PROFI-DOM — construction company +7 (708) 111-50-40
ENRUKZ

House construction in Almaty


and the region from 45 000 ₸*/m², 3 months*Crew labour cost
calculate the construction cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

  • 200+ successfully completed projects in 25 years of work
  • Online broadcast of the construction progress 24/7*
  • Extended warranty from 5 years
  • 100% compliance with current
    standards: SNiP, SP, GOST

House construction in Almaty

and the region

from 45 000 ₸*/m², 3 months

*Crew labour cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects in 25 years of work

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

House construction in Almaty

and the region

from 45 000 ₸*/m², 3 months

*Crew labour cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects in 25 years of work

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

Cost of building a house in Almaty

MATERIALTermSEISMIC RATINGSHELLPRE-FINISHFINISHED
SIP panel30 days9 pointsfrom 85 000 KZT-from 170 000 KZT
Frame2 - 3 months9 pointsfrom 85 000 KZT-from 170 000 KZT
Foam block2 - 3 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Gas block2 - 3 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Monolith3 - 4 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Heat block3 - 4 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Brick3 - 4 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Finblock3 - 4 months9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
Sandwich panels-9 pointsfrom 90 000 KZTfrom 90 000 KZTfrom 170 000 KZT
Polystyrene concrete-9 pointsfrom 125 000 KZTfrom 175 000 KZTfrom 225 000 KZT
MATERIALTermSEISMIC RATINGSHELLPRE-FINISHFINISHED
SIP panel30 days9 pointsfrom 25 000 KZT-from 75 000 KZT
Frame2 - 3 months9 pointsfrom 25 000 KZT-from 92 000 KZT
Foam block2 - 3 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Gas block2 - 3 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Monolith3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Heat block3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Brick3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Finblock3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Sandwich panels-9 pointsfrom 25 000 KZT-from 75 000 KZT
Polystyrene concrete-9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Cost of work with materials per 1 m²

MATERIAL

Term

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 85000 KZT

-

from 170000 KZT

Frame

2 - 3 months

9 points

from 85000 KZT

-

from 170000 KZT

Foam block

2 - 3 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Gas block

2 - 3 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Monolith

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Heat block

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Brick

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Finblock

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Sandwich panels

-

9 points

from 90000 KZT

from 90000 KZT

from 170000 KZT

Polystyrene
concrete

-

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Cost of work with materials per 1 m²

MATERIAL

Term

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 85000 KZT

-

from 170000 KZT

Frame

2 - 3 months

9 points

from 85000 KZT

-

from 170000 KZT

Foam block

2 - 3 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Gas block

2 - 3 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Monolith

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Heat block

3 - 4 months

9 points

from 125000 KZT

from 175000 KZT

from 225000 KZT

Sandwich panels

Brick

-

3 - 4 months

9 points

9 points

from 90000 KZT

from 125000 KZT

from 90000 KZT

from 175000 KZT

from 170000 KZT

from 225000 KZT

Polystyrene
concrete

Finblock

-

3 - 4 months

9 points

9 points

from 125000 KZT

from 125000 KZT

from 175000 KZT

from 175000 KZT

from 225000 KZT

from 225000 KZT

The cost of building modular houses can be found

at this link
LEAVE A REQUEST

We will call you back within 3 minutes

The cost of building modular houses can be found

at this link

We will call you back within 3 minutes

The cost of building modular houses can be found

at this link

We will call you back within 3 minutes

our company's services

01.

02.

03.

House construction

design →

obtaining permits

We offer a full range of private house construction services - from developing the design to handing over the finished property.

We develop custom designs for cottages, houses and garages, taking all your wishes into account.

We take on the entire process of obtaining the permits required to start construction.

04.

05.

06.

Steel structures

Interior finishing

Exterior finishing

We manufacture and install steel structures of any complexity - garages, hangars and warehouses.

We carry out interior finishing - from rough work to final finishes.

We finish the facades from the foundation to the roof.

our company's services

01.

02.

03.

04.

05.

