PROFI-DOM — construction company +7 (777) 327-97-34
ENRUKZ

Construction of industrial buildings and structures in Astana

and the region from 23 500 ₸*/m² in 1 month*Crew labour cost
calculate the construction cost

Cost-effective and versatile industrial buildings with guaranteed durability and energy efficiency, ensuring rapid commissioning and adaptability to any production tasks

  • Strict adherence to construction deadlines
  • High strength and durability
  • Material service life 50+ years
  • 100% compliance with current
    standards: SNiP, SP, GOST

Construction of industrial buildings and structures in Astana

and the region

from 23 500 ₸*/m² in 1 month

*Crew labour cost

Cost-effective and versatile industrial buildings with guaranteed durability and energy efficiency, ensuring rapid commissioning and adaptability to any production tasks

Strict adherence to construction deadlines

High strength and durability

Material service life 50+ years

100% compliance with current
standards: SNiP, SP, GOST

Construction of industrial buildings and structures in Astana

and the region

from 23 500 ₸*/m² in 1 month

*Crew labour cost

Cost-effective and versatile industrial buildings with guaranteed durability and energy efficiency, ensuring rapid commissioning and adaptability to any production tasks

Strict adherence to construction deadlines

High strength and durability

Material service life 50+ years

100% compliance with current
standards: SNiP, SP, GOST

materials we build industrial buildings from

brick

AERATED CONCRETE
MONOLITH

FINBLOCK

heat block

GAS BLOCK
SIP PANELS

foam block

FRAME
MODULES
Sandwich panels
steel structures
POLYSTYRENE CONCRETE
ADVICE ON MATERIALSWe will call you back within 3 minutes

materials we build industrial buildings from

brick

AERATED CONCRETEMONOLITH

FINBLOCK

heat block

GAS BLOCKSIP PANELS

foam block

FRAMEMODULESSandwich panelsPOLYSTYRENE CONCRETEsteel structures
ADVICE ON MATERIALS

We will call you back within 3 minutes

materials we build industrial buildings from

brick

AERATED CONCRETEMONOLITH

FINBLOCK

heat block

GAS BLOCKSIP PANELS

foam block

FRAMEMODULESSandwich panelsPOLYSTYRENE CONCRETEsteel structures

We will call you back within 3 minutes

The cost of building an industrial building in Astana

MATERIALTERMSEISMIC RATINGSHELLPRE-FINISHFINISHED
SIP panel30 days9 pointsfrom 75 000 KZT-from 165 000 KZT
Frame2 - 3 months9 pointsfrom 75 000 KZT-from 185 000 KZT
Foam block2 - 3 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Gas block2 - 3 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Monolith3 - 4 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Heat block3 - 4 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Brick3 - 4 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Finblock3 - 4 months9 pointsfrom 98 000 KZTfrom 140 000 KZTfrom 170 000 KZT
Modules1 - 3 months9 pointsfrom 75 000 KZT-from 145 000 KZT
MATERIALTERMSEISMIC RATINGSHELLPRE-FINISHFINISHED
SIP panel30 days9 pointsfrom 25 000 KZT-from 75 000 KZT
Frame2 - 3 months9 pointsfrom 25 000 KZT-from 92 000 KZT
Foam block2 - 3 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Gas block2 - 3 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Monolith3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Heat block3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Brick3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Finblock3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Cost of work with materials per 1 m²

MATERIAL

TERM

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 75000 KZT

-

from 165000 KZT

Frame

2 - 3 months

9 points

from 75000 KZT

-

from 185000 KZT

Foam block

2 - 3 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Gas block

2 - 3 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Monolith

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Heat block

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Brick

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Finblock

3 - 4 months

9 points

from 98000 KZT

from 140000 KZT

from 170000 KZT

Modules

1 - 3 months

9 points

from 75000 KZT

-

from 145000 KZT

Cost of work with materials per 1 m²

MATERIAL

TERM

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 25000 KZT

-

from 75000 KZT

Frame

2 - 3 months

9 points

from 25000 KZT

-

from 92000 KZT

Foam block

2 - 3 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Gas block

2 - 3 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Monolith

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Heat block

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Brick

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Finblock

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Cost of work with materials per 1 m²

MATERIAL

TERM

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 75000 KZT

-

from 165000 KZT

Frame

2 - 3 months

9 points

from 75000 KZT

-

from 185000 KZT

Foam block

2 - 3 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Gas block

2 - 3 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Monolith

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Heat block

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Brick

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Finblock

3 - 4 months

9 points

from 98000 KZT

from 140000 KZT

from 170000 KZT

Modules

1 - 3 months

9 points

from 75000 KZT

-

from 145000 KZT

Cost of work with materials per 1 m²

MATERIAL

TERM

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 25000 KZT

-

from 75000 KZT

Frame

2 - 3 months

9 points

from 25000 KZT

-

from 92000 KZT

Foam block

2 - 3 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Gas block

2 - 3 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Monolith

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Heat block

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Brick

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Finblock

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

LEAVE A REQUESTWe will call you back within 3 minutes

The advantages of building industrial buildings with Profi-Dom

25-50-year service life

With proper design and operation, industrial buildings last for decades

Energy efficiency

The walls are reliably protected by insulation, which helps reduce the cost of heating and air conditioning inside the industrial building

Cost
savings

Reduction of construction costs by up to 30% thanks to process optimisation

Eco-friendliness

The process of manufacturing and installing an industrial building places less strain on the environment

meeting
deadlines

Thanks to well-established processes and a professional team, we guarantee delivery of the property within the agreed timeframe

Seismic resistance of 10 points

Industrial buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

LEAVE A REQUESTWe will call you back within 3 minutes

The advantages of building
industrial buildings with Profi-Dom

With proper design and operation, industrial buildings last for decades

25-50-year service life

The walls are reliably protected by insulation, which helps reduce the cost of heating and air conditioning inside the industrial building

Energy efficiency

Reduction of construction costs by up to 30% thanks to process optimisation

Cost
savings

The process of manufacturing and installing an industrial building places less strain on the environment

Eco-friendliness

Thanks to well-established processes and a professional team, we guarantee delivery of the property within the agreed timeframe

meeting
deadlines

Industrial buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

Seismic resistance of 10 points

We will call you back within 3 minutes

The advantages of building
industrial buildings with Profi-Dom

With proper design and operation, industrial buildings last for decades

25-50-year service life

The walls are reliably protected by insulation, which helps reduce the cost of heating and air conditioning inside the industrial building

Energy efficiency

Reduction of construction costs by up to 30% thanks to process optimisation

Cost
savings

The process of manufacturing and installing an industrial building places less strain on the environment

Eco-friendliness

Thanks to well-established processes and a professional team, we guarantee delivery of the property within the agreed timeframe

meeting
deadlines

Industrial buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

Seismic resistance of 10 points

We will call you back within 3 minutes

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    5-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    A temporary fence is put up for tidy storage and strict control of building materials

  8. 08.
    Online monitoring of work progress

    You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

Answer 7 questions and get an estimate accurate to 95%

Find out the cost and timeframe for building your industrial building in 1 minute

What type of industrial building do you need?

What is the planned area of the building?

What are the thermal insulation requirements for the building?

Is interior finishing of the rooms required?

What additional rooms do you need?

Do you already have a design for the industrial building, or does a new one need to be developed?

Do you already have a plot for building the industrial building?

One last step!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

catalogue of completed industrial building projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Project No. 629Project No. 629
Floors: 4
Total area: 2421 m²
Building footprint: 1920 m²
181 575 000kzt
VIEW PROJECT
Project No. 631Project No. 631
Floors: 2
Total area: 3300 m²
Building footprint: 2397 m²
247 500 000kzt
VIEW PROJECT
Project No. 632Project No. 632
Floors: 1
Total area: 13 824 m²
Building footprint: 13 824 m²
1 036 800 000kzt
VIEW PROJECT
Project No. 633Project No. 633
Floors: 1
Total area: 580 m²
Building footprint: 420 m²
43 500 000kzt
VIEW PROJECT

Develop a custom design for your industrial building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34
Privacy Policy

Develop a custom design for your industrial building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34
Privacy Policy

Develop a custom design for your industrial building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34

Customer reviews of industrial building construction in Astana

Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!

Industrial and production buildings in Astana

Author: Ainur Muratovna, head of industrial facility projects

When the owner of a plant in Astana faces the need to expand, the task before them is not simply to build another building. They are looking for a solution to a complex tangle of problems: how to avoid multimillion overruns, where to find a contractor who will not let them down on deadlines, and which technology to choose so that the facility starts turning a profit yesterday. At this point the operations manager is thinking about how the new site will be maintained, how energy-efficient it is and how much effort the approvals will take. It is at the intersection of these questions that the modern approach to building industrial buildings is born.

The evolutionary path: From brick boxes to intelligent construction kits

Fifteen years ago, building industrial structures meant erecting permanent brick or reinforced concrete buildings. The process resembled major capital construction: pouring the foundation, erecting the walls, installing the floors. All this took a year, or even two. Project budgets kept growing because of rising material prices and the complexity of the work. The main drawback of such solutions is their inflexibility. Reconfiguring a workshop for a new equipment line was practically impossible without a large-scale reconstruction.

Alternatives were tried too - for example, precast reinforced concrete structures. They sped up the process but required heavy machinery and limited the architectural possibilities. This proved a dead end for medium-sized businesses that needed a fast and economical site. Modern prefabricated buildings made of steel structures elegantly solve these problems. They have turned the construction of production facilities in Astana from a complex and lengthy process into precise engineering work, where every element is calculated and manufactured at the factory and only assembly is carried out on site. This approach made it possible to cut timescales many times over and to give businesses the flexibility they need.

Prefabricated buildings versus permanent ones: the main trade-off

By choosing prefabricated industrial buildings for record construction speed and low cost, we knowingly make a trade-off in architectural expressiveness. A standard metal box does not claim to be an architectural masterpiece. The flip side of the highest speed is certain limitations on the individuality of the design solutions.

The main trade-off of permanent construction from brick and concrete is that for the sake of monumentality and prestige you have to put up with long timescales and high cost. Such a project pays off over decades.

Let us compare them in a table:

Criterion

Prefabricated facilities (PMB)

Permanent structures

Construction time

2-4 months

12-24 months

Cost per m²

Low

High

Architectural flexibility

Limited

Practically unlimited

Service life

50+ years

100+ years

Option of dismantling

High

Low

Design as the foundation of successful construction

Designing industrial buildings is not just paperwork but the creation of a digital twin of the future asset. This stage shapes up to 90 % of the whole economics of the project. An error in calculating the loads on the frame or in choosing the insulation can raise heating and maintenance costs for decades. That is why building prefabricated production facilities starts with accurate, well-thought-out design, where every detail is calculated in advance - from the layout of the load-bearing elements to the utility systems and energy-efficient solutions.

Modern design is carried out in BIM systems. This makes it possible, even before the project is implemented, to walk through the entire workshop in 3D mode, position the equipment and simulate the flows of materials and people. This approach rules out situations where, after the shell is built, it turns out that a crane does not fit between the columns.

