
Warehouse construction in Astana
and the regionfrom 25 000 ₸*/m² in 1 month*Crew labour cost
Durable and energy-efficient warehouses thanks to high quality standards and oversight by engineering services at every stage of construction.
200+ successfully completed projects in 25 years of workOnline broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Warehouse construction in Astana
and the region
from 25 000 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient warehouses thanks to high quality standards and oversight by engineering services at every stage of construction.
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Warehouse construction in Astana
and the region
from 25 000 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient warehouses thanks to high quality standards and oversight by engineering services at every stage of construction.
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST
prefabricated warehouses we build

Cold hangar

insulated hangar

insulated steel structure building
prefabricated warehouses we build



Cold hangar
insulated hangar
insulated steel structure building
We will call you back within 3 minutes
prefabricated warehouses we build



Cold hangar
insulated hangar
insulated steel structure building
We will call you back within 3 minutes
The cost of building a warehouse in Astana
| TERM | MATERIAL | COST OF FINISHING WORK |
|---|---|---|
| from 30 days | Hangar-type building (cold) | from 23500 KZT/m2 |
| from 30 days | Hangar-type building (insulated) | from 30000 KZT/m2 |
| from 30 days | Steel structure + sandwich panel building | from 70000 KZT/m2 |
The advantages of building warehouses with Profi-Dom

25-50 years
The service life of a warehouse when building codes are followed and the structure is properly operated and maintained

Seismic resistance of 10 points
Prefabricated warehouses have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones

Top quality class
Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
from -50°C to +50°C
Maintaining the required temperature to within 0.5°C

100% thermal insulation
Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
Resistance to natural disasters
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
The advantages of building warehouses with Profi-Dom

The service life of a warehouse when building codes are followed and the structure is properly operated and maintained
25-50 years

Prefabricated warehouses have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
Seismic resistance of 10 points

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°C to +50°C

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100% thermal insulation
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters
We will call you back within 3 minutes
The advantages of building warehouses with Profi-Dom

The service life of a warehouse when building codes are followed and the structure is properly operated and maintained
25-50 years

Prefabricated warehouses have a level of seismic protection comparable to that of nuclear power plants in earthquake-prone zones
Seismic resistance of 10 points

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°C to +50°C

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100% thermal insulation
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters
We will call you back within 3 minutes
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe for building your prefabricated warehouse in 1 minute
catalogue of completed warehouse projects
The price is given for shell construction, including the cost of building materials

Project No. 577Building area: 1080 m²
Building footprint: 1080 m²

Project No. 579Building area: 7344 m²
Building footprint: 7344 m²

Project No. 580Building area: 1080 m²
Building footprint: 1080 m²

Project No. 584Building area: 1120 m²
Building footprint: 1120 m²

Project No. 586Building area: 1200 m²
Building footprint: 1200 m²

Project No. 597Building area: 3 166 m²
Building footprint: 3 166 m²

Project No. 599Building area: 1584 m²
Building footprint: 1584 m²
Customer reviews of prefabricated warehouse construction in Astana
Your feedback matters a great deal to us