06.

House construction

design →

obtaining permits

Steel structures

Interior finishing

Exterior finishing

We offer a full range of private house construction services - from developing the design to handing over the finished property.

We develop custom designs for cottages, houses and garages, taking all your wishes into account.

We take on the entire process of obtaining the permits required to start construction.

We manufacture and install steel structures of any complexity - garages, hangars and warehouses.

We carry out interior finishing - from rough work to final finishes.

We finish the facades from the foundation to the roof.

our company's services

01.

02.

03.

04.

05.

06.

House construction

design →

obtaining permits

Steel structures

Interior finishing

Exterior finishing

We offer a full range of private house construction services - from developing the design to handing over the finished property.

We develop custom designs for cottages, houses and garages, taking all your wishes into account.

We take on the entire process of obtaining the permits required to start construction.

We manufacture and install steel structures of any complexity - garages, hangars and warehouses.

We carry out interior finishing - from rough work to final finishes.

We finish the facades from the foundation to the roof.

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    5-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    A temporary fence is put up for tidy storage and strict control of building materials

  8. 08.
    Online monitoring of work progress

    You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

Answer 6 questions and get an estimate accurate to 95%

Find out the construction cost and timeframe in 1 minute

What type of house do you want to build?

What materials should the house be built from?

What should the area of the house be?

Do you already have a house design, or does a new one need to be developed?

Do you already have a plot for building a house?

What type of roofing would you like?

One last step!

You can view the results as soon as you enter and send your number!

+7

catalogue of completed projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Number of bedrooms
Garage
Project No. 1Project No. 1
Floors: 1
Living area: 67 m²
Building footprint: 75 m²
6 750 000kzt
VIEW PROJECT
Project No. 2Project No. 2
Floors: 1
House area: 107,5 m²
Building footprint: 191,8 m²
16 303 000kzt
VIEW PROJECT
Project No. 3Project No. 3
Floors: 1
House area: 92 m²
Building footprint: 92 m²
8 280 000kzt
VIEW PROJECT
Project No. 4Project No. 4
Floors: 1
House area: 84,2 m²
Building footprint: 100 m²
8 500 000kzt
VIEW PROJECT

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

Get a consultation

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

Get a consultation

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40

types of buildings we construct

Cottages

Industrial buildings

Private houses

Buildings

Residential complexes

Prefabricated buildings

Modular buildings

Hangars

Warehouses

Car washes

Hotels and inns

Offices and business centres

Service stations and car repair shops

Shops

Fruit and vegetable storage facilities

Buildings made of sandwich panels and steel structures

Workshops

Shopping centres

Restaurants and cafes

Cold storage warehouses

Dormitories

Administrative buildings

Pharmacies

Car showrooms

Industrial buildings

types of buildings we construct

Private
houses

Cottages

Buildings

Residential
complexes

Prefabricated buildings

Modular
buildings

Hangars

Warehouses

Car washes

Hotels
and inns

Offices and business centres

Service stations and car repair shops

Industrial buildings

Shops

Fruit and vegetable storage facilities

Buildings made of sandwich panels and steel structures

Workshops

Shopping centres

Restaurants
and cafes

Cold storage warehouses

Dormitories

Administrative buildings

Pharmacies

Car showrooms

types of buildings we construct

Private
houses

Cottages

Buildings

Residential
complexes

Prefabricated buildings

Modular
buildings

Hangars

Warehouses

Car washes

Hotels
and inns

Offices and business centres

Service stations and car repair shops

Industrial buildings

Shops

Fruit and vegetable storage facilities

Buildings made of sandwich panels and steel structures

Workshops

Shopping centres

Restaurants
and cafes

Cold storage warehouses

Dormitories

Administrative buildings

Pharmacies

Car showrooms

Customer reviews of house construction in Almaty

Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!

