PROFI-DOM — construction company +7 (777) 327-97-34
ENRUKZ

Prefabricated sandwich panel buildings in Astana

and the region from 29 000 ₸*/m² in 1 month*Crew labour cost
calculate the construction cost

Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction

  • 200+ successfully completed projects in 25 years of work
  • Online broadcast of the construction progress 24/7*
  • Extended warranty from 5 years
  • 100% compliance with current
    standards: SNiP, SP, GOST

Prefabricated sandwich panel buildings in Astana

and the region

from 29 000 ₸*/m² in 1 month

*Crew labour cost

Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects in 25 years of work

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

Prefabricated sandwich panel buildings in Astana

and the region

from 29 000 ₸*/m² in 1 month

*Crew labour cost

Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects in 25 years of work

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

sandwich panel buildings we construct

COLD STORAGE WAREHOUSES
CAR SHOWROOMS
ADMINISTRATIVE BUILDINGS
OFFICES AND BUSINESS CENTRES
DORMITORIES
HOTELS AND INNS
SERVICE STATIONS, CAR REPAIR SHOPS, CAR WASHES
SHOPS
FRUIT STORAGE FACILITIES
vegetable storage facilities
GRANARIES
LIVESTOCK FARMING
POULTRY FACTORY
WORKSHOPS
HOUSES
RETAIL PREMISES
RESTAURANTS AND CAFES
SWIMMING POOL
SPORTS COMPLEX
AVIATION HANGAR
get a consultationWe will call you back within 3 minutes

sandwich panel buildings we construct

HANGARSFRUIT STORAGE FACILITIESvegetable storage facilitiesGRANARIESLIVESTOCK FARMINGPOULTRY FACTORYWAREHOUSEINDUSTRIAL BUILDINGSWORKSHOPSCOLD STORAGE WAREHOUSESSERVICE STATIONS, CAR REPAIR SHOPS, CAR WASHESSPORTS COMPLEXRESTAURANTS AND CAFESDORMITORIESSHOPSCAR SHOWROOMSADMINISTRATIVE BUILDINGSHOUSESHOTELS AND INNSOFFICES AND BUSINESS CENTRESSWIMMING POOLRETAIL PREMISESAVIATION HANGAR
get a consultation

We will call you back within 3 minutes

sandwich panel buildings we construct

HANGARSFRUIT STORAGE FACILITIESvegetable storage facilitiesGRANARIESLIVESTOCK FARMINGPOULTRY FACTORYWAREHOUSEHOTELS AND INNSOFFICES AND BUSINESS CENTRESINDUSTRIAL BUILDINGSWORKSHOPSCOLD STORAGE WAREHOUSESSERVICE STATIONS, CAR REPAIR SHOPS, CAR WASHESRETAIL PREMISESSPORTS COMPLEXAVIATION HANGARSHOPSCAR SHOWROOMSADMINISTRATIVE BUILDINGSSWIMMING POOLHOUSESRESTAURANTS AND CAFESDORMITORIES

We will call you back within 3 minutes

sandwich panel buildings are divided into 2 types:

WITH POLYSTYRENE CONCRETE INSULATION

WITH MINERAL WOOL INSULATION

sandwich panel buildings are divided into 2 types:

WITH POLYSTYRENE CONCRETE INSULATION

WITH MINERAL WOOL INSULATION

sandwich panel buildings are divided into 2 types:

WITH MINERAL WOOL INSULATION

WITH POLYSTYRENE CONCRETE INSULATION

Cost of building a sandwich panel building in Astana

The price is given for the work, including the cost of building materials

TERMCOST OF WORK WITHOUT MATERIALS PER M2COST OF WORK WITH MATERIALS PER M2
from 30 days29000 KZT/m270000 KZT/m2
LEAVE A REQUESTWe will call you back within 3 minutes

construction options

The price includes work and materials

Shell/pre-finish package

Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Preparing and installing the base for the load-bearing columns

Backfilling and levelling the floor with sand-gravel mix

Rough floor screed

Installation of load-bearing columns

Assembly of the building's steel frame with reinforcement and bracing

Installation of the metal roofing system

Installation of sandwich panels on the building and roof

Installation of the staircase frame (if two or more storeys)

from 90 000 KZT/m2

Finished package

All the work and materials from the shell package

Installation of 4--chamber windows

Installing the entrance door

Installation of interior partitions

Installing the substructure for drywall

Plasterboard installation

Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)

Installing plumbing (laying pipes, outlets for plumbing connections)

Installation of the heating system (installation of the heating system, either radiators or underfloor heating)

