
Prefabricated sandwich panel buildings in Astana
and the region from 29 000 ₸*/m² in 1 month*Crew labour costDurable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of workOnline broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Prefabricated sandwich panel buildings in Astana
and the region
from 29 000 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Prefabricated sandwich panel buildings in Astana
and the region
from 29 000 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST
sandwich panel buildings we construct















sandwich panel buildings we construct
We will call you back within 3 minutes
sandwich panel buildings we construct
We will call you back within 3 minutes
sandwich panel buildings are divided into 2 types:

WITH POLYSTYRENE CONCRETE INSULATION

WITH MINERAL WOOL INSULATION
sandwich panel buildings are divided into 2 types:

WITH POLYSTYRENE CONCRETE INSULATION

WITH MINERAL WOOL INSULATION
sandwich panel buildings are divided into 2 types:


WITH MINERAL WOOL INSULATION
WITH POLYSTYRENE CONCRETE INSULATION
Cost of building a sandwich panel building in Astana
The price is given for the work, including the cost of building materials
| TERM | COST OF WORK WITHOUT MATERIALS PER M2 | COST OF WORK WITH MATERIALS PER M2 |
|---|---|---|
| from 30 days | 29000 KZT/m2 | 70000 KZT/m2 |
construction options
The price includes work and materials
Shell/pre-finish package
Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement
Pouring the foundation cushion or strip with vibration
Dismantling the formwork
Plumbing layout
Preparing and installing the base for the load-bearing columns
Backfilling and levelling the floor with sand-gravel mix
Rough floor screed
Installation of load-bearing columns
Assembly of the building's steel frame with reinforcement and bracing
Installation of the metal roofing system
Installation of sandwich panels on the building and roof
Installation of the staircase frame (if two or more storeys)
from 90 000 KZT/m2
Finished package
All the work and materials from the shell package
Installation of 4--chamber windows
Installing the entrance door
Installation of interior partitions
Installing the substructure for drywall
Plasterboard installation
Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)
Installing plumbing (laying pipes, outlets for plumbing connections)
Installation of the heating system (installation of the heating system, either radiators or underfloor heating)
Wall painting
Pouring the finish screed to level the floor
Installation of stretch ceilings
Installation of finished floors (class 32 laminate or linoleum)
Installing sockets and switches
Installing interior doors
depending on the type of materials chosen for the finishing work
from 130 000 KZT/m2
construction options
The price includes work and materials
The price includes work and materials
Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement
Pouring the foundation cushion or strip with vibration
Dismantling the formwork
Plumbing layout
Preparing and installing the base for the load-bearing columns
Backfilling and levelling the floor with sand-gravel mix
Rough floor screed
Installation of load-bearing columns
Assembly of the building's steel frame with reinforcement and bracing
Installation of the metal roofing system
Installation of sandwich panels on the building and roof
Installation of the staircase frame (if two or more storeys)
from 90 000 KZT/m2
The price includes work and materials
depending on the type of materials chosen for the finishing work
All the work and materials from the shell package
Installation of 4--chamber windows
Installing the entrance door
Installation of interior partitions
Installing the substructure for drywall
Plasterboard installation
Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)
Installing plumbing (laying pipes, outlets for plumbing connections)
Installation of the heating system (installation of the heating system, either radiators or underfloor heating)
Wall painting
Pouring the finish screed to level the floor
Installation of stretch ceilings
Installation of finished floors (class 32 laminate or linoleum)
Installing sockets and switches
Installing interior doors
from 130 000 KZT/m2
construction options
The price includes work and materials
The price includes work and materials
Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement
Pouring the foundation cushion or strip with vibration
Dismantling the formwork
Plumbing layout
Preparing and installing the base for the load-bearing columns
Backfilling and levelling the floor with sand-gravel mix
Rough floor screed
Installation of load-bearing columns
Assembly of the building's steel frame with reinforcement and bracing
Installation of the metal roofing system
Installation of sandwich panels on the building and roof
Installation of the staircase frame (if two or more storeys)
from 90 000 KZT/m2
depending on the type of materials chosen for the finishing work
The price includes work and materials
All the work and materials from the shell package
Installation of 4--chamber windows
Installing the entrance door
Installation of interior partitions
Installing the substructure for drywall
Plasterboard installation
Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)
Installing plumbing (laying pipes, outlets for plumbing connections)
Installation of the heating system (installation of the heating system, either radiators or underfloor heating)
Wall painting
Pouring the finish screed to level the floor
Installation of stretch ceilings
Installation of finished floors (class 32 laminate or linoleum)
Installing sockets and switches
Installing interior doors
from 130 000 KZT/m2
Advantages of building a sandwich panel building

Cheaper by 30-40%
Unlike permanent construction facilities

10-point seismic resistance
Sandwich panel buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

Top quality class
Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
from -50°
C to +50°C
Maintaining the required temperature to within 0.5°C
No property tax
Saves up to 2,2% of the cadastral value annually
Resistance to natural disasters
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

100%
thermal insulation
Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
Mobility
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Sound insulation
up to 45-50 dB
Comparable to the insulation of a brick wall 25 cm thick
Advantages of building a sandwich panel building

Unlike permanent construction facilities
Cheaper by 30-40%

Sandwich panel buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°
C to +50°C
Saves up to 2,2% of the cadastral value annually
No property tax
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100%
thermal insulation
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Mobility
Comparable to the insulation of a brick wall 25 cm thick
Sound insulation
up to 45-50 dB
We will call you back within 3 minutes
Advantages of building a sandwich panel building

Unlike permanent construction facilities
Cheaper by 30-40%

Sandwich panel buildings have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°
C to +50°C
Saves up to 2,2% of the cadastral value annually
No property tax
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100%
thermal insulation
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Mobility
Comparable to the insulation of a brick wall 25 cm thick
Sound insulation
up to 45-50 dB
We will call you back within 3 minutes
our company's services
- 01.
Building construction
We offer a full range of building construction services - from developing the design to handing over the finished property.
- 02.
We develop custom building designs taking all your wishes into account.
- 03.
obtaining permits
We take on the entire process of obtaining the permits required to start construction.
- 04.
Steel structures
We manufacture and install steel structures of any complexity - garages, hangars and warehouses.
- 05.
Interior finishing
We carry out interior finishing - from rough work to final finishes.
- 06.
Exterior finishing
We finish the facades from the foundation to the roof.
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe of building your sandwich panel building in 1 minute
catalogue of completed sandwich panel building projects
The price is given for shell construction, including the cost of building materials

Project No. 223 ShopBuilding area: 427 m²
Building footprint: 447,18 m²

Project No. 226 ShopBuilding area: 2077 m²
Building footprint: 2292 m²

Project No. 227 Swimming poolBuilding area: 2004 m²
Building footprint: 5654,4 m²

Project No. 229 TownhouseBuilding area: 117 m²
Building footprint: 480 m²

Project No. 230 TownhouseBuilding area: 228,61 m²
Building footprint: 1132,88 m²

Project No. 231 TownhouseBuilding area: 366,6 m²
Building footprint: 1000 m²

Project No. 632Total area: 13 824 m²
Building footprint: 13 824 m²
Customer reviews of prefabricated sandwich panel building construction in Astana
Your feedback matters a great deal to us






