKSIP PANELSfoam block
FRAMEMODULESSandwich panelsPOLYSTYRENE CONCRETEsteel structuresWe will call you back within 3 minutes
The cost of building an industrial building in Astana
| MATERIAL | TERM | SEISMIC RATING | SHELL | PRE-FINISH | FINISHED |
|---|---|---|---|---|---|
| SIP panel | 30 days | 9 points | from 75 000 KZT | - | from 165 000 KZT |
| Frame | 2 - 3 months | 9 points | from 75 000 KZT | - | from 185 000 KZT |
| Foam block | 2 - 3 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Gas block | 2 - 3 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Monolith | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Heat block | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Brick | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Finblock | 3 - 4 months | 9 points | from 98 000 KZT | from 140 000 KZT | from 170 000 KZT |
| Modules | 1 - 3 months | 9 points | from 75 000 KZT | - | from 145 000 KZT |
| MATERIAL | TERM | SEISMIC RATING | SHELL | PRE-FINISH | FINISHED |
|---|---|---|---|---|---|
| SIP panel | 30 days | 9 points | from 25 000 KZT | - | from 75 000 KZT |
| Frame | 2 - 3 months | 9 points | from 25 000 KZT | - | from 92 000 KZT |
| Foam block | 2 - 3 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Gas block | 2 - 3 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Monolith | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Heat block | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Brick | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Finblock | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
MATERIAL
TERM
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 75000 KZT
-
from 165000 KZT
Frame
2 - 3 months
9 points
from 75000 KZT
-
from 185000 KZT
Foam block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Gas block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Monolith
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Heat block
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Brick
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Finblock
3 - 4 months
9 points
from 98000 KZT
from 140000 KZT
from 170000 KZT
Modules
1 - 3 months
9 points
from 75000 KZT
-
from 145000 KZT
MATERIAL
TERM
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 25000 KZT
-
from 75000 KZT
Frame
2 - 3 months
9 points
from 25000 KZT
-
from 92000 KZT
Foam block
2 - 3 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Gas block
2 - 3 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Monolith
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Heat block
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Brick
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Finblock
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
MATERIAL
TERM
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 75000 KZT
-
from 165000 KZT
Frame
2 - 3 months
9 points
from 75000 KZT
-
from 185000 KZT
Foam block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Gas block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Monolith
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Heat block
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Brick
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Finblock
3 - 4 months
9 points
from 98000 KZT
from 140000 KZT
from 170000 KZT
Modules
1 - 3 months
9 points
from 75000 KZT
-
from 145000 KZT
MATERIAL
TERM
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 25000 KZT
-
from 75000 KZT
Frame
2 - 3 months
9 points
from 25000 KZT
-
from 92000 KZT
Foam block
2 - 3 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Gas block
2 - 3 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Monolith
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Heat block
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Brick
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Finblock
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
The advantages of building industrial buildings with Profi-Dom

25-50-year service life
With proper design and operation, industrial buildings last for decades

Energy efficiency
The walls are reliably protected by insulation, which helps reduce the cost of heating and air conditioning inside the industrial building

Cost
savings
Reduction of construction costs by up to 30% thanks to process optimisation

Eco-friendliness
The process of manufacturing and installing an industrial building places less strain on the environment
meeting
deadlines
Thanks to well-established processes and a professional team, we guarantee delivery of the property within the agreed timeframe

Seismic resistance of 10 points
Industrial buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
The advantages of building
industrial buildings with Profi-Dom

With proper design and operation, industrial buildings last for decades
25-50-year service life

The walls are reliably protected by insulation, which helps reduce the cost of heating and air conditioning inside the industrial building
Energy efficiency

Reduction of construction costs by up to 30% thanks to process optimisation
Cost
savings

The process of manufacturing and installing an industrial building places less strain on the environment
Eco-friendliness
Thanks to well-established processes and a professional team, we guarantee delivery of the property within the agreed timeframe
meeting
deadlines

Industrial buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
Seismic resistance of 10 points
We will call you back within 3 minutes
The advantages of building
industrial buildings with Profi-Dom

With proper design and operation, industrial buildings last for decades
25-50-year service life

The walls are reliably protected by insulation, which helps reduce the cost of heating and air conditioning inside the industrial building
Energy efficiency

Reduction of construction costs by up to 30% thanks to process optimisation
Cost
savings