Wall painting

Pouring the finish screed to level the floor

Installation of stretch ceilings

Installation of finished floors (class 32 laminate or linoleum)

Installing sockets and switches

Installing interior doors

depending on the type of materials chosen for the finishing work

from 130 000 KZT/m2

construction options

The price includes work and materials

shell/pre-finish packagefinished package

The price includes work and materials

Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Preparing and installing the base for the load-bearing columns

Backfilling and levelling the floor with sand-gravel mix

Rough floor screed

Installation of load-bearing columns

Assembly of the building's steel frame with reinforcement and bracing

Installation of the metal roofing system

Installation of sandwich panels on the building and roof

Installation of the staircase frame (if two or more storeys)

from 90 000 KZT/m2

shell/pre-finish packagefinished package

The price includes work and materials

depending on the type of materials chosen for the finishing work

All the work and materials from the shell package

Installation of 4--chamber windows

Installing the entrance door

Installation of interior partitions

Installing the substructure for drywall

Plasterboard installation

Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)

Installing plumbing (laying pipes, outlets for plumbing connections)

Installation of the heating system (installation of the heating system, either radiators or underfloor heating)

Wall painting

Pouring the finish screed to level the floor

Installation of stretch ceilings

Installation of finished floors (class 32 laminate or linoleum)

Installing sockets and switches

⁠Installing interior doors

from 130 000 KZT/m2

construction options

The price includes work and materials

shell/pre-finish package

The price includes work and materials

Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Preparing and installing the base for the load-bearing columns

Backfilling and levelling the floor with sand-gravel mix

Rough floor screed

Installation of load-bearing columns

Assembly of the building's steel frame with reinforcement and bracing

Installation of the metal roofing system

Installation of sandwich panels on the building and roof

Installation of the staircase frame (if two or more storeys)

from 90 000 KZT/m2

shell/pre-finish package

depending on the type of materials chosen for the finishing work

The price includes work and materials

All the work and materials from the shell package

Installation of 4--chamber windows

Installing the entrance door

Installation of interior partitions

Installing the substructure for drywall

Plasterboard installation

Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)

Installing plumbing (laying pipes, outlets for plumbing connections)

Installation of the heating system (installation of the heating system, either radiators or underfloor heating)

Wall painting

Pouring the finish screed to level the floor

Installation of stretch ceilings

Installation of finished floors (class 32 laminate or linoleum)

Installing sockets and switches

⁠Installing interior doors

from 130 000 KZT/m2

Advantages of building a sandwich panel building

Cheaper by 30-40%

Unlike permanent construction facilities

10-point seismic resistance

Sandwich panel buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

Top quality class

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa

from -50°
C to +50°C

Maintaining the required temperature to within 0.5°C

No property tax

Saves up to 2,2% of the cadastral value annually

Resistance to natural disasters

They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

100%
thermal insulation

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards

Mobility

Relocating or expanding the building by 100% of its area takes only 2-3 weeks

Sound insulation
up to 45-50 dB

Comparable to the insulation of a brick wall 25 cm thick

LEAVE A REQUESTWe will call you back within 3 minutes

Advantages of building a sandwich panel building

Unlike permanent construction facilities

Cheaper by 30-40%

Sandwich panel buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa

Top quality class

Maintaining the required temperature to within 0.5°C

from -50°
C to +50°C

Saves up to 2,2% of the cadastral value annually

No property tax

They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards

100%
thermal insulation

Relocating or expanding the building by 100% of its area takes only 2-3 weeks

Mobility

Comparable to the insulation of a brick wall 25 cm thick

Sound insulation
up to 45-50 dB

We will call you back within 3 minutes

Advantages of building a sandwich panel building

Unlike permanent construction facilities

Cheaper by 30-40%

Sandwich panel buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa

Top quality class

Maintaining the required temperature to within 0.5°C

from -50°
C to +50°C

Saves up to 2,2% of the cadastral value annually

No property tax

They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards

100%
thermal insulation

Relocating or expanding the building by 100% of its area takes only 2-3 weeks

Mobility

Comparable to the insulation of a brick wall 25 cm thick

Sound insulation
up to 45-50 dB

We will call you back within 3 minutes

our company's services

  1. 01.

    Building construction

    We offer a full range of building construction services - from developing the design to handing over the finished property.

  2. 02.

    design →

    We develop custom building designs taking all your wishes into account.

  3. 03.

    obtaining permits

    We take on the entire process of obtaining the permits required to start construction.

  4. 04.

    Steel structures

    We manufacture and install steel structures of any complexity - garages, hangars and warehouses.

  5. 05.

    Interior finishing

    We carry out interior finishing - from rough work to final finishes.

  6. 06.

    Exterior finishing

    We finish the facades from the foundation to the roof.

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    5-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    A temporary fence is put up for tidy storage and strict control of building materials

  8. 08.
    Online monitoring of work progress

    You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

Answer 4 questions and get an estimate accurate to 95%

Find out the cost and timeframe of building your sandwich panel building in 1 minute

What type of building do you want to construct?

What area should the building be?

Do you already have a building design, or does a new one need to be developed?

Do you already have a plot for constructing the building?

One last step!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

catalogue of completed sandwich panel building projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Number of bedrooms
Project No. 220 Sports complexProject No. 220 Sports complex
Floors: 6
Building area: 3073 m²
230 475 000kzt
VIEW PROJECT
Project No. 1001 SchoolProject No. 1001 School
Floors: 3
Building area: 9507,4 m²
VIEW PROJECT
Project No. 1002 SchoolProject No. 1002 School
Floors: 4
Building area: 10102,52 m²
VIEW PROJECT
Project No. 221 CafeProject No. 221 Cafe
Floors: 1
Building area: 309 m²
23 175 000kzt
VIEW PROJECT

Develop a custom design for your sandwich panel building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34
Privacy Policy

Develop a custom design for your sandwich panel building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34
Privacy Policy

Develop a custom design for your sandwich panel building

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (777) 327-97-34

Customer reviews of prefabricated sandwich panel building construction in Astana

Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!

Stages of constructing a prefabricated sandwich panel building

Preparatory work

Carrying out engineering surveys

Building design

Manufacture of building components at the factory

Erecting the building

Commissioning

Stages of constructing a prefabricated sandwich panel building

Preparatory work

Carrying out engineering surveys

Building design

Manufacture of building components at the factory

Erecting the building

Commissioning

Stages of constructing a prefabricated sandwich panel building

Preparatory work

Carrying out engineering surveys

Building design

Manufacture of building components at the factory

Erecting the building

Commissioning

Sandwich panel buildings in Astana

Author: Danyar Satybaldin, civil engineer, head of the enclosing structures division

A key challenge for Astana businesses is creating warm, energy-efficient space in 2–3 months. The technology combines installation speed with high thermal insulation properties. This is a guide for owners and technical specialists — here you will find a detailed breakdown of the cost per m², installation timeframes and thermal engineering requirements in a sharply continental climate.

What a sandwich panel building is and how it works in Astana's climate

The structure is a steel frame clad with multi-layer panels. The outer layers are galvanised steel with a polymer coating, and the inner layer is insulation. Sealing the joints provides protection against wind and moisture. Modern sandwich panel buildings withstand temperature swings from –40 °C to +35 °C, typical of Astana.

The evolutionary path: construction of prefabricated sandwich panel buildings in Astana — from brick boxes to precise sandwich systems

Fifteen years ago, brick or reinforced concrete slabs were used for warehouses and workshops. Brick walls required a powerful foundation and lengthy heating in winter. Reinforced concrete structures had high thermal conductivity, leading to enormous heating costs. The main drawback was the inability to precisely control the quality of the joints and the heat loss.

As an alternative, we tried frame systems with hand-laid mineral wool insulation. But in Astana's winds the wool settled, forming thermal bridges, and the vapour barrier failed within 2–3 seasons. These solutions did not catch on for industrial facilities.

A modern prefabricated sandwich panel building elegantly solves these problems. Factory production guarantees a consistent insulation thickness across the whole area. Installation takes weeks instead of months, and a fixed estimate makes the budget predictable. The concealed fastening system eliminates point freezing.

Construction technologies: PIR vs mineral wool — which to choose for a project in Astana

The choice of insulation determines energy efficiency, fire safety and durability. The main trade-off of PIR is low vapour permeability, which requires forced ventilation. Mineral wool breathes but loses volume over time.

Parameter

PIR (polyisocyanurate)

Mineral wool

Thermal conductivity coefficient

0,022–0,025 W/m·K

0,035–0,042 W/m·K

Fire safety

G1 (low-combustibility)

NG (non-combustible)

Vapour permeability

0,05 mg/m·h·Pa

0,3–0,55 mg/m·h·Pa

Water absorption

1,0–1,5% in 24 hours

Up to 1,5% in 24 hours

Cost per m²

Higher by 15–25%

Lower

Little-known facts about sandwich panels in Astana:

  1. The longitudinal joints of the panels are sealed with a special tape that stays elastic at –30 °C — ordinary tape goes stiff within a month.
  2. Concealed fasteners create point thermal bridges — their effect is compensated for by increasing the insulation thickness by 10%.
  3. Logistics for panels longer than 12 metres requires special transport with spreader beams — this adds 5–7% to the delivery cost.

