
Car wash construction in Astana
and the regionfrom 25 000 ₸*/m² in 1 month*Crew labour cost
High-quality mobile and stationary car washes thanks to advanced technologies, eco-friendly solutions and strict control at every stage of construction
Modern solutions for saving water and energy
Seismic resistance of up to 10 points
Extended warranty from 5 years
Material service life 50+ years

Car wash construction in Astana
and the region
from 25 000 ₸*/m² in 1 month
*Crew labour cost
High-quality mobile and stationary car washes thanks to advanced technologies, eco-friendly solutions and strict control at every stage of construction
Modern solutions for saving water and energy
Seismic resistance of up to 10 points
Extended warranty from 5 years
Material service life 50+ years

Car wash construction in Astana
and the region
from 25 000 ₸*/m² in 1 month
*Crew labour cost
High-quality mobile and stationary car washes thanks to advanced technologies, eco-friendly solutions and strict control at every stage of construction
Modern solutions for saving water and energy
Seismic resistance of up to 10 points
Extended warranty from 5 years
Material service life 50+ years
materials we build car washes from

brick



FINBLOCK

heat block



foam block





materials we build car washes from













brick
AERATED CONCRETEMONOLITHFINBLOCK
heat block
GAS BLOCKSIP PANELSfoam block
FRAMEMODULESSandwich panelsPOLYSTYRENE CONCRETEsteel structuresWe will call you back within 3 minutes
materials we build car washes from













brick
AERATED CONCRETEMONOLITHFINBLOCK
heat block
GAS BLOCKSIP PANELSfoam block
FRAMEMODULESSandwich panelsPOLYSTYRENE CONCRETEsteel structuresWe will call you back within 3 minutes
Cost of car wash construction in Astana
| MATERIAL | TERM | SEISMIC RATING | SHELL | PRE-FINISH | FINISHED |
|---|---|---|---|---|---|
| SIP panel | 30 days | 9 points | from 75 000 KZT | - | from 165 000 KZT |
| Frame | 2 - 3 months | 9 points | from 75 000 KZT | - | from 185 000 KZT |
| Foam block | 2 - 3 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Gas block | 2 - 3 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Monolith | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Heat block | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Brick | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Finblock | 3 - 4 months | 9 points | from 98 000 KZT | from 140 000 KZT | from 170 000 KZT |
| Modules | 1 - 3 months | 9 points | from 75 000 KZT | - | from 145 000 KZT |
| MATERIAL | TERM | SEISMIC RATING | SHELL | PRE-FINISH | FINISHED |
|---|---|---|---|---|---|
| SIP panel | 30 days | 9 points | from 25 000 KZT | - | from 75 000 KZT |
| Frame | 2 - 3 months | 9 points | from 25 000 KZT | - | from 92 000 KZT |
| Foam block | 2 - 3 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Gas block | 2 - 3 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Monolith | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Heat block | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Brick | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Finblock | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
MATERIAL
TERM
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 75000 KZT
-
from 165000 KZT
Frame
2 - 3 months
9 points
from 75000 KZT
-
from 185000 KZT
Foam block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Gas block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Monolith
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Heat block
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Brick
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Finblock
3 - 4 months
9 points
from 98000 KZT
from 140000 KZT
from 170000 KZT
Modules
1 - 3 months
9 points
from 75000 KZT
-
from 145000 KZT
MATERIAL
TERM
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 25000 KZT
-
from 75000 KZT
Frame
2 - 3 months
9 points
from 25000 KZT
-
from 92000 KZT
Foam block
2 - 3 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Gas block
2 - 3 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Monolith
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Heat block
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Brick
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Finblock
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
MATERIAL
TERM
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 75000 KZT
-
from 165000 KZT
Frame
2 - 3 months
9 points
from 75000 KZT
-
from 185000 KZT
Foam block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Gas block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Monolith
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Heat block
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Brick
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Finblock
3 - 4 months
9 points
from 98000 KZT
from 140000 KZT
from 170000 KZT
Modules
1 - 3 months
9 points
from 75000 KZT
-
from 145000 KZT
MATERIAL
TERM
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 25000 KZT
-
from 75000 KZT
Frame
2 - 3 months
9 points
from 25000 KZT
-
from 92000 KZT
Foam block
2 - 3 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Gas block
2 - 3 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Monolith
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Heat block
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Brick
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
Finblock
3 - 4 months
9 points
from 45000 KZT
from 65000 KZT
from 76000 KZT
our company's services
- 01.
Building construction
We offer a full range of building construction services - from developing the design to handing over the finished property.
- 02.
We develop custom building designs taking all your wishes into account.
- 03.
obtaining permits
We take on the entire process of obtaining the permits required to start construction.
- 04.
Steel structures
We manufacture and install steel structures of any complexity - garages, hangars and warehouses.
- 05.
Interior finishing
We carry out interior finishing - from rough work to final finishes.
- 06.
Exterior finishing
We finish the facades from the foundation to the roof.
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe for building your car wash in 1 minute
catalogue of completed car wash projects
The price is given for shell construction, including the cost of building materials