The process of manufacturing and installing an industrial building places less strain on the environment
Eco-friendliness
Thanks to well-established processes and a professional team, we guarantee delivery of the property within the agreed timeframe
meeting
deadlines

Industrial buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
Seismic resistance of 10 points
We will call you back within 3 minutes
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe for building your industrial building in 1 minute
catalogue of completed industrial building projects
The price is given for shell construction, including the cost of building materials

Project No. 632Total area: 13 824 m²
Building footprint: 13 824 m²

Project No. 584Building area: 1120 m²
Building footprint: 1120 m²

Project No. 577Building area: 1080 m²
Building footprint: 1080 m²
Customer reviews of industrial building construction in Astana
Your feedback matters a great deal to us






Industrial and production buildings in Astana
When the owner of a plant in Astana faces the need to expand, the task before them is not simply to build another building. They are looking for a solution to a complex tangle of problems: how to avoid multimillion overruns, where to find a contractor who will not let them down on deadlines, and which technology to choose so that the facility starts turning a profit yesterday. At this point the operations manager is thinking about how the new site will be maintained, how energy-efficient it is and how much effort the approvals will take. It is at the intersection of these questions that the modern approach to building industrial buildings is born.
The evolutionary path: From brick boxes to intelligent construction kits
Alternatives were tried too - for example, precast reinforced concrete structures. They sped up the process but required heavy machinery and limited the architectural possibilities. This proved a dead end for medium-sized businesses that needed a fast and economical site. Modern prefabricated buildings made of steel structures elegantly solve these problems. They have turned the construction of production facilities in Astana from a complex and lengthy process into precise engineering work, where every element is calculated and manufactured at the factory and only assembly is carried out on site. This approach made it possible to cut timescales many times over and to give businesses the flexibility they need.
Prefabricated buildings versus permanent ones: the main trade-off
The main trade-off of permanent construction from brick and concrete is that for the sake of monumentality and prestige you have to put up with long timescales and high cost. Such a project pays off over decades.
Let us compare them in a table:
Criterion | Prefabricated facilities (PMB) | Permanent structures |
Construction time | 2-4 months | 12-24 months |
Cost per m² | Low | High |
Architectural flexibility | Limited | Practically unlimited |
Service life | 50+ years | 100+ years |
Option of dismantling | High | Low |



