
Prefabricated buildings in Astana
and the regionfrom 29 000 ₸*/m² in 1 month*Crew labour cost
Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of workOnline broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Prefabricated buildings in Astana
and the region
from 29 000 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Prefabricated buildings in Astana
and the region
from 29 000 ₸*/m² in 1 month
*Crew labour cost
Durable and energy-efficient buildings thanