Screw piles Almaty
service life of up to 50 years, GOST quality
Base without distortions, load up to 5 t/pile, dispatch within 24 hours.
Savings of up to 15% thanks to direct supplies from Kazakhstan and Russia
Warehouse: 3 000 tonnes, 95% items in stock
18 vehicles in our own fleet
Every batch comes with GOST and EN certificates

Screw piles Almaty
service life of up to 50 years, GOST quality
Base without distortions, load up to 5 t/pile, dispatch within 24 hours.

Savings of up to 15% thanks to direct supplies from Kazakhstan and Russia

Warehouse: 3 000 tonnes, 95% items in stock

18 vehicles in our own fleet

Every batch comes with GOST and EN certificates

Screw piles Almaty
service life of up to 50 years, GOST quality
Base without distortions, load up to 5 t/pile, dispatch within 24 hours.

Savings of up to 15% thanks to direct supplies from Kazakhstan and Russia

Warehouse: 3 000 tonnes, 95% items in stock

18 vehicles in our own fleet

Every batch comes with GOST and EN certificates
screw pile catalogue
The price is given per piece, including production and delivery
SVS screw pile 57×1000 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 57×1500 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 57×2000 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 76×1500 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 76×2000 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 76×2500 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 89×1800 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 89×2000 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 89×2500 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 102×2000 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 108×1800 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 108×2000 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 108×2500 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 114×2500 mm (St3ps/sp) GOST 32047 in Almaty
SVS screw pile 133×2500 mm (St3ps/sp) GOST 32047 in Almaty
Multi-turn pile 57×1000 mm (St3) GOST 32047 in Almaty
Multi-turn pile 76×1200 mm (St3) GOST 32047 in Almaty
Multi-turn pile 76×1600 mm (St3) GOST 32047 in Almaty
Multi-turn pile 89×2000 mm (St3) GOST 32047 in AlmatyOUR COMPANY'S SERVICES

Preparatory operations
Cutting (gas, plasma, laser, waterjet), bending, straightening, making forgings, metal casting, rolling, perforation, blanking and stamping.

Machining
Turning and milling (including CNC), drilling, boring, thread cutting, grinding, polishing, deburring and machining.


Heat and chemical treatment
Heat treatment (hardening, tempering, normalising), carburising, nitriding, boriding, carbonitriding, chemical oxidation (blackening).

Surface coatings and finishing
Electroplated coatings (galvanising, chrome plating, nickel plating, anodising), painting (powder, liquid, anti-corrosion), paint-and-varnish coatings, sandblasting.

Quality control
Ultrasonic testing, magnetic particle testing, radiographic testing, penetrant testing.

Welding and assembly
Welding work (arc, semi-automatic, argon-arc), assembly of steel structures.

Special technologies
Calibration (round, square, hexagon), hydroforming, laser marking.

Logistics and order assembly
Packaging of products, order assembly, warehousing services, delivery of rolled metal and finished products.

Engineering and design
Development of technical documentation, design of steel structures, material selection, and bespoke design and engineering solutions for the client.
OUR COMPANY'S SERVICES

Cutting (gas, plasma, laser, waterjet), bending, straightening, making forgings, metal casting, rolling, perforation, blanking and stamping.
Preparatory operations

Turning and milling (including CNC), drilling, boring, thread cutting, grinding, polishing, deburring and machining.
Machining


Heat treatment (hardening, tempering, normalising), carburising, nitriding, boriding, carbonitriding, chemical oxidation (blackening).
Heat and chemical treatment

Electroplated coatings (galvanising, chrome plating, nickel plating, anodising), painting (powder, liquid, anti-corrosion), paint-and-varnish coatings, sandblasting.
Surface coatings and finishing

Ultrasonic testing, magnetic particle testing, radiographic testing, penetrant testing.
Quality control

Welding work (arc, semi-automatic, argon-arc), assembly of steel structures.
Welding and assembly

Calibration (round, square, hexagon), hydroforming, laser marking.
Special technologies

Packaging of products, order assembly, warehousing services, delivery of rolled metal and finished products.
Logistics and order assembly

Development of technical documentation, design of steel structures, material selection, and bespoke design and engineering solutions for the client.
Engineering and design
We will call you back within 3 minutes
OUR COMPANY'S SERVICES

Cutting (gas, plasma, laser, waterjet), bending, straightening, making forgings, metal casting, rolling, perforation, blanking and stamping.
Preparatory operations

