PROFI-DOM — construction company +7 (777) 327-97-34
ENRUKZ

House construction in Astana


and the region from 45 000 ₸*/m², 3 months*Crew labour cost
calculate the construction cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

  • 200+ successfully completed projects in 25 years of work
  • Online broadcast of the construction progress 24/7*
  • Extended warranty from 5 years
  • 100% compliance with current
    standards: SNiP, SP, GOST

House construction in Astana

and the region

from 45 000 ₸*/m², 3 months

*Crew labour cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects in 25 years of work

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

House construction in Astana

and the region

from 45 000 ₸*/m², 3 months

*Crew labour cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects in 25 years of work

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

materials we build houses from

brick
AERATED CONCRETE
MONOLITH

FINBLOCK

heat block

GAS BLOCK
SIP PANELS
foam block
FRAME
MODULES

wood

timber

glued laminated timber

double timber

profiled timber

Sandwich panels
POLYSTYRENE CONCRETE
ADVICE ON MATERIALSWe will call you back within 3 minutes

materials we build houses from

brickAERATED CONCRETEMONOLITH

FINBLOCK

heat block

GAS BLOCKSIP PANELSfoam blockFRAMEMODULES

wood

timber

profiled timber

double timber

glued laminated timber

Sandwich panelsPOLYSTYRENE CONCRETE
ADVICE ON MATERIALS

We will call you back within 3 minutes

materials we build houses from

brickAERATED CONCRETEMONOLITH

FINBLOCK

heat block

GAS BLOCKSIP PANELSfoam blockFRAMEMODULES

wood

timber

profiled timber

double timber

glued laminated timber

Sandwich panelsPOLYSTYRENE CONCRETE

We will call you back within 3 minutes

Cost of building a house in Astana

MATERIALTermSEISMIC RATINGSHELLPRE-FINISHFINISHED
SIP panel30 days9 pointsfrom 85 000 KZT-from 170 000 KZT
Frame2 - 3 months9 pointsfrom 85 000 KZT-from 170 000 KZT
Foam block2 - 3 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Gas block2 - 3 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Monolith3 - 4 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Heat block3 - 4 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Brick3 - 4 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Finblock3 - 4 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Sandwich panels-9 pointsfrom 90 000 KZTfrom 90 000 KZTfrom 170 000 KZT
Polystyrene concrete-9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
MATERIALTermSEISMIC RATINGSHELLPRE-FINISHFINISHED
SIP panel30 days9 pointsfrom 25 000 KZT-from 75 000 KZT
Frame2 - 3 months9 pointsfrom 25 000 KZT-from 92 000 KZT
Foam block2 - 3 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Gas block2 - 3 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Monolith3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Heat block3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Brick3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Finblock3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Sandwich panels-9 pointsfrom 25 000 KZT-from 75 000 KZT
Polystyrene concrete-9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Cost of work with materials per 1 m²

MATERIAL

Term

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 85000 KZT

-

from 170000 KZT

Frame

2 - 3 months

9 points

from 85000 KZT

-

from 170000 KZT

Foam block

2 - 3 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Gas block

2 - 3 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Monolith

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Heat block

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Brick

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Finblock

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Sandwich panels

-

9 points

from 90000 KZT

from 90000 KZT

from 170000 KZT

Polystyrene
concrete

-

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Cost of work with materials per 1 m²

MATERIAL

Term

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 25000 KZT

-

from 75000 KZT

Frame

2 - 3 months

9 points

from 25000 KZT

-

from 92000 KZT

Foam block

2 - 3 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Gas block

2 - 3 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Monolith

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Heat block

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Brick

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Finblock

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Sandwich panels

-

9 points

from 25000 KZT

-

from 75000 KZT

Polystyrene concrete

-

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Cost of work with materials per 1 m²