Cost of turnkey sandwich panel building construction

The price per m² is made up of the type of insulation, the panel thickness and the configuration. A fixed estimate can be drawn up after a heat loss calculation. Cutting corners on insulation thickness or sealant leads to higher heating costs.

Cost item

What it includes

Design and approvals

KM, KZh, thermal engineering calculation, fire codes

Foundation (lighter pile type)

Geology, piles, grillage, waterproofing

Steel frame (LSTK/LMK)

Columns, beams, ties, fire protection

Sandwich panels (100–150 mm)

Walls, roof, trim elements, fasteners

Gates, windows, doors

Sectional gates, dock shelters, vestibules

Engineering systems

Heating, ventilation, electrics, water supply

Installation and logistics

Crew, crane, sealants, technical supervision

Total per m² for the «warm envelope»

The building is ready for use

The other side of the low-price coin is unaccounted heat loss. Simplifying the roof-to-wall junctions creates thermal bridges. The warranty on such facilities usually does not exceed 2 years.

Expert advice from Danyar Satybaldin, civil engineer, head of the enclosing structures division: "Request fire-resistance testing of panel samples. An EI 15–30 certificate means the structure retains its integrity and thermal insulation during a fire. For category V1 warehouses this is a mandatory requirement — without it you cannot pass the fire inspection."

Stages of sandwich panel building construction: realistic timeframes for Astana's climate

Erecting prefabricated sandwich-system buildings takes 2–4 months for a 1200 m² building. The timeframe depends on three factors: foundation readiness, logistics and wind load. Winter installation extends the process by 15–20%.

Design (3–4 weeks). The engineer develops the structural scheme, calculates the wind and snow loads and selects the thickness of the cladding blocks. At this stage the junction details and fire breaks are worked out.
Fabrication of the elements (4–5 weeks). The factory cuts the profiles, fills them with insulation and presses the multi-layer panels. Quality control includes checking the geometry and the density of the filler.
Foundation (3–4 weeks). A pile-grillage foundation is suitable for sandwich systems. It is stable on Astana's frost-heaving soils and does not require curing time to gain strength.
Installation (4–6 weeks). The crew assembles the frame, installs the thermal blocks, seals the joints and fits the roof. Work is carried out at temperatures down to –15 °C using winter sealants.

Comparing technologies: sandwich panels vs traditional materials — which is more cost-effective for business

An analysis of the key parameters shows the advantages of sandwich systems for commercial facilities. By choosing brick for durability, you sacrifice commissioning speed and energy efficiency. It is therefore more rational to build a sandwich panel building to get fast installation, precise thermal engineering and a predictable budget.

Criterion

Sandwich panels (PIR 120 mm)

Brick masonry (640 mm)

Construction time (1000 m²)

2–3 months

8–12 months

Thermal conductivity coefficient

0,022–0,025 W/m·K

0,45–0,55 W/m·K

Load on the foundation

25–40 kg/m²

450–650 kg/m²

Repairability

Panel replacement in 2–3 hours

Masonry repair 5–10 days

Service life

30–40 years

80–100 years

Criterion

Sandwich panels (PIR 120 mm)

Brick masonry (640 mm)

Site requirements and the regulatory framework for construction in Astana

Before starting construction of a sandwich-system building, assess the site. It must have access roads for long-load vehicles, space for unloading the structural elements and the ability to connect to a temporary power supply.

Key requirements:
  • Geology:
Surveys are mandatory to determine the depth of frost penetration. Astana's loams freeze to a depth of 1,8–2,2 metres.

  • Utilities:
Availability of technical conditions for connection to the networks.

  • Permits:
Obtaining the urban development plan, the building permit and approval of the design by the fire service.

Fire safety is a critical parameter. Sandwich panel buildings are classified in structural fire hazard class K3. This requires:

  • Fire-retardant treatment of the steel frame (fire resistance rating R15).
  • Provision of fire breaks of 6 to 15 metres.
  • Installation of automatic fire alarm systems.

Expert advice from Danyar Satybaldin, civil engineer, head of the enclosing structures division: "Do not cut corners on the design of the junction details. The 50 000 KZT saved on detailing turns into 300 000 on redoing a leaking roof after the first rain. Our portfolio includes a case where an incorrect parapet-to-roof junction caused leaks around the entire perimeter of the building."