Warehouse construction in Astana
The logistics and e-commerce market in Astana is growing at a rapid pace. This creates a shortage of quality storage premises and pushes entrepreneurs to look for technologies that allow facilities to be commissioned as quickly as possible.
Building prefabricated logistics complexes based on light steel structures and sandwich panels has become the optimal answer to this challenge. In this article we will take a detailed look at how to design and deliver a modern, energy-efficient and cost-effective facility in the capital of Kazakhstan, taking into account all the local specifics - from the climate to the regulatory framework.
Prefabricated warehouses - the backbone of modern logistics in Astana
The evolutionary path: how the warehouse market in Astana arrived at prefabricated solutions
What makes up the cost of building a warehouse in Astana
Table: Calculation of the time and cost of building a 1000 m² warehouse
Stage of work | Share of the total cost (%) | Timeframe (weeks) | Key parameters |
Design and expert review | 5-7% | 3-4 | Development of SS, DSS, AS; accounting for the fire codes of Kazakhstan |
Construction of the foundation and floor | 20-25% | 4-5 | M300 concrete, reinforcement, fibre, topping |
Installation of the steel frame (LMS) | 15-20% | 3-4 | S255 steel, galvanised fasteners |
Installation of the building envelope | 15-20% | 3-4 | 100-120mm sandwich panels, PIR insulation |
Installation of the gates and dock equipment | 5-10% | 2 | Sectional gates, dock shelters, dock levellers |
Engineering systems | 20-25% | 4-5 | Heating (IR heaters/water), ventilation, fire alarm and sprinklers |
Commissioning work and handover | 3-5% | 1 | Commissioning of the equipment, obtaining permits |
Structure and frame: spans, column spacing and the height to the bottom of the trusses
- Spans (building width): Modern steel frames can span from 18 to 36 metres without intermediate supports. This creates an ideal space for manoeuvring forklifts and organising racking systems.
- Column spacing (the distance between supports along the building): The standard spacing is 6 metres. Increasing the spacing to 9-12 metres raises the cost of the steel frame but gives a gain in free space and simplifies the racking layout.
- Height to the bottom of the trusses: To use multi-level racking (mezzanines), the minimum height is 10 metres. For standard pallet storage 8 metres is enough. The choice of height is a key trade-off: the taller the building, the higher the heating costs and the more expensive the building envelope.
Expert advice from Damir Alpysbayev, head of industrial construction projects:“Work out the racking layout with logistics specialists in advance. Its configuration dictates the optimal column spacing and height. Skimping on consultation at this stage leads to losing up to 15% of the usable volume of the building.”
The building envelope: comparing PIR sandwich panels and mineral wool
Table: Comparison of sandwich panels with different insulation
Parameter | PIR (polyisocyanurate) | Mineral wool |
Thermal conductivity | Low (0.022-0.025 W/m°C) | Medium (0.035-0.042 W/m°C) |
Moisture permeability | Practically zero (closed cells) | High, requires a reliable vapour barrier |
Fire safety | G1-G2 (Low flammability) | NC (Non-combustible) |
Cost | Higher | Lower |
Weight | Lighter | Heavier |
The main trade-off | Better thermal efficiency and moisture resistance at a higher price | Perfect fire safety, but risks of getting wet and shrinking |
For production and warehouse facilities in Astana, where energy efficiency and humidity control are especially important, PIR remains the optimal solution despite the initial outlay.
Heating and ventilation: how to keep warm in winter without going broke on OPEX
Table: Comparison of heating systems for a warehouse
System | How it works | Pros | Trade-offs / Downsides |
Gas air heaters | Air is heated by a burner and distributed by fans | Low CAPEX, fast installation and heating | High OPEX, burns oxygen, requires good ventilation |
Gas infrared (IR) emitters | Heats surfaces (floor, equipment) rather than the air | Savings of up to 50% on OPEX, no dust circulation | High CAPEX, spot heating, requires high-level installation |
Water heating (boiler room + radiators/underfloor heating) | A classic system with a liquid heat carrier | Comfortable, even heating | High CAPEX and installation time, risk of the system freezing up in a breakdown |
Air curtains over the gates | Creating a barrier of warm air | A mandatory element, sharply reduces heat loss | Not a main heating system, uses energy |
Fire safety: requirements and solutions (sprinklers, alarm)
- Automatic fire alarm (AFA): Mandatory. Smoke and heat detectors must cover the entire building.
- Automatic sprinkler fire suppression system: Required for class A and B warehouses, as well as where the height of stored goods exceeds 5.5 metres. This is not just a requirement, it is your insurance against losing all your goods.
- Evacuation warning and management system (EWMS): Ensures the timely evacuation of staff.
Stages of warehouse construction: from design to commissioning
Pre-design stage and feasibility study
At this stage we analyse your business processes, freight flows and future loads. We develop a Feasibility Study that defines the budget framework and the key parameters of the facility: area, height, number of gates and requirements for the utility systems.
Engineering surveys and design
- SS (Steel Structures) - calculation of the frame for the wind and snow loads of Astana.
- DSS (Detailed Steel Structures) - drawings for manufacturing the steel frame elements.
- AS (Architectural Solutions) - layouts, facades, joints.
- Engineering sections (H&V, WS&S, PS) - designs for heating, water supply and power supply.
- WEP (Work Execution Plan) - a step-by-step construction plan.
Expert advice from Damir Alpysbayev, head of industrial construction projects: “Insist on designer supervision from the project designer. The real site always makes its own corrections, and promptly updating the design will protect you from installation errors and later rework.”
A warehouse for your business: from design to a working asset
We design turnkey warehouses not as abstract “boxes” but as living systems subordinated to your business processes. Our goal is for the column spacing, ceiling height and placement of each dock to ensure maximum operational efficiency, while the estimate and deadlines fixed in the contract remain unchanged.
Frequently asked questions about building warehouses in Astana
What are the main advantages of prefabricated warehouses?
- Short construction time (from 1 to 3 months)
- Lower construction costs compared with permanent buildings
- The option of quick expansion or dismantling
- Lightness of the structure, reducing the load on the foundation
- High energy efficiency thanks to modern materials
- The option of installation in remote areas
- Adaptability to various climatic conditions
What types of structures are used for prefabricated warehouses?
- Framed metal structures (steel or aluminium)
- Frameless arched structures
- Tent structures on a metal frame
- Modular block structures
- Precast reinforced concrete structures
- Light gauge steel framing (LGSF)
How is thermal insulation provided in prefabricated warehouses?
- Use of sandwich panels with a mineral wool or PIR core
- Use of sprayed polyurethane foam
- Installation of thermal insulation mats made of glass fibre or basalt fibre
- Use of multi-layer tent materials with a thermal insulation layer
- Installation of an additional inner layer of thermal insulation
- Installation of energy-efficient windows and doors
What types of foundations are used for prefabricated warehouses?
- Slab foundation (for large warehouses and difficult soils)
- Strip foundation (for medium and small warehouses)
- Pile foundation (for weak and frost-susceptible soils)
- Pier foundation (for light structures and favourable soils)
- Screw piles (for quick installation and the option of dismantling)
- Block foundation (for temporary structures)
What utility systems are usually installed in prefabricated warehouses?
- Ventilation and air conditioning systems
- Heating systems (air or infrared heaters)
- Fire alarm and fire suppression systems
- Electrical systems and lighting (often using LED technology)
- CCTV and access control systems
- Water supply and sewerage (if required)
- Lightning protection and earthing systems
- Automatic gates and dock equipment The set of utility systems may vary depending on the purpose of the warehouse and the client's requirements.
What size limitations do prefabricated warehouses have?
- The span width can reach 30-36 metres with no intermediate supports
- The length is practically unlimited and is set by the customer's needs
- The height to the bottom chord of the truss can be from 4 to 18 metres
- The area can range from a few hundred to tens of thousands of square metres The option of modular expansion lets you start with a small warehouse and enlarge it as the business grows.
What are the specifics of operating prefabricated warehouses in winter?
- The need to regularly clear snow from the roof to prevent excessive loads
- The importance of an efficient heating system for maintaining the required temperature
- Use of heat curtains over the gates to reduce heat loss
- Control of condensation forming inside the building
- Providing an anti-slip surface on the loading areas
- Regular checks that all utility systems are working
- Maintaining optimal humidity for storing goods
- Proper operation ensures comfortable working conditions and the safety of goods even in harsh climatic conditions.