MATERIAL

Term

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 85000 KZT

-

from 170000 KZT

Frame

2 - 3 months

9 points

from 85000 KZT

-

from 170000 KZT

Foam block

2 - 3 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Gas block

2 - 3 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Monolith

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Heat block

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Sandwich panels

Brick

-

3 - 4 months

9 points

9 points

from 90000 KZT

from 125000 KZT

from 90000 KZT

from 175000 KZT

from 170000 KZT

from 225000 KZT

Polystyrene
concrete

Finblock

-

3 - 4 months

9 points

9 points

from 125000 KZT

from 125000 KZT

from 175000 KZT

from 175000 KZT

from 225000 KZT

from 225000 KZT

Cost of work with materials per 1 m²

MATERIAL

Term

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 25000 KZT

-

from 75000 KZT

Frame

2 - 3 months

9 points

from 25000 KZT

-

from 92000 KZT

Foam block

2 - 3 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Gas block

2 - 3 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Monolith

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Heat block

3 - 4 months

9 points

from 45000 KZT

from 65000 KZT

from 76000 KZT

Sandwich panels

Brick

-

3 - 4 months

9 points

9 points

from 25000 KZT

from 45000 KZT

-

from 65000 KZT

from 75000 KZT

from 76000 KZT

Polystyrene concrete

Finblock

-

3 - 4 months

9 points

9 points

from 45000 KZT

from 45000 KZT

from 65000 KZT

from 65000 KZT

from 76000 KZT

from 76000 KZT

The cost of building modular houses can be found

at this link
LEAVE A REQUEST

We will call you back within 3 minutes

The cost of building modular houses can be found

at this link

We will call you back within 3 minutes

The cost of building modular houses can be found

at this link

We will call you back within 3 minutes

our company's services

01.

02.

03.

House construction

design →

obtaining permits

We offer a full range of private house construction services - from developing the design to handing over the finished property.

We develop custom designs for cottages, houses and garages, taking all your wishes into account.

We take on the entire process of obtaining the permits required to start construction.

04.

05.

06.

Steel structures

Interior finishing

Exterior finishing

We manufacture and install steel structures of any complexity - garages, hangars and warehouses.

We carry out interior finishing - from rough work to final finishes.

We finish the facades from the foundation to the roof.

our company's services

01.

02.

03.

04.

05.

06.

House construction

design →

obtaining permits

Steel structures

Interior finishing

Exterior finishing

We offer a full range of private house construction services - from developing the design to handing over the finished property.

We develop custom designs for cottages, houses and garages, taking all your wishes into account.

We take on the entire process of obtaining the permits required to start construction.

We manufacture and install steel structures of any complexity - garages, hangars and warehouses.

We carry out interior finishing - from rough work to final finishes.

We finish the facades from the foundation to the roof.

our company's services

01.

02.

03.

04.

05.

06.

House construction

design →

obtaining permits

Steel structures

Interior finishing

Exterior finishing

We offer a full range of private house construction services - from developing the design to handing over the finished property.

We develop custom designs for cottages, houses and garages, taking all your wishes into account.

We take on the entire process of obtaining the permits required to start construction.

We manufacture and install steel structures of any complexity - garages, hangars and warehouses.

We carry out interior finishing - from rough work to final finishes.

We finish the facades from the foundation to the roof.

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    5-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    A temporary fence is put up for tidy storage and strict control of building materials

  8. 08.
    Online monitoring of work progress

    You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

Answer 6 questions and get an estimate accurate to 95%

Find out the construction cost and timeframe in 1 minute

What type of house do you want to build?

What materials should the house be built from?

What should the area of the house be?

Do you already have a house design, or does a new one need to be developed?

Do you already have a plot for building a house?

What type of roofing would you like?

One last step!

You can view the results as soon as you enter and send your number!

+7

catalogue of completed projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Number of bedrooms
Garage
Project No. 1Project No. 1
Floors: 1
Living area: 67 m²
Building footprint: 75 m²
6 750 000kzt
VIEW PROJECT
Project No. 2Project No. 2
Floors: 1
House area: 107,5 m²
Building footprint: 191,8 m²
16 303 000kzt
VIEW PROJECT
Project No. 3Project No. 3
Floors: 1
House area: 92 m²
Building footprint: 92 m²
8 280 000kzt
VIEW PROJECT
Project No. 4Project No. 4
Floors: 1
House area: 84,2 m²
Building footprint: 100 m²
8 500 000kzt
VIEW PROJECT