STAGES OF HOUSE CONSTRUCTION

Utilities beneath the foundation

Pouring the foundation with concrete

Laying a course of gas blocks on mortar

Reinforcement of the first course of masonry

Laying standard blocks on adhesive

Reinforcement of every fourth course of masonry

Installing formwork for the reinforced ring beam under the floors

Installing the wall plate

Installation of the rafter system (beams, posts, rafters, sill beam)

Laying the roof covering

Installing windows and doors

Foundation insulation

Electrical wiring

Water supply

Heating

Exterior finishing

Interior finishing

STAGES OF HOUSE CONSTRUCTION

Utilities beneath the foundation

Pouring the foundation with concrete

Laying a course of gas blocks on mortar

Reinforcement of the first course of masonry

Laying standard blocks on adhesive

Reinforcement of every fourth course of masonry

Installing formwork for the reinforced ring beam under the floors

Installing the wall plate

Installation of the rafter system (beams, posts, rafters, sill beam)

Laying the roof covering

Installing windows and doors

Foundation insulation

Electrical wiring

Water supply

Heating

Exterior finishing

Interior finishing

STAGES OF HOUSE CONSTRUCTION

Utilities beneath the foundation

Pouring the foundation with concrete

Laying a course of gas blocks on mortar

Reinforcement of the first course of masonry

Laying standard blocks on adhesive

Reinforcement of every fourth course of masonry

Installing formwork for the reinforced ring beam under the floors

Installing the wall plate

Installation of the rafter system (beams, posts, rafters, sill beam)

Laying the roof covering

Installing windows and doors

Foundation insulation

Electrical wiring

Water supply

Heating

Exterior finishing

Interior finishing

TURNKEY HOUSES IN ALMATY

Site preparation

Before work on the house begins, our company carries out a full set of engineering surveys: specialists study the soil composition and bearing capacity, the groundwater level and possible geological risks - landslides, flooding and seismic activity. This is necessary to produce the most accurate design for the foundation and utility networks.

Next, the site for building a house in Almaty is cleared of old structures, debris, shrubs and small trees. Large trees are cut down. Stumps are removed with special machinery.

Then a bulldozer strips the fertile topsoil for later land restoration. The site is graded and levelled with an excavator. If necessary, sand and crushed stone are brought in to fill pits, gullies and low spots. The soil is compacted with rollers.

Obtaining a permit for house construction in Almaty

Before construction work begins, a permit must be obtained from the local authorities.

To do this, you need to prepare a set of documents: title documents for the land plot, the urban development plan, design documentation, and the results of expert reviews and approvals.

After checking the documents, the authorities issue a permit to build a house in Almaty for a set period, stating the main parameters of the property.

Design

Developing the design documentation is a key stage on which the quality of the future house or cottage depends.

Architects design the overall look of the building, its layout and facades. Engineers calculate the structures of the foundation, walls, floors and roof, and select the best materials for building the house.

A design is produced for the utility systems: power supply, water supply, sewerage, heating, ventilation and low-voltage networks.

All documentation undergoes expert review and is approved by the supervisory authorities.

Foundation

As soon as the design for the house, cottage or townhouse is ready, we begin the foundation by excavating the pit or trenches to the design level. We set up the formwork and reinforce the cage with steel bars.

Then we pour the concrete and let it cure for a period of at least 3weeks to gain strength. We propose the type of foundation - strip, slab or pile - for your approval depending on the soil type and the loads on the house.

Frame and walls

  1. On the finished foundation we erect the load-bearing frame of the house from metal or timber.
  2. We install the columns, girders, braces and ties.
  3. Next, we build the exterior and interior walls from brick, aerated concrete blocks, panels or other materials.
  4. We reinforce the load-bearing walls with steel bars and pour concrete.

Floors and roof

Once the walls are laid, when you order the “house construction in Almaty” service the crew installs the floor structures between storeys from steel beams with decking or precast reinforced concrete slabs.

Waterproofing and a vapour barrier are laid on top, followed by installation of the rafter system. The roof is usually made of metal tiles, flexible shingles or corrugated sheeting.

Interior finishing with a 10% discount when you order the “turnkey house construction in Almaty” service

After the frame, walls and roof are in place, we carry out the interior finishing.

  1. In line with the design, we run the electrical wiring and install the distribution boards.
  2. We lay the water supply and sewerage pipes and install the plumbing fixtures.
  3. We install the heating and ventilation systems.
  4. We install the window and door units.
  5. We plaster the interior walls.
  6. We pour the floors.
  7. We carry out decorative finishing of the rooms.

Exterior finishing - we build houses using the highest-quality materials of your choice

Finishing work - cladding the facades with brick, stone, vinyl siding and other finishing materials.

  1. The builders insulate the plinth and facades.
  2. Downpipes are installed.
  3. A blind area is laid around the house.
  4. Landscaping work is carried out - paving paths, planting greenery and installing lighting.
Thus, building private houses in Almaty is a complex process made up of many stages, and carrying out each of them well is critical to obtaining a durable and comfortable building.

Frequently asked questions
about building a house in Almaty

How much does it cost to build a house in Almaty?
The cost of building a house in Almaty depends on a number of factors:

Area and number of floors. The larger the area and the more floors, the higher the cost.
Materials. Using expensive materials (brick, aerated concrete) increases the cost compared with cheaper solutions (frame houses).
Project complexity. Simple standard designs cost less than custom ones.
Is a permit required to build a house?
Yes, building a house requires a permit in accordance with the law. The procedure includes:

Obtaining the urban development plan for the land plot.
Developing a design that complies with codes and regulations.
Obtaining a building permit from the local government body.
Construction in line with the approved design.
Commissioning of the building once the work is completed.
Unauthorised construction without a permit is illegal and results in demolition of the structure.
How important is expertise when choosing a plot?
When choosing a plot, it is critically important to have expertise in the following areas:

Legal aspects (permitted use, encumbrances, clean legal title).
Technical characteristics (utilities, geology, transport accessibility).
Environment (ecology, noise, infrastructure).
How long does it take to build a house?
The duration of house construction depends on:

Type of house (frame, brick, etc.). Frame houses go up faster.
Area. The larger the area, the more time is required.
Project complexity. Simple projects are built faster.
Season. Construction may slow down in winter.
Availability of materials. Purchasing in advance speeds up the process.
Number and skill of workers. More experienced workers mean faster construction.

On average:

Frame house: shell 1-2 months, finished 3-4 months
SIP panel house: shell 1-2 months, finished 3-4 months
Brick house: shell 2 months, finished 5-6 months
Monolithic house: shell 2 months, finished 5-6 months

Time is also needed to develop and approve the design and to connect utilities - 14-45 days.
What materials do you build houses from?
The main materials we use:

Brick - strong, durable and heat-insulating.
Aerated concrete - light, strong and eco-friendly.
Foam block - a budget option with good insulation.
Monolith - strong, durable and energy-efficient.
The choice depends on the client's preferences and budget.
Can the construction time be shortened?
Yes, the timeframe can be shortened through careful planning, modern technologies and an optimised workflow. Quality and compliance with standards are not affected.
What is the ceiling height on the first and second floors?
The standard ceiling height on the first and second floors is 2,8-3,2 m.
What documents are needed to build a house?
Required set of documents:

Title documents for the land plot.
An architectural and planning assignment from the local authorities.
Design documentation.
Technical conditions for connection to utility networks.
A building permit from the local authorities.
Do you take Almaty's seismic activity into account during construction?
Yes, the region's 9-point seismicity is always taken into account during construction. The following measures are applied:

Choosing a suitable site.
Design that accounts for seismic loads.
Use of earthquake-resistant materials.
Compliance with construction codes and quality control.
Which foundation should you choose when building a house?
The choice of foundation depends on:

Soil type.
Weight and number of storeys of the house.
Presence of a basement.
Budget.

Common types:

Strip.
Slab.
Pier.
Pile.

Each type is best suited to particular conditions.
Phone:+7 (708) 111-50-40Our address:Almaty, Satpayev St., 133/5Daily: 9:00–21:00 (by appointment)
WhatsApp