Operation and warranty for prefabricated sandwich panel buildings

The warranty on the panels is 5–10 years and on the installation 2–3 years. Operation requires an annual inspection of the joints, clearing snow off the roof and checking for tightness.
Energy efficiency is the main advantage with competent design. A building with enclosing structures 150 mm thick holds heat like a brick wall 1,5 metres thick. But thermal bridges arise where it meets the foundation — quality sealing eliminates this problem.
Technical supervision is a mandatory stage. The engineer monitors compliance with the design, the quality of element installation and the sealing of the joints. Cutting corners on technical supervision leads to skewed structures and failed joint seals.

How to choose a contractor for construction in Astana

Choosing the right contractor determines the success of the project. Turn to companies with experience working in Astana's climate, their own design office and a portfolio of completed projects. Check reviews and ask for an itemised estimate and a schedule. A reliable partner will be able to build a turnkey sandwich panel building on time, keep within budget and provide a warranty.

Frequently asked questions about sandwich panel building construction in Astana

How long does it take to build a sandwich panel building?
Construction timeframes are significantly shorter than traditional methods. For small facilities of up to 500 m², construction can take 2-3 weeks. Medium-sized buildings (500-1500 m²) are usually erected in 1-2 months. Large facilities of over 1500 m² may require 2-3 months. For example, a warehouse of 1000 m² can be built in 30-40 days, whereas a comparable brick building would require 4-6 months.
What materials are used as insulation in sandwich panels?
The most common insulation materials:

  1. Mineral wool: provides good thermal insulation (thermal conductivity coefficient 0,035-0,040 W/m·K) and fire safety. The density is usually 80-120 kg/m³.
  2. Polystyrene: a light material with low thermal conductivity (0,030-0,034 W/m·K). The density is about 15-25 kg/m³.
  3. Polyurethane foam: has the best thermal insulation properties (0,022-0,028 W/m·K). Density 30-60 kg/m³. The insulation thickness in the panels usually ranges from 50 to 200 mm depending on the climate and the building's purpose.
Are prefabricated sandwich panel buildings suitable for Astana's climate?
Yes, prefabricated sandwich panel buildings can be successfully adapted to Astana's climate, but they require serious attention to thermal insulation and tightness:

  • Enhanced thermal insulation: Astana requires significantly thicker sandwich panels. The recommended panel thickness for the walls is at least 150-200 mm, and for the roof at least 200-250 mm. Panels with a high thermal resistance coefficient must be chosen — at least 5.5-6.5 m²·°C/W. This is necessary to maintain a comfortable indoor temperature during extremely low winter temperatures (down to -40°C and below).
  • Insulation type: It is important to choose insulation with a low thermal conductivity coefficient and high frost resistance. It is recommended to use polyurethane foam (PUR) or polyisocyanurate (PIR) with a closed-cell structure, which have better thermal insulation characteristics and lower hygroscopicity than mineral wool. Mineral wool can be used, but only with mandatory high-quality vapour and waterproofing barriers.
  • Tightness: The tightness of the panel connections is extremely important. Special sealing materials must be used and all seams and joints carefully sealed. The presence of “thermal bridges” negates all insulation efforts.
  • Wind protection: The strong winds in Astana call for increased attention to wind protection. Special wind-protection membranes must be used and the panels carefully fastened to the frame.
  • Heat loss calculation: During design, the building's heat loss must be precisely calculated, taking Astana's climatic features into account.
  • Heating: An efficient and reliable heating system must be provided, capable of maintaining a comfortable temperature on the coldest days.
Are there height restrictions for sandwich panel buildings in Astana?
Height restrictions for sandwich panel buildings in Astana are also set by urban planning codes and regulations. However, wind loads and the soil characteristics must be taken into account:

  • Typical height: 1-3 storeys (up to 10-12 metres). This is the most economical and safest option.
  • Maximum height without special measures: 4 storeys (up to 15 metres), provided a reinforced steel frame and careful design are used.
  • Greater number of storeys: Possible, but requires complex design, a reinforced steel frame, additional wind-protection measures and mandatory approval from the local authorities. It must be borne in mind that as the height increases, the requirements for the structure's stability and wind resistance rise significantly.
  • Soil: As with modular buildings, taking the soil characteristics into account is extremely important. Geological surveys are required to determine the soil type and bearing capacity. The foundation type is chosen based on the survey results.
Phone:+7 (777) 327-97-34Our address:Astana, Kabanbay batyr, 7/2Daily: 9:00–21:00 (by appointment)