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34

types of buildings we construct

Cottages

Industrial buildings

Private houses

Buildings

Residential complexes

Prefabricated buildings

Modular buildings

Hangars

Warehouses

Car washes

Hotels and inns

Offices and business centres

Service stations and car repair shops

Shops

Fruit and vegetable storage facilities

Buildings made of sandwich panels and steel structures

Workshops

Shopping centres

Restaurants and cafes

Cold storage warehouses

Dormitories

Administrative buildings

Pharmacies

Car showrooms

Industrial buildings

types of buildings we construct

Private
houses

Cottages

Buildings

Residential
complexes

Prefabricated buildings

Modular
buildings

Hangars

Warehouses

Car washes

Hotels
and inns

Offices and business centres

Service stations and car repair shops

Industrial buildings

Shops

Fruit and vegetable storage facilities

Buildings made of sandwich panels and steel structures

Workshops

Shopping centres

Restaurants
and cafes

Cold storage warehouses

Dormitories

Administrative buildings

Pharmacies

Car showrooms

types of buildings we construct

Private
houses

Cottages

Buildings

Residential
complexes

Prefabricated buildings

Modular
buildings

Hangars

Warehouses

Car washes

Hotels
and inns

Offices and business centres

Service stations and car repair shops

Industrial buildings

Shops

Fruit and vegetable storage facilities

Buildings made of sandwich panels and steel structures

Workshops

Shopping centres

Restaurants
and cafes

Cold storage warehouses

Dormitories

Administrative buildings

Pharmacies

Car showrooms

Customer reviews of house construction in Astana

Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!

STAGES OF HOUSE CONSTRUCTION

Utilities beneath the foundation

Pouring the foundation with concrete

Laying a course of gas blocks on mortar

Reinforcement of the first course of masonry

Laying standard blocks on adhesive

Reinforcement of every fourth course of masonry

Installing formwork for the reinforced ring beam under the floors

Installing the wall plate

Installation of the rafter system (beams, posts, rafters, sill beam)

Laying the roof covering

Installing windows and doors

Foundation insulation

Electrical wiring

Water supply

Heating

Exterior finishing

Interior finishing

STAGES OF HOUSE CONSTRUCTION

Utilities beneath the foundation

Pouring the foundation with concrete

Laying a course of gas blocks on mortar

Reinforcement of the first course of masonry

Laying standard blocks on adhesive

Reinforcement of every fourth course of masonry

Installing formwork for the reinforced ring beam under the floors

Installing the wall plate

Installation of the rafter system (beams, posts, rafters, sill beam)

Laying the roof covering

Installing windows and doors

Foundation insulation

Electrical wiring

Water supply

Heating

Exterior finishing

Interior finishing

STAGES OF HOUSE CONSTRUCTION

Utilities beneath the foundation

Pouring the foundation with concrete

Laying a course of gas blocks on mortar

Reinforcement of the first course of masonry

Laying standard blocks on adhesive

Reinforcement of every fourth course of masonry

Installing formwork for the reinforced ring beam under the floors

Installing the wall plate

Installation of the rafter system (beams, posts, rafters, sill beam)

Laying the roof covering

Installing windows and doors

Foundation insulation

Electrical wiring

Water supply

Heating

Exterior finishing

Interior finishing

Turnkey house in Astana

Dreaming of a comfortable and reliable home in the capital? PROFI-DOM, with more than 10- years of experience in the market, offers professional construction services in Astana, from developing a custom design to handing over the facility turnkey.

Why choose PROFI-DOM?

By choosing PROFI-DOM to order the construction of your house, you get not just a contractor but a reliable partner who takes on all the concerns of delivering your project. We are proud of our reputation and offer the following concrete advantages:

  • Individual approach and flexibility: we develop designs that take your unique needs and budget into account. More than 80% of our projects are bespoke solutions tailored to specific client requests.
  • Transparency and budget control: we provide a detailed estimate at every stage of construction, which lets you keep track of costs and avoid unpleasant surprises. Deviation from the estimate usually does not exceed 3-5% and is always agreed with the client.
  • Quality materials and modern technologies: we use only certified materials from trusted suppliers. Our houses are built using modern technologies, such as energy-efficient heating and ventilation systems, that make it possible to cut utility bills by up to 30%.

Turnkey house construction, stages

At PROFI-DOM we understand that it is important for you to know all the details of the house-building process in Astana. So let us look at each stage in detail, so that you understand how we turn a dream into reality.

Pre-design preparation and plot selection

We do not simply take on any plot; we carefully analyse its potential. Geological surveys are needed to understand the soil type, the groundwater level and the bearing capacity. This determines the type of foundation that will be most suitable and cost-effective. We also study the regulatory requirements for developing this plot - height restrictions, setbacks from the boundaries and the permitted use of the land. All of this helps avoid problems with approvals in the future. We help with choosing a plot for building country houses in Astana, taking into account its location, infrastructure, environmental conditions and personal preferences. We hold consultations with lawyers and realtors to make sure the deal is legally clean.