Turning and milling (including CNC), drilling, boring, thread cutting, grinding, polishing, deburring and machining.
Machining


Heat treatment (hardening, tempering, normalising), carburising, nitriding, boriding, carbonitriding, chemical oxidation (blackening).
Heat and chemical treatment

Electroplated coatings (galvanising, chrome plating, nickel plating, anodising), painting (powder, liquid, anti-corrosion), paint-and-varnish coatings, sandblasting.
Surface coatings and finishing

Ultrasonic testing, magnetic particle testing, radiographic testing, penetrant testing.
Quality control

Welding work (arc, semi-automatic, argon-arc), assembly of steel structures.
Welding and assembly

Calibration (round, square, hexagon), hydroforming, laser marking.
Special technologies

Packaging of products, order assembly, warehousing services, delivery of rolled metal and finished products.
Logistics and order assembly

Development of technical documentation, design of steel structures, material selection, and bespoke design and engineering solutions for the client.
Engineering and design
We will call you back within 3 minutes
Prices for Screw piles
| CATEGORY | THICKNESS | STEEL GRADE | SIZE | UNIT OF MEASURE | AVERAGE PRICE |
|---|---|---|---|---|---|
| SVS (blade) screw piles | |||||
| SVS screw pile 57 | 3,0-3,5 | Ст3пс/сп | 57x1000 | pcs | 11200 |
| SVS screw pile 57 | 3,0-3,5 | Ст3пс/сп | 57x1500 | pcs | 13620 |
| SVS screw pile 57 | 3,0-3,5 | Ст3пс/сп | 57x2000 | pcs | 17490 |
| SVS screw pile 76 | 3,5 | Ст3пс/сп | 76x1500 | pcs | 16230 |
| SVS screw pile 76 | 3,5 | Ст3пс/сп | 76x2000 | pcs | 20430 |
| SVS screw pile 76 | 3,5 | Ст3пс/сп | 76x2500 | pcs | 24100 |
| SVS screw pile 89 | 3,5-4,0 | Ст3пс/сп | 89x1800 | pcs | 19000 |
| SVS screw pile 89 | 3,5-4,0 | Ст3пс/сп | 89x2000 | pcs | 21500 |
| SVS screw pile 89 | 3,5-4,0 | Ст3пс/сп | 89x2500 | pcs | 26800 |
| SVS screw pile 102 | 4,0 | Ст3пс/сп | 102x2000 | pcs | 24500 |
| SVS screw pile 108 | 4,0 | Ст3пс/сп | 108x1800 | pcs | 22000 |
| SVS screw pile 108 | 4,0 | Ст3пс/сп | 108x2000 | pcs | 28600 |
| SVS screw pile 108 | 4,0 | Ст3пс/сп | 108x2500 | pcs | 36340 |
| SVS screw pile 114 | 4,0 | Ст3пс/сп | 114x2500 | pcs | 39200 |
| SVS screw pile 133 | 4,5-5,0 | Ст3пс/сп | 133x2500 | pcs | 48500 |
| Multi-turn (self-drilling) screw piles | |||||
| Multi-turn pile | 3,0 | St3 | 57x1000 | pcs | 10500 |
| Multi-turn pile | 3,5 | St3 | 76x1200 | pcs | 15800 |
| Multi-turn pile | 3,5 | St3 | 76x1600 | pcs | 19200 |
| Multi-turn pile | 4,0 | St3 | 89x2000 | pcs | 25400 |
| Components and Additional Services | |||||
| Foundation head | 4,0 | St3 | 150x150 | pcs | 4820 |
| Foundation head | 4,0 | St3 | 200x200 | pcs | 7010 |
| Installation of a screw pile (labour) | - | - | up to 2.5m | pcs | 8500 |
- 01.OUR OWN WAREHOUSE OF 3 000 TONNES
Pipes, beams, sheets and rebar to GOST are in stock. More than 2 500 items available. We guarantee a selection for any project.
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best metal suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.cutting accuracy to ±1 mm
On Hypertherm CNC machines. We eliminate defects and metal waste. We save clients up to 15% of the budget on every project.
- 04.Delivery strictly on time
We deliver 98,5% of orders exactly on time thanks to our own fleet of 18 vehicles. You will avoid production downtime and penalties from clients.
- 05.A WIDE CHOICE OF METAL
We have 100+ items in stock: steel, aluminium and stainless steel from MMK, RUSAL and Severstal. Get the metal you need turnkey.
- 06.Direct supplies from 7 mills
We work directly, without intermediaries, with the MMK, NLMK and ChTPZ mills. Prices are 10-15% below market and every product comes with a quality certificate.
- 07.Dispatch from the warehouse in 3 hours
We will dispatch 95% items from our warehouse within 3 hours of your request. You will cut waiting time and speed up the start of the project.
- 08.Deferred payment of up to 30 days
We provide official deferred payment of up to 10 000 000 KZT for regular clients. Keep your working capital.
- 09.We will calculate the cost in 15 min
Send us a drawing or specification. Our engineer will prepare a quote with the exact cost in 15 minutes and send it to your email.
- 10.Packaging protects against corrosion
An anti-corrosion film and wooden spacers for sheet metal. Rebar in bundles of 2 tonnes. Storage life of up to 12 months.
Find out the cost of screw piles in 1 minute
CUSTOMER REVIEWS on screw piles in Almaty
Your feedback matters a great deal to us
Screw piles
SCREW PILES IN ALMATY: CALCULATION, INSTALLATION, SERVICE LIFE
In regions with difficult soils, a high groundwater level and seismic activity, a traditional concrete foundation often proves ineffective and economically unviable. A modern solution that allows stable structures to be erected on slopes, in swampy areas and in dense urban development is screw piles. These are steel pipes with blades that are screwed into the ground down to dense layers, creating a stable support. The technology solves the key problems of Almaty construction: heaving soils, slopes, high groundwater and tight deadlines.
Specification of piles for standard projects
Purpose | Shaft diameter, mm | Wall thickness, mm | Blade diameter, mm | Load, t |
Fence, SVR | 57 - 76 | 3.0 | 200 - 250 | 1 - 2 |
Bathhouse, gazebo | 89 | 3.5 | 250 - 300 | 3 - 4 |
Timber house | 108 | 4.0 | 300 | 5 - 7 |
Brick cottage | 133 - 159 | 4.5 - 6.0 | 350 - 600 | 8 - 12+ |
Expert advice from Arman Kusainov: The service life of a correctly installed pile in Almaty is 80-100 years. The conditions: steel at least 4 mm thick, full anti-corrosion coating, and concreting of the shaft after installation.
Comparison with a concrete foundation
Parameter | Screw piles | Strip foundation |
Assembly time | 1-3 days | 14-30 days + 28 days for the concrete to gain strength |
Seasonality of the work | All year round, including winter | Only at above-zero temperatures |
Work on a slope | No restrictions, no site levelling | Levelling or complex formwork is required |
Average cost in Almaty | From 18 000 KZT per screw shaft with installation | From 35 000 KZT per linear metre |
Start of shell construction | The day after installation | 28 days after pouring |
What determines the price of screw piles and the cost of installation in Almaty
The cost of a building's foundation often becomes the deciding factor when choosing a construction technology. Unlike capital concrete works, which require significant material costs and lengthy preparatory stages, the final price for screw piles is formed transparently and, as a rule, turns out to be 30-50% lower, which makes this method of foundation construction a cost-effective solution.
Expert advice from Arman Kusainov: Check the torque while screwing in. For a shaft 108 mm in diameter, the minimum figure is 2500 Nm. This guarantees that the pile has reached dense soil.
- Rocky soils. They require preliminary leader drilling. Because of this, the cost of installing screw piles increases by 25%.
- Stray currents. Near power lines or rails, cathodic protection is required.
- Horizontal loads. Without a rigid grillage they are not suitable for tall structures.
- No basement. The space under the house remains open.
Criteria for choosing a contractor
- In-house production. Inspect the workshop and metal certificates.
- Design department. An engineer must calculate the load rather than offer a standard solution.
- Warranty. Look for a contract with a guarantee of 3 years for the entire structure, not just the material.
- Equipment. Hydraulic rigs give a more accurate result than manual installation.
- Reports. After installation, request a report stating the depth and final torque of each screw shaft.
Expert advice from Arman Kusainov: Do not skimp on the capping beam. For a timber house, combine a channel bar and 200×200 mm timber. This will distribute the load and prevent deformation.
Screw piles in Almaty are installed in seven stages: marking out, screwing in with level control, cutting to the horizontal, concreting the shaft, welding on the caps, treating the seams with anti-corrosion compound, installing the grillage. The work takes one day for an average-sized house.
A pile foundation is an engineered solution for 80% private buildings in Almaty. The technology minimises the influence of soils and shortens construction time. The key to reliability is engineering calculation, quality materials and professional installation.