Stages of constructing a prefabricated sandwich panel building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Stages of constructing a prefabricated sandwich panel building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Stages of constructing a prefabricated sandwich panel building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Sandwich panel buildings in Astana
A key challenge for Astana businesses is creating warm, energy-efficient space in 2–3 months. The technology combines installation speed with high thermal insulation properties. This is a guide for owners and technical specialists — here you will find a detailed breakdown of the cost per m², installation timeframes and thermal engineering requirements in a sharply continental climate.
What a sandwich panel building is and how it works in Astana's climate
The evolutionary path: construction of prefabricated sandwich panel buildings in Astana — from brick boxes to precise sandwich systems
As an alternative, we tried frame systems with hand-laid mineral wool insulation. But in Astana's winds the wool settled, forming thermal bridges, and the vapour barrier failed within 2–3 seasons. These solutions did not catch on for industrial facilities.
A modern prefabricated sandwich panel building elegantly solves these problems. Factory production guarantees a consistent insulation thickness across the whole area. Installation takes weeks instead of months, and a fixed estimate makes the budget predictable. The concealed fastening system eliminates point freezing.
Construction technologies: PIR vs mineral wool — which to choose for a project in Astana
Parameter | PIR (polyisocyanurate) | Mineral wool |
Thermal conductivity coefficient | 0,022–0,025 W/m·K | 0,035–0,042 W/m·K |
Fire safety | G1 (low-combustibility) | NG (non-combustible) |
Vapour permeability | 0,05 mg/m·h·Pa | 0,3–0,55 mg/m·h·Pa |
Water absorption | 1,0–1,5% in 24 hours | Up to 1,5% in 24 hours |
Cost per m² | Higher by 15–25% | Lower |
- The longitudinal joints of the panels are sealed with a special tape that stays elastic at –30 °C — ordinary tape goes stiff within a month.
- Concealed fasteners create point thermal bridges — their effect is compensated for by increasing the insulation thickness by 10%.
- Logistics for panels longer than 12 metres requires special transport with spreader beams — this adds 5–7% to the delivery cost.
Cost of turnkey sandwich panel building construction
Cost item | What it includes |
Design and approvals | KM, KZh, thermal engineering calculation, fire codes |
Foundation (lighter pile type) | Geology, piles, grillage, waterproofing |
Steel frame (LSTK/LMK) | Columns, beams, ties, fire protection |
Sandwich panels (100–150 mm) | Walls, roof, trim elements, fasteners |
Gates, windows, doors | Sectional gates, dock shelters, vestibules |
Engineering systems | Heating, ventilation, electrics, water supply |
Installation and logistics | Crew, crane, sealants, technical supervision |
Total per m² for the «warm envelope» | The building is ready for use |
Expert advice from Danyar Satybaldin, civil engineer, head of the enclosing structures division: "Request fire-resistance testing of panel samples. An EI 15–30 certificate means the structure retains its integrity and thermal insulation during a fire. For category V1 warehouses this is a mandatory requirement — without it you cannot pass the fire inspection."
Stages of sandwich panel building construction: realistic timeframes for Astana's climate
Design (3–4 weeks). The engineer develops the structural scheme, calculates the wind and snow loads and selects the thickness of the cladding blocks. At this stage the junction details and fire breaks are worked out.
Fabrication of the elements (4–5 weeks). The factory cuts the profiles, fills them with insulation and presses the multi-layer panels. Quality control includes checking the geometry and the density of the filler.
Foundation (3–4 weeks). A pile-grillage foundation is suitable for sandwich systems. It is stable on Astana's frost-heaving soils and does not require curing time to gain strength.
Installation (4–6 weeks). The crew assembles the frame, installs the thermal blocks, seals the joints and fits the roof. Work is carried out at temperatures down to –15 °C using winter sealants.
Comparing technologies: sandwich panels vs traditional materials — which is more cost-effective for business
Criterion | Sandwich panels (PIR 120 mm) | Brick masonry (640 mm) |
Construction time (1000 m²) | 2–3 months | 8–12 months |
Thermal conductivity coefficient | 0,022–0,025 W/m·K | 0,45–0,55 W/m·K |
Load on the foundation | 25–40 kg/m² | 450–650 kg/m² |
Repairability | Panel replacement in 2–3 hours | Masonry repair 5–10 days |
Service life | 30–40 years | 80–100 years |