Design

After the plot has been chosen, we move on to the design stage. This is where dreams take shape. Our architects carefully listen to all your wishes: the number of rooms, their size and layout, the style of the house, the budget. We develop several layout options so that you can choose the most suitable one. We use modern software to create a 3D visualisation of the future house. This lets you see how it will look in reality and make any necessary adjustments. At the design stage we take into account all the engineering aspects: the location of the utilities and the heating, ventilation and air-conditioning systems. The design goes through several rounds of approval with you to make sure it fully meets your expectations. Particular attention is paid to the seismic resistance of the structure, taking into account the features of the region. All designs comply with the building codes and regulations (SNiP) of the Republic of Kazakhstan.

Site preparation and foundation for building a house in Astana

A properly prepared plot and a reliable foundation are the key to a durable house. We clear the plot of vegetation, level the surface and remove debris. Then we begin the earthworks: digging the pit or trenches for the foundation. We use modern machinery to carry out this work quickly and to a high standard. The type of foundation is chosen on the basis of geological surveys and the house design. We use strip, pile or slab foundations. A strip foundation is for houses with heavy walls. A pile foundation is for plots with unstable soil. A slab foundation is for houses with a large footprint. When pouring the foundation, we use high-quality concrete and reinforcement, which ensures its strength and durability. We strictly follow the concrete-pouring technology: vibrating, compacting and curing the concrete as it hardens. This guarantees the absence of cracks and voids in the foundation. We waterproof the foundation to protect it from groundwater.

Erecting the shell of the house

Once the foundation is ready, we begin erecting the shell of the house. The walls are built from various materials: brick, aerated concrete, wood, SIP panels. Brick is strong and durable but requires additional thermal insulation. Aerated concrete is light and warm but requires protection from moisture. Wood is eco-friendly and warm but requires special treatment against rot and fire. We use only certified materials from trusted suppliers. When erecting the walls, we strictly observe the geometry of the masonry to ensure even walls and corners. We pay special attention to wall insulation, using modern materials such as mineral wool, polystyrene foam or ecowool. This helps reduce heating and air-conditioning costs. The roof is made of metal tiles, bituminous shingles or natural tiles. Metal tiles are strong and durable but can be noisy during rain. Bituminous shingles are flexible and silent but less durable. Natural tiles are eco-friendly and beautiful but expensive. We carry out waterproofing and vapour insulation of the roof to protect it from moisture and condensation.

Laying the utility networks

Utility networks are the basis of comfort in a home. We install all the necessary services if you choose to build your house with us: electricity, water supply, sewerage, heating, ventilation and air conditioning. We use only certified equipment and materials from leading manufacturers. Electricity: we install the distribution board, run the wiring, and fit sockets, switches and lighting fixtures. Water supply: we connect the house to the central water supply system or install a borehole. We lay the water supply pipes and install plumbing fixtures: sinks, toilets, baths and shower cubicles. Sewerage: we connect the house to the central sewerage system or install a septic tank. We lay the sewerage pipes and install the sewer risers. Heating: we install a heating system - a gas boiler, an electric boiler or a solid-fuel boiler. We lay the heating pipes and install radiators or an underfloor heating system. Ventilation and air conditioning: we install a ventilation and air conditioning system to ensure fresh air and a comfortable temperature in the home.

Interior finishing

Interior finishing is the final stage of house construction, where we create a cosy and stylish interior that reflects your individuality. We carry out all types of finishing work: plastering, filling, painting walls, laying tiles, laying laminate, installing doors and windows. We offer a wide choice of finishing materials from leading manufacturers. When choosing materials, we take your style preferences and budget into account. We strictly follow the finishing-work technology to ensure a high-quality and durable result. We work with professional interior designers who will help you create a unique and functional interior. We install kitchen furniture, plumbing fixtures, lighting fixtures and other interior elements.

How to choose materials for building a house in Astana: Tips from PROFI-DOM

Choosing materials for a house is an investment in its future, comfort and energy efficiency. PROFI-DOM offers expert recommendations on the choice, taking into account the climatic features of Astana, your budget and your preferences.

Let us look at the most popular options and their key characteristics:

1. For the walls:

  • Brick (ceramic, sand-lime):
Properties: Strong, durable (service life over 100 years), fire-resistant (withstands temperatures up to 1000°C), eco-friendly. Good sound insulation (up to 50 dB).
Advantages: A classic and reliable choice. Provides good thermal inertia (it heats up and cools down slowly), which is important for maintaining a stable temperature in the house. Resistant to weathering.
Disadvantages: High cost (from 300 KZT per unit), requires additional thermal insulation (thermal conductivity coefficient around 0.5-0.8 W/(m·K)) to meet modern energy-efficiency standards. A labour-intensive laying process (around 50 bricks per m²). Considerable weight, requiring a reinforced foundation (load from 1200 kg/m³).
Application: Load-bearing walls, partitions, facade cladding.