Design as the foundation of successful construction
Modern design is carried out in BIM systems. This makes it possible, even before the project is implemented, to walk through the entire workshop in 3D mode, position the equipment and simulate the flows of materials and people. This approach rules out situations where, after the shell is built, it turns out that a crane does not fit between the columns.
Key stages of turnkey construction in Astana
- Development of the design and estimate documentation. A detailed plan is created that passes all the necessary expert reviews.
- Site preparation and foundation construction. The type of foundation (strip, pile) is chosen based on the results of the geological survey.
- Installation of the steel frame. This is the load-bearing skeleton of the whole building. Its durability depends on the quality of the steel structures and their installation.
- Installation of the building envelope. The walls and roof are most often made of sandwich panels.
- Installation of the utility systems. Electrics, heating, ventilation, water supply - what turns the shell into a living organism.
- Commissioning of the facility. Preparing the documents and obtaining the permits.
Expert advice from Ainur Muratovna, head of industrial facility projects: “Always include a clause on designer supervision and technical supervision in your contract with the contractor. Our experience shows that the presence of an independent engineer on site reduces the number of installation errors and the use of non-GOST materials by 30%.”
How to choose a contractor for building industrial facilities
Ask the company for a portfolio of completed projects similar to yours. Pay attention to the deadlines in which they were handed over. Study the permit documentation: SRO approvals, material certificates. Be sure to talk to past clients. Find out how the company behaved when problems arose. A good contractor does not hide such information.
How much does it cost to build a production building in Astana
Element | Technology | Element |
Foundation | Strip | Foundation |
Frame | LGSF steel structures | Frame |
Walls, roof | Sandwich panels | Walls, roof |
Utilities | Standard set | Utilities |
Technical aspects and materials for industrial construction
The main trade-off of LGSF is that for the sake of light weight, ease of installation and resistance to rust, you have to put up with load limitations. It is not suitable for a multi-tonne press, but for a warehouse, a light assembly shop or a logistics complex it is the ideal solution.
Comparison of materials for the building envelope
Material | Thermal conductivity | Installation speed | Cost | Recommended use |
Sandwich panels | Low (high thermal insulation) | Very high | Medium/High | Heated workshops, warehouses, food production facilities |
Corrugated sheeting + insulation | Depends on the insulation | Medium | Low/Medium | Production facilities and warehouses without a permanent human presence |
Brick/Reinforced concrete | High (requires additional insulation) | Very low | High | Permanent facilities with special requirements |
Technical supervision: your insurance policy against contractor mistakes
- Conformity of the work carried out with the design documentation.
- The quality of the materials used (checks the certificates).
- Compliance with the installation process charts.
- Timely rectification of any defects found.
Skimping on technical supervision is like going without insurance. You may never find out what defects were hidden in the structure until an accident happens or the warranty expires.
Your industrial facility as a strategic asset
By making considered decisions at every stage and treating construction as a strategic investment, you get not just a building but a key asset that strengthens your market position and creates a stable basis for future growth in Astana and beyond.
Frequently asked questions about building industrial buildings in Astana
Which types of industrial buildings are the most in demand in Astana and the region?
- Production workshops
- Warehouse complexes
- Logistics centres
- Food production facilities
- Pharmaceutical plants
- Assembly plants
- Technology parks and industrial parks
What are the main stages involved in building an industrial building in Astana?
- Choosing and acquiring a land plot
- Development and approval of the design documentation
- Obtaining a building permit
- Preparation of the construction site
- Building the foundation
- Installation of the load-bearing structures
- Installation of the roof and facades
- Laying the utility networks
- Interior finishing and equipment installation
- Site landscaping
- Obtaining a permit to commission the facility
What specifics need to be taken into account when building industrial buildings in Astana?
Sharply continental climate:
- Cold winter: A long period of sub-zero temperatures (down to -40°C and below) requires the use of frost-resistant materials and careful thermal insulation. The depth of soil freezing (1.8-2 metres and more) must be taken into account when designing the foundation.
- Hot summer: High temperatures (up to +40°C) and intense solar radiation place demands on the materials' resistance to ultraviolet light and to deformation when heated.
- Large daily and annual temperature swings: Materials must withstand significant temperature fluctuations without losing their properties. This affects the choice of materials for the roof, facades and windows.
Soil conditions:
- Predominance of loams and clays: These soils are often frost-susceptible, which can deform the foundation during freezing and thawing. Measures are needed to protect against frost heave (insulating the blind area, installing drainage, replacing the soil).
- High groundwater level (in some areas): Requires waterproofing of the foundation and basement rooms. Seasonal fluctuations in the groundwater level must be taken into account.
- Collapsible soils (in certain areas): Require compaction or replacement of the base soil. Geological surveys are needed to identify collapsible soils.
- Presence of fill soils (on developed sites): Require strengthening or replacement. It is important to account for the uneven settlement of fill soils.
High wind activity: Astana is located in a steppe zone exposed to strong winds. Wind loads must be taken into account when designing the building frame, walls and roof.
Significant snow loads in winter: Require reinforcement of the roof structure and its regular clearing of snow.
Possible ice formation in winter: Measures must be provided to prevent ice forming on the plant's grounds and on the building's roof.
High solar exposure in summer: Requires sun protection measures (blinds, curtains, tinted glass) to reduce the heating of the rooms.
Seismicity: Astana is located in a zone of moderate seismic activity (up to 6 points on the MSK-64 scale). Seismic effects must be taken into account when designing the building.
Which building materials are most commonly used to erect industrial buildings in the region?
- Reinforced concrete structures (precast and monolithic)
- Steel structures
- Sandwich panels for walls and roof
- Profiled sheet
- Concrete blocks
- Brick (for the administrative parts of buildings)
- Modern thermal insulation materials
What permits and approvals need to be obtained to build an industrial facility in Astana?
- Permit to use the land plot
- Architectural and planning assignment (APA)
- Technical conditions for connection to the utility networks
- Approval of the design documentation
- Building permit
- An environmental assessment conclusion (for certain types of production)
- Approval with the fire service
- Permit to commission the facility
What are the main factors affecting the cost of building an industrial building in Astana and the region?
- The location and cost of the land plot
- The type and purpose of the industrial facility
- The size and structural complexity of the building
- The chosen building materials and technologies
- The need for special equipment and utility systems
- The cost of obtaining permits and approvals
- The cost of labour in the region
- Seismic requirements for the structure
- Environmental requirements and the cost of nature-protection measures
- Construction time