Project No. 605Building area: 1080 m²
Building footprint: 1080 m²
Customer reviews of car wash construction in Astana
Your feedback matters a great deal to us






Car washes in Astana
Investing in car wash construction requires a systematic approach. Fragmented work - hiring separate contractors for design, earthworks and installation - leads to losses of time and money. The turnkey format hands all the risks to one company and ensures control at every stage.
In the past, entrepreneurs often converted old premises, which caused problems with heating and humidity. Modern technologies completely eliminate these drawbacks: sandwich panels provide energy efficiency, and their installation significantly reduces the construction time of the facility.
Designing a car wash as the foundation of success
Expert advice from Yerlan Tleukhanov, lead design engineer for car wash complexes: Do not start earthworks without an approved design. Pouring the slab before the design is ready is a common mistake. In 90% of cases this leads to costly rework: dismantling the concrete to run utilities and relocating the drainage channels.



Choosing the format: self-service wash or hand wash
Parameter | Self-service car wash construction | Hand conveyor car wash construction |
Initial investment | Moderate. A large staff is not required. | High. A payroll fund is required. |
Payback period | Fast thanks to low running costs. | Slow due to high variable costs. |
Management | Complex. Reliable payment terminals and a cash collection system are needed. | Simple. Management is handled by a manager. |
Equipment | Self-service stations, powerful pumps. | Professional high-pressure units. |
Critical equipment for uninterrupted operation
Key elements:
- Water recycling and treatment system.
- High-pressure pumps and foam generation.
- Payment terminals and cash collection system.
Utility networks: the basis of a car wash's operation
Utility | Requirements and solutions |
Water supply and sewerage | Installation of a closed water-recycling system, a septic tank and storm drainage. |
Power supply | Supply of sufficient power, installation of stabilisers. |
Ventilation and heating | Supply-and-exhaust ventilation for drying, efficient heating. |
Prefabricated car washes: technological advantages
Turnkey sandwich panel car wash construction: a transparent estimate and clear deadlines
Approximate timelines for completing a «turnkey» project:
- Design and approval: 4-6 weeks.
- Construction and equipment installation: 8-10 weeks.
- Commissioning works: 2 weeks.
Expert advice from Yerlan Tleukhanov, lead design engineer for car wash complexes: Insist on including technical supervision in the contract. An independent specialist monitors the quality of the work - from pouring the foundation to installing the equipment. This helps avoid the use of poor-quality materials whose defects would show up during operation.
Franchise or custom project
The importance of a comprehensive approach
Frequently asked questions about car wash construction in Astana
What are the main requirements for a car wash plot?
- Area of at least 300-500 m2
- Availability of access roads and parking
- Ability to connect to municipal utilities (water, sewerage, electricity)
- Location away from residential buildings (at least 50 m)
- Compliance with the sanitary protection zone (class V - 50 m)
How much does it cost to build a car wash in Astana?
- Purchase or lease of a land plot: 5-15 000 000 KZT.
- Construction of the building: 7-20 000 000 KZT.
- Equipment: 3-10 000 000 KZT.
- Utilities and finishing: 2-5 000 000 KZT.
What equipment is needed for a car wash?
- High-pressure washers
- Foam generators
- Wet and dry vacuum cleaners
- Compressors
- Water treatment and recirculation systems
- Equipment for polishing and dry cleaning
- Ventilation and heating systems
What permits are needed to build a car wash in Astana?
- A building permit from the local akimat
- Approval of the design with the environmental service
- Approval from the fire inspectorate
- Permit to connect to city utilities
- Sanitary and epidemiological certificate
The process of obtaining all the permits can take from 1 to 3 months.
How to set up a water treatment system for a car wash?
- Sand traps and settling tanks for primary treatment
- Flotation units for removing petroleum products
- Mechanical and sorption filters
- A water disinfection system (UV lamps or ozonation)
- Storage tanks for treated water