  • Aerated concrete (gas blocks):
Properties: Light (density from 300 to 700 kg/m³), porous (pores take up to 85% of the volume), retains heat well (thermal conductivity coefficient from 0.1 to 0.2 W/(m·K)), relatively inexpensive (from 15 000 KZT/m³). Easy to work (it can be sawn and drilled).
Advantages: An economical option. High construction speed (laying is up to 2 times faster than with brick). Good thermal insulation that reduces heating costs (savings of up to 40%).
Disadvantages: Requires protection from moisture (water absorption up to 30% by weight) – waterproofing and finishing are mandatory. Lower strength compared with brick (compressive strength from 2 to 5 MPa). The need to use special fasteners.
Application: Load-bearing walls, partitions.

  • Wood (log, timber, frame structures):
Properties: An eco-friendly, “breathing” material (vapour permeability around 50-100 mg/(m·h·Pa)). Good thermal insulation (especially glued laminated timber - thermal conductivity coefficient around 0.12-0.18 W/(m·K)). Creates a comfortable microclimate in the house.
Advantages: Prefabricated structures (especially frame ones – up to 3 months). Natural beauty and cosiness. A relatively low weight that reduces the demands on the foundation.
Disadvantages: Requires regular treatment with antiseptics and fire retardants (treatment cost around 1000-2000 KZT/m² per year) – protection against rot and fire. Shrinkage (up to 5-10% for logs and timber). High cost of quality material (from 50 000 KZT/m³).
Application: Country houses, dachas, bathhouses.

  • SIP panels (structural insulated panels):
Properties: High thermal insulation (thermal conductivity coefficient around 0.02-0.03 W/(m·K)), fast installation (up to 5 days for the house shell), relatively low cost (from 25 000 KZT/m²). Light weight (around 15-20 kg/m²).
Advantages: Very high construction speed. Excellent energy efficiency (heating costs reduced by up to 60%). Easy installation.
Disadvantages: Low vapour permeability (good ventilation is required – the cost of a ventilation system starts from 200 000 KZT). A strict installation technology must be followed. Limited fire resistance (fire-resistance limit around 15-30 minutes).
Application: Frame houses, dachas, garages.

2. For the roof:

  • Metal roof tiles:
Properties: Strong (service life over 50 years), durable, light (around 5 kg/m²), relatively inexpensive (from 3000 KZT/m²). A wide colour range (over 200 colours).
Advantages: Fast installation. Resistance to weathering. Light weight that reduces the load on the rafter system.
Disadvantages: Noisy during rain (noise level up to 70 dB). Prone to corrosion (if the protective layer, 25-50 µm thick, is damaged).
Application: Roofing for residential houses and commercial buildings.

  • Bituminous shingles (soft roofing):
Properties: Flexible, silent (noise level up to 40 dB), resistant to temperature swings (from -40°C to +100°C). A wide choice of colours and shapes (over 100 types).
Advantages: Excellent sound insulation. Easy to install on complex roofs. Not prone to corrosion.
Disadvantages: Less durable than metal roof tiles (service life around 20-30 years). Requires a solid base (OSB or plywood). Cost from 5000 KZT/m².
Application: Roofing for residential houses and cottages.

  • Natural tiles (ceramic, cement-sand):
Properties: Beautiful, durable (service life over 100 years), eco-friendly. Excellent sound insulation. Weight around 40-70 kg/m².
Advantages: Prestigious appearance. A very long service life. Resistance to weathering.
Disadvantages: High cost (from 15 000 KZT/m²). Heavy weight requiring a reinforced rafter system. Complex installation.
Application: Roofing for premium houses and cottages.

3. For facade finishing:

  • Plaster (mineral, acrylic, silicone):
Properties: Protection of the walls from weathering and an attractive appearance. A variety of colours and textures (over 500 options). Vapour permeability around 80-120 g/m² per day.
Advantages: Relatively inexpensive (from 1500 KZT/m²). Easy to apply.
Disadvantages: Requires periodic renewal (every 5-10 years). Prone to soiling.
Application: Facade finishing for residential houses and commercial buildings.

  • Facing brick:
Properties: Strong, durable (service life over 50 years), attractive. Protection of the walls from weathering. Water absorption up to 6%.
Advantages: Prestigious appearance. Long service life.
Disadvantages: High cost (from 5000 KZT/m²). A labour-intensive laying process.
Application: Facade finishing for residential houses and cottages.

