
APARTMENT RENOVATION in ALMATY
from 15 000 tenge.* per m²
Cosmetic, major and turnkey renovation. We will come to measure for free and draw up an estimate with the price of each job.
Measurement and
estimate — freeStaged payments —
for accepted workWarranty on work in
the contractTurnkey bathroom:
works from 180 000 ₸

APARTMENT RENOVATION in ALMATY
from 15 000 tenge.* per m²
Cosmetic, major and turnkey renovation. We will come to measure for free and draw up an estimate with the price of each job.
Measurement and
estimate — free
Staged payments —
for accepted work
Warranty on work in
the contract
Turnkey bathroom:
works from 180 000 ₸

APARTMENT RENOVATION in ALMATY
from 15 000 tenge.* per m²
Cosmetic, major and turnkey renovation. We will come to measure for free and draw up an estimate with the price of each job.
Measurement and
estimate — free
Staged payments —
for accepted work
Warranty on work in
the contract
Turnkey bathroom:
works from 180 000 ₸
TYPES OF APARTMENT
RENOVATION we carry out

Cosmetic renovation

Major repairs

Turnkey renovation

Designer renovation

Renovation in a new build

Bathroom and WC renovation

Kitchen renovation

Electrical installation

Plumbing work

Wall and ceiling finishing
TYPES OF APARTMENT
RENOVATION we carry out










Cosmetic renovation
Major repairs
Turnkey renovation
Designer renovation
Wall and ceiling finishing
Electrical installation
Bathroom and WC renovation
Kitchen renovation
Plumbing work
Renovation in a new build
We will call you back within 3 minutes
TYPES OF APARTMENT
RENOVATION we carry out










Cosmetic renovation
Major repairs
Turnkey renovation
Plumbing work
Wall and ceiling finishing
Electrical installation
Renovation in a new build
Bathroom and WC renovation
Kitchen renovation
Designer renovation
We will call you back within 3 minutes
COST OF APARTMENT RENOVATION
in Almaty
| SERVICE | COST | TIME |
|---|---|---|
| Site visit for measurement and estimate (per project) | free of charge | from 1 day |
| Cosmetic renovation, labour (per m² of floor) | from 15 000 ₸ | from 2 weeks |
| Shell renovation in a new building, works (per m² of floor area) | from 20 000 ₸ | from 3 weeks |
| Major renovation, works (per m² of floor area) | from 35 000 ₸ | from 1,5 month |
| Designer renovation, works (per m² of floor) | from 55 000 ₸ | from 2 months |
| Turnkey renovation with materials (per m² of floor) | from 65 000 ₸ | from 2 months |
| Turnkey bathroom renovation, labour (per bathroom) | from 180 000 ₸ | from 7 days |
| Kitchen renovation, labour (per kitchen) | from 200 000 ₸ | from 7 days |
| Electrical wiring replacement (per linear metre) | from 1 500 ₸ | from 2 days |
| Water supply and sewerage pipework (per linear metre) | from 1 500 ₸ | from 2 days |
| Plastering walls on guide beads (per m²) | from 2 000 ₸ | from 2 days |
| Semi-dry floor screed (per m²) | from 2 500 ₸ | from 1 day |
| Tile laying (per m²) | from 4 000 ₸ | from 2 days |
| Laying laminate flooring (per m²) | from 1 200 ₸ | from 1 day |
| Painting walls and ceilings (per m²) | from 1 300 ₸ | from 1 day |
| Stretch ceiling (per m²) | from 2 800 ₸ | 1 day |
| Demolition and removal of debris | as per the estimate | from 1 day |
* Prices are a guide for works without materials, except for the “turnkey” line. We calculate the exact cost from an estimate after a free site measurement and fix it in the contract.
Advantages of APARTMENT RENOVATION BY Profi-Dom
Estimate before work begins
We come to measure free of charge and draw up an estimate room by room: which works, the scope, the price and the timeframe for each.
One contractor
Demolition, electricals, plumbing, shell and final finishing — one team and one point of responsibility.