Criterion | Sandwich panels (PIR 120 mm) | Brick masonry (640 mm) |
Site requirements and the regulatory framework for construction in Astana
Key requirements:
- Geology:
- Utilities:
- Permits:
Fire safety is a critical parameter. Sandwich panel buildings are classified in structural fire hazard class K3. This requires:
- Fire-retardant treatment of the steel frame (fire resistance rating R15).
- Provision of fire breaks of 6 to 15 metres.
- Installation of automatic fire alarm systems.
Expert advice from Danyar Satybaldin, civil engineer, head of the enclosing structures division: "Do not cut corners on the design of the junction details. The 50 000 KZT saved on detailing turns into 300 000 on redoing a leaking roof after the first rain. Our portfolio includes a case where an incorrect parapet-to-roof junction caused leaks around the entire perimeter of the building."
Operation and warranty for prefabricated sandwich panel buildings
Energy efficiency is the main advantage with competent design. A building with enclosing structures 150 mm thick holds heat like a brick wall 1,5 metres thick. But thermal bridges arise where it meets the foundation — quality sealing eliminates this problem.
Technical supervision is a mandatory stage. The engineer monitors compliance with the design, the quality of element installation and the sealing of the joints. Cutting corners on technical supervision leads to skewed structures and failed joint seals.
How to choose a contractor for construction in Astana
Frequently asked questions about sandwich panel building construction in Astana
How long does it take to build a sandwich panel building?
What materials are used as insulation in sandwich panels?
- Mineral wool: provides good thermal insulation (thermal conductivity coefficient 0,035-0,040 W/m·K) and fire safety. The density is usually 80-120 kg/m³.
- Polystyrene: a light material with low thermal conductivity (0,030-0,034 W/m·K). The density is about 15-25 kg/m³.
- Polyurethane foam: has the best thermal insulation properties (0,022-0,028 W/m·K). Density 30-60 kg/m³. The insulation thickness in the panels usually ranges from 50 to 200 mm depending on the climate and the building's purpose.
Are prefabricated sandwich panel buildings suitable for Astana's climate?
- Enhanced thermal insulation: Astana requires significantly thicker sandwich panels. The recommended panel thickness for the walls is at least 150-200 mm, and for the roof at least 200-250 mm. Panels with a high thermal resistance coefficient must be chosen — at least 5.5-6.5 m²·°C/W. This is necessary to maintain a comfortable indoor temperature during extremely low winter temperatures (down to -40°C and below).
- Insulation type: It is important to choose insulation with a low thermal conductivity coefficient and high frost resistance. It is recommended to use polyurethane foam (PUR) or polyisocyanurate (PIR) with a closed-cell structure, which have better thermal insulation characteristics and lower hygroscopicity than mineral wool. Mineral wool can be used, but only with mandatory high-quality vapour and waterproofing barriers.
- Tightness: The tightness of the panel connections is extremely important. Special sealing materials must be used and all seams and joints carefully sealed. The presence of “thermal bridges” negates all insulation efforts.
- Wind protection: The strong winds in Astana call for increased attention to wind protection. Special wind-protection membranes must be used and the panels carefully fastened to the frame.
- Heat loss calculation: During design, the building's heat loss must be precisely calculated, taking Astana's climatic features into account.
- Heating: An efficient and reliable heating system must be provided, capable of maintaining a comfortable temperature on the coldest days.
Are there height restrictions for sandwich panel buildings in Astana?
- Typical height: 1-3 storeys (up to 10-12 metres). This is the most economical and safest option.
- Maximum height without special measures: 4 storeys (up to 15 metres), provided a reinforced steel frame and careful design are used.
- Greater number of storeys: Possible, but requires complex design, a reinforced steel frame, additional wind-protection measures and mandatory approval from the local authorities. It must be borne in mind that as the height increases, the requirements for the structure's stability and wind resistance rise significantly.
- Soil: As with modular buildings, taking the soil characteristics into account is extremely important. Geological surveys are required to determine the soil type and bearing capacity. The foundation type is chosen based on the survey results.










































