  • Siding (vinyl, metal):
Properties: Light (around 2 kg/m²), inexpensive (from 1000 KZT/m²), easy to install. Protection of the walls from weathering. Operating temperature range from -50°C to +50°C.
Advantages: Fast installation. Requires no special maintenance. A wide choice of colours (over 100 colours).
Disadvantages: Less durable than other materials (service life around 20-30 years). Prone to fading (especially dark colours).
Application: Facade finishing for residential houses and dachas.

How much does it cost to build a house in Astana?

The question of the cost of building a house is always relevant. The price depends on many factors, including the area of the house, the type of design, the materials used, the complexity of the work and the cost of the plot.

The average cost of building a square metre of housing in Astana ranges from 130 000 KZT depending on the chosen materials and the complexity of the project. For example, building cottages from brick costs more than from aerated concrete.
PROFI-DOM offers a variety of project options to suit your budget. We help you optimise costs without cutting corners on quality. We provide a detailed construction estimate so that you know exactly what you are paying for.

We build houses, bringing dreams to life

We believe that every house should be unique and reflect the individuality of its owners. That is why we offer an individual approach to each client, taking all your wishes and needs into account. We build houses that become a true home, a place where you want to live and raise children.

Your home is our concern! Order the construction of a house in Astana today!

Do not put your dream off! We offer a free consultation, the development of a custom design and a detailed estimate.

With PROFI-DOM your dream of your own home will become a reality! Call us or leave a request for a call back. We will answer your questions and help you make the right choice. If you need to build a house, we will be glad to help!

Frequently asked questions
about building a house in Astana

How much does it cost to build a house in Astana?
The cost of building a house in Astana depends on a number of factors:

Area and number of floors. The larger the area and the more floors, the higher the cost.
Materials. Using expensive materials (brick, aerated concrete) increases the cost compared with cheaper solutions (frame houses).
Project complexity. Simple standard designs cost less than custom ones.
Is a permit required to build a house?
Yes, building a house requires a permit in accordance with the law. The procedure includes:

Obtaining the urban development plan for the land plot.
Developing a design that complies with codes and regulations.
Obtaining a building permit from the local government body.
Construction in line with the approved design.
Commissioning of the building once the work is completed.
Unauthorised construction without a permit is illegal and results in demolition of the structure.
How important is expertise when choosing a plot?
When choosing a plot, it is critically important to have expertise in the following areas:

Legal aspects (permitted use, encumbrances, clean legal title).
Technical characteristics (utilities, geology, transport accessibility).
Environment (ecology, noise, infrastructure).
How long does it take to build a house?
The duration of house construction depends on:

Type of house (frame, brick, etc.). Frame houses go up faster.
Area. The larger the area, the more time is required.
Project complexity. Simple projects are built faster.
Season. Construction may slow down in winter.
Availability of materials. Purchasing in advance speeds up the process.
Number and skill of workers. More experienced workers mean faster construction.

On average:

Frame house: shell 1-2 months, finished 3-4 months
SIP panel house: shell 1-2 months, finished 3-4 months
Brick house: shell 2 months, finished 5-6 months
Monolithic house: shell 2 months, finished 5-6 months

Time is also needed to develop and approve the design and to connect utilities - 14-45 days.
What materials do you build houses from?
The main materials we use:

Brick - strong, durable and heat-insulating.
Aerated concrete - light, strong and eco-friendly.
Foam block - a budget option with good insulation.
Monolith - strong, durable and energy-efficient.

The choice depends on the client's preferences and budget.
Can the construction time be shortened?
Yes, the timeframe can be shortened through careful planning, modern technologies and an optimised workflow. Quality and compliance with standards are not affected.
What is the ceiling height on the first and second floors?
The standard ceiling height on the first and second floors is 2,8-3,2 m.
What documents are needed to build a house?
Required set of documents:

Title documents for the land plot.
An architectural and planning assignment from the local authorities.
Design documentation.
Technical conditions for connection to utility networks.
A building permit from the local authorities.
Which foundation should you choose when building a house?
The choice of foundation depends on:

Soil type.
Weight and number of storeys of the house.
Presence of a basement.
Budget.

Common types:

Strip.
Slab.
Pier.
Pile.

Each type is best suited to particular conditions.
Phone:+7 (777) 327-97-34Our address:astana, Kabanbai Batyr St., 7/2Daily: 9:00–21:00 (by appointment)
WhatsApp