Price in the contract
We fix the cost and timeframe in the contract and add new work only after written approval.
Staged payments
You pay for each stage after acceptance: demolition and shell work, utility networks, final finishing.
Warranty under the contract
We set out the warranty obligations for the completed works in the contract together with the estimate and the timeframe.
Photos of hidden works
We photograph the wiring, pipes and waterproofing before they are covered with plaster and tiles.
Advantages of APARTMENT RENOVATION BY Profi-Dom
We come to measure free of charge and draw up an estimate room by room: which works, the scope, the price and the timeframe for each.
Estimate before work begins
Demolition, electricals, plumbing, shell and final finishing — one team and one point of responsibility.
One contractor

We fix the cost and timeframe in the contract and add new work only after written approval.
Price in the contract
You pay for each stage after acceptance: demolition and shell work, utility networks, final finishing.
Staged payments
We set out the warranty obligations for the completed works in the contract together with the estimate and the timeframe.
Warranty under the contract
We photograph the wiring, pipes and waterproofing before they are covered with plaster and tiles.
Photos of hidden works
We will call you back within 3 minutes
Advantages of APARTMENT RENOVATION BY Profi-Dom
We come to measure free of charge and draw up an estimate room by room: which works, the scope, the price and the timeframe for each.
Estimate before work begins
Demolition, electricals, plumbing, shell and final finishing — one team and one point of responsibility.
One contractor

We fix the cost and timeframe in the contract and add new work only after written approval.
Price in the contract
You pay for each stage after acceptance: demolition and shell work, utility networks, final finishing.
Staged payments
We set out the warranty obligations for the completed works in the contract together with the estimate and the timeframe.
Warranty under the contract
We photograph the wiring, pipes and waterproofing before they are covered with plaster and tiles.
Photos of hidden works
We will call you back within 3 minutes
HOW WE WORK
- 01.
Consultation
We confirm which flat you have and what renovation is needed, and call you back within 3 minutes to arrange a site measurement.
- 02.
Apartment measurement
We measure the rooms and check the walls, floors and ceilings, as well as the condition of the wiring and pipes.
- 03.
Estimate
We prepare an estimate by room and type of work and help you calculate the shell and finishing materials.
- 04.
Contract
We set out in the contract the price of the work, the timelines, the payment stages and the warranty.
- 05.
Demolition and rough work
We strip the old finishes, erect partitions, screed the floor and plaster the walls using guide beads.
- 06.
Utility networks
We replace the electrical wiring and pipes, waterproof the bathroom and photograph the concealed works.
- 07.
Final finishing
We lay tiles and floor coverings, paint walls or hang wallpaper, install ceilings, doors and plumbing fixtures.
- 08.
Handover of the work
We walk through the apartment with you against the estimate, remove the debris and sign the completion certificate.
Answer 5 questions and get an estimate accurate to 95%
Find out the cost and timeframe for apartment renovation in 1 minute
More about apartment renovation in Almaty
Apartment renovation in Almaty is carried out by PROFI-DOM: cosmetic, major and designer renovation and turnkey renovation in new builds and on the secondary market. We come to take measurements free of charge, draw up an estimate by room and type of work, fix the price and timeframe in the contract and hand over the apartment against a signed acceptance certificate.
Below is a detailed breakdown: which type of renovation suits your apartment, how renovation differs in a new build and in resale housing, in what order the work proceeds and how long it takes, what the estimate is made up of, how to do the bathroom and kitchen, and how to accept the renovation against a handover certificate.
Published: 26 · Updated:
What kind of renovation does the apartment need: cosmetic, major or turnkey
The type of renovation is determined not by the budget but by the condition of the apartment: what can be kept and what will have to be replaced. We explain how the types of renovation differ and how to understand which one you need.
Cosmetic renovation: refresh the finishes
Cosmetic renovation is suitable if the walls and floors are level, the wiring and pipes are in order, and only the finishes are outdated. It includes filling and painting the walls or hanging wallpaper, replacing the floor covering, skirting boards, sockets and switches, and sometimes a stretch ceiling. We do not touch the utility networks and do not move partitions. This is the fastest type of renovation: a one-room apartment is usually refreshed in 2–4 weeks.
Major renovation: replacing everything hidden in the walls
Major renovation is needed when the apartment is more than 20–25 years old, the wiring is aluminium, the pipes are steel and the walls and floors are uneven. The finishes are stripped back to the concrete, the electrical wiring and water supply are replaced, a new screed and plaster using guide beads are applied, the bathroom is waterproofed, and then all the finishing is done. This is where the hidden work matters: once the plaster and tiles are in place, it can only be redone by opening them up.
Turnkey renovation and designer renovation
Turnkey renovation is a major or cosmetic renovation in which the contractor is responsible for everything: the estimate, purchasing materials, the work and cleaning. You get an apartment ready to move into. Designer renovation is carried out according to a design project: complex ceilings, hidden lighting, wall panels, non-standard tile layouts. It costs more due to the precision of the work and more expensive materials.
Comparison of renovation types
| Type of renovation | What is included | Works, from ₸ per m² of floor | Timeframe for a 1--room flat |
|---|---|---|---|
| Cosmetic | Finishing of walls, floors and ceilings without replacing utilities | 15 000 | 2–4 weeks |
| Major | Demolition down to bare concrete, new utilities, levelling, final finishing | 35 000 | 1,5–3 months |
| Designer | Major renovation to a design project | 55 000 | from 2 months |
| Turnkey with materials | Work and all materials according to the estimate | 65 000 | from 2 months |
Renovation in new builds and resale housing
A new apartment and an apartment with a history require different approaches: in a new build, work begins with checking what the developer has done; in a resale property, it begins with demolition.
New builds: unfinished and pre-finish
A shell-and-core flat has concrete walls and sometimes a screed and wiring up to the distribution board. Before renovating, it is worth checking the geometry of the walls and floor, the quality of the screed, the windows and the risers: it is easier to raise the developer's defects before work begins. In a flat with pre-finish, the walls are already levelled and there is a screed and wiring — only the final finishes remain, but the quality of the preparation is also checked: if the plaster is peeling, tiles cannot be laid on it.
New buildings settle, so hairline cracks may appear on the walls in the first year. To reduce them, reinforcing mesh or glass fleece is applied to the walls before painting.
Resale housing: demolition, old wiring and pipes
In resale housing the estimate starts with demolition: old tiles, plaster, floors and sometimes partitions. After demolition, the condition of the walls and floors becomes visible. During a major renovation, aluminium wiring is replaced entirely: modern loads — an oven, a hob, an air conditioner and a boiler — are not designed for it. Steel pipes are replaced with polypropylene or metal-plastic ones, together with the valve on the branch from the riser.
Redevelopment: what to discuss before starting
Moving and demolishing walls, relocating the bathroom or kitchen, and combining the balcony with a room are redevelopment, which must be formalised before work begins. Load-bearing walls must not be touched, and wet zones must not be located above the living rooms of the neighbours below. If you plan to change the layout, discuss it at the site measurement: the estimate and the order of work depend on it.