Key stages of turnkey construction in Astana

Turnkey construction of production facilities is a clear, sequential process in which every stage is critically important.
  1. Development of the design and estimate documentation. A detailed plan is created that passes all the necessary expert reviews.
  2. Site preparation and foundation construction. The type of foundation (strip, pile) is chosen based on the results of the geological survey.
  3. Installation of the steel frame. This is the load-bearing skeleton of the whole building. Its durability depends on the quality of the steel structures and their installation.
  4. Installation of the building envelope. The walls and roof are most often made of sandwich panels.
  5. Installation of the utility systems. Electrics, heating, ventilation, water supply - what turns the shell into a living organism.
  6. Commissioning of the facility. Preparing the documents and obtaining the permits.

Expert advice from Ainur Muratovna, head of industrial facility projects: “Always include a clause on designer supervision and technical supervision in your contract with the contractor. Our experience shows that the presence of an independent engineer on site reduces the number of installation errors and the use of non-GOST materials by 30%.”

How to choose a contractor for building industrial facilities

Choosing a contractor is the most important financial and management step. If you entrust the construction of production facilities in Astana to the first crew you come across, you risk ending up with a facility that has critical defects.

Ask the company for a portfolio of completed projects similar to yours. Pay attention to the deadlines in which they were handed over. Study the permit documentation: SRO approvals, material certificates. Be sure to talk to past clients. Find out how the company behaved when problems arose. A good contractor does not hide such information.

How much does it cost to build a production building in Astana

The cost of building industrial structures is not a fixed figure. It depends on dozens of factors. To get our bearings, let us look at averaged data in a table:

Element

Technology

Element

Foundation

Strip

Foundation

Frame

LGSF steel structures

Frame

Walls, roof

Sandwich panels

Walls, roof

Utilities

Standard set

Utilities

Expert advice from Ainur Muratovna, head of industrial facility projects: “When planning your budget, always set aside at least 10% for contingencies. In practice, even on a perfect site an old utility line may turn up that needs to be relocated, or force majeure weather may occur. It is better to have this money left over than to face downtime because of its shortage.”

Technical aspects and materials for industrial construction

The frame is the skeleton of your future production. Today two types dominate: a metal frame of structural steel and a frame of light gauge steel framing (LGSF). By choosing a classic steel frame for its load-bearing capacity for heavy equipment, you get time-proven reliability, but you sacrifice installation speed and part of the budget, which goes on anti-corrosion treatment.

The main trade-off of LGSF is that for the sake of light weight, ease of installation and resistance to rust, you have to put up with load limitations. It is not suitable for a multi-tonne press, but for a warehouse, a light assembly shop or a logistics complex it is the ideal solution.

Comparison of materials for the building envelope

Material

Thermal conductivity

Installation speed

Cost

Recommended use

Sandwich panels

Low (high thermal insulation)

Very high

Medium/High

Heated workshops, warehouses, food production facilities

Corrugated sheeting + insulation

Depends on the insulation

Medium

Low/Medium

Production facilities and warehouses without a permanent human presence

Brick/Reinforced concrete

High (requires additional insulation)

Very low

High

Permanent facilities with special requirements

Technical supervision: your insurance policy against contractor mistakes

Technical supervision is not an optional extra but a necessity. Your representative (the technical supervision engineer) is on site every day and monitors:
  • Conformity of the work carried out with the design documentation.
  • The quality of the materials used (checks the certificates).
  • Compliance with the installation process charts.
  • Timely rectification of any defects found.

Skimping on technical supervision is like going without insurance. You may never find out what defects were hidden in the structure until an accident happens or the warranty expires.

Your industrial facility as a strategic asset

Building production facilities in Astana stopped being simply about putting up walls and a roof long ago. Today it is a comprehensive task of creating a high-tech, efficient and flexible business environment that works for your profit.

By making considered decisions at every stage and treating construction as a strategic investment, you get not just a building but a key asset that strengthens your market position and creates a stable basis for future growth in Astana and beyond.