Stages and timelines of apartment renovation
The order of work in a renovation is almost always the same: first the “dirty” and hidden work, then the finishing. Breaking this order is the main cause of rework.
Work sequence: from demolition to final finishing
- Demolition and rubbish removal: we strip the old finishes, floors, plumbing and doors.
- Partitions: we build new walls from gas block or plasterboard according to the plan.
- Electrical and plumbing: we chase the walls, run cables and pipes, and install the distribution board.
- Plaster and screed: we level the walls using guide beads and pour the floor screed.
- Waterproofing and tiles: in the bathroom and kitchen.
- Filling, ceilings, painting or wallpaper.
- Floor coverings, doors, sockets, plumbing and cleaning.
How long the renovation takes
Cosmetic renovation of a one-room apartment usually takes 2–4 weeks, while a major renovation takes from 1,5 to 3 months. The timeframe grows with the area and complexity of the finishing, but part of the time is spent not on work but on drying: a cement screed about 5 cm thick needs roughly a month before laminate or parquet can be laid on it. Semi-dry screed and gypsum plaster dry faster, so the choice of technology also affects the timeline.
Hidden works: what to photograph before they are covered
Before the walls are covered with plaster and tiles, photograph each wall with a tape measure in the frame: where the cables and pipes run, where the junction boxes are. These photos will come in handy when you need to hang a shelf or a kitchen cabinet without hitting a wire. We take such photos at every site and hand them over to the client.
What makes up the cost of renovation
The “from … ₸ per m²” price is a reference point for comparing contractors. The final amount is made up of the scope of specific work, and that depends on the flat.
Price per m²: what it depends on
- Condition of the apartment: uneven walls require a thick layer of plaster, and an old floor requires demolition and a new screed.
- Number of wet zones: the bathroom and the kitchen are the most expensive rooms in terms of work per m².
- Finishing complexity: multi-level ceilings, large-format tiles, hidden doors and lighting.
- Electrical scope: the number of sockets and circuits, underfloor heating, air conditioners.
Materials: shell and finishing
Rough materials — plaster, putty, screed mixes, primer, cable, pipes, waterproofing — are calculated from the estimate, and it is more convenient for the contractor to purchase them themselves: they know the consumption and compatibility. Finishing materials — tiles, laminate, wallpaper, paint, plumbing fixtures and doors — are often chosen by the clients themselves. It is important to agree on this at the start: the deadlines and responsibility for quality depend on who purchases the materials.
Why the estimate may change
In resale housing, some defects only become visible after demolition: voids under the plaster, rotten embedded pipes, wiring without protective earthing. We show such places in photos, price the additional work as a separate line and start it only after the client's written consent. That is why, before signing the contract, it is worth checking that this procedure is set out in it.
Bathroom and kitchen renovation
The bathroom and kitchen are rooms with water, electricity and appliances, where mistakes cost the most: from flooding the neighbours to replacing all the tiles.
Bathroom: waterproofing, pipework, tiles
Waterproofing is applied across the entire floor and up the walls, and in the shower area to the full height reached by water. Corners and junctions are sealed with waterproofing tape. Pipe routing is planned around the selected fixtures: a wall-hung toilet, a shower drain and a concealed mixer each have their own heights and outlet positions. Tiles are laid after the pipework has been checked by pressure testing, and inspection hatches to the meters and valves are left under the bath and by the installation frame.
Kitchen: electrics for appliances and the backsplash
The electrical layout in the kitchen is drawn up after the kitchen furniture has been chosen: sockets are placed above the worktop, and separate lines with circuit breakers of the required rating are run for the oven, hob, dishwasher and washing machine. Outlets for the extractor hood and under-cabinet lighting are also planned in advance. The backsplash is laid after the lower cabinets are installed or using precise marking of their height.
Contract, acceptance and warranty
A good renovation is put in writing: in the contract, the estimate and the acceptance report. We explain what to check in each.
What the contract must include
- Estimate: a list of works with quantities and unit prices, not a single lump sum.
- Timeframe: start date, stages and completion date.
- Payment procedure: a deposit and payment by stages after acceptance.
- Materials: who purchases them and who is responsible for delivery and carrying them up.
- Additional work: only by written agreement.
- Warranty: term and procedure for remedying defects.
How to accept the renovation
Inspect the work in good lighting. Check the walls with a two-metre straightedge and the side light of a torch — this reveals waves and bumps. Tap the tiles: a dull sound means a void beneath the tile. The joints must be even and of uniform width. Test the sockets with a tester, and the breakers in the distribution board must be labelled. Open all the taps and check the connections under the sinks and the bathtub. Record any remarks in the handover certificate — the contractor rectifies them before signing.
Renovation warranty
The warranty period for the work is stated in the contract, and the manufacturer's warranty applies to materials. Keep the contract, estimate, acceptance certificate and photos of hidden works: in a warranty case they make it easier to determine the cause of the defect.
Conclusion
Apartment renovation comes down to a few decisions: the type of renovation, the order of work, the materials and the contractor. A short summary of each point:
Key takeaways
- Type of renovation — based on the condition of the apartment: if the wiring and pipes are old, cosmetics will not help — a major renovation is needed.
- Hidden work comes first: electricals, plumbing and waterproofing are done before finishing, and are photographed.
- The price per m² is a guide: the final amount is shown by the room-by-room estimate after measurement.
- Everything in the contract: the estimate, deadlines, payment stages, warranty and the procedure for additional work.
- Acceptance by handover report: defects are recorded and rectified before signing.