Frequently asked questions about building industrial buildings in Astana

Which types of industrial buildings are the most in demand in Astana and the region?
The following types of industrial buildings are the most in demand in Astana and the region:

  • Production workshops
  • Warehouse complexes
  • Logistics centres
  • Food production facilities
  • Pharmaceutical plants
  • Assembly plants
  • Technology parks and industrial parks
What are the main stages involved in building an industrial building in Astana?
The main stages of building an industrial building in Astana include:

  • Choosing and acquiring a land plot
  • Development and approval of the design documentation
  • Obtaining a building permit
  • Preparation of the construction site
  • Building the foundation
  • Installation of the load-bearing structures
  • Installation of the roof and facades
  • Laying the utility networks
  • Interior finishing and equipment installation
  • Site landscaping
  • Obtaining a permit to commission the facility
What specifics need to be taken into account when building industrial buildings in Astana?
Climate and soil specifics taken into account when building industrial buildings in Astana:

Sharply continental climate:
  • Cold winter: A long period of sub-zero temperatures (down to -40°C and below) requires the use of frost-resistant materials and careful thermal insulation. The depth of soil freezing (1.8-2 metres and more) must be taken into account when designing the foundation.
  • Hot summer: High temperatures (up to +40°C) and intense solar radiation place demands on the materials' resistance to ultraviolet light and to deformation when heated.
  • Large daily and annual temperature swings: Materials must withstand significant temperature fluctuations without losing their properties. This affects the choice of materials for the roof, facades and windows.

Soil conditions:
  • Predominance of loams and clays: These soils are often frost-susceptible, which can deform the foundation during freezing and thawing. Measures are needed to protect against frost heave (insulating the blind area, installing drainage, replacing the soil).
  • High groundwater level (in some areas): Requires waterproofing of the foundation and basement rooms. Seasonal fluctuations in the groundwater level must be taken into account.
  • Collapsible soils (in certain areas): Require compaction or replacement of the base soil. Geological surveys are needed to identify collapsible soils.
  • Presence of fill soils (on developed sites): Require strengthening or replacement. It is important to account for the uneven settlement of fill soils.

High wind activity: Astana is located in a steppe zone exposed to strong winds. Wind loads must be taken into account when designing the building frame, walls and roof.

Significant snow loads in winter: Require reinforcement of the roof structure and its regular clearing of snow.

Possible ice formation in winter: Measures must be provided to prevent ice forming on the plant's grounds and on the building's roof.

High solar exposure in summer: Requires sun protection measures (blinds, curtains, tinted glass) to reduce the heating of the rooms.

Seismicity: Astana is located in a zone of moderate seismic activity (up to 6 points on the MSK-64 scale). Seismic effects must be taken into account when designing the building.
Which building materials are most commonly used to erect industrial buildings in the region?
The following are often used to build industrial buildings in Astana and the region:

  • Reinforced concrete structures (precast and monolithic)
  • Steel structures
  • Sandwich panels for walls and roof
  • Profiled sheet
  • Concrete blocks
  • Brick (for the administrative parts of buildings)
  • Modern thermal insulation materials
What permits and approvals need to be obtained to build an industrial facility in Astana?
To build an industrial facility in Astana you need to obtain:

  • Permit to use the land plot
  • Architectural and planning assignment (APA)
  • Technical conditions for connection to the utility networks
  • Approval of the design documentation
  • Building permit
  • An environmental assessment conclusion (for certain types of production)
  • Approval with the fire service
  • Permit to commission the facility
What are the main factors affecting the cost of building an industrial building in Astana and the region?
The cost of building an industrial building in Astana is affected by the following factors:

  • The location and cost of the land plot
  • The type and purpose of the industrial facility
  • The size and structural complexity of the building
  • The chosen building materials and technologies
  • The need for special equipment and utility systems
  • The cost of obtaining permits and approvals
  • The cost of labour in the region
  • Seismic requirements for the structure
  • Environmental requirements and the cost of nature-protection measures
  • Construction time
Phone:+7 (777) 327-97-34Our address:Astana, Kabanbay batyr, 7/2Daily: 9:00–21:00 (by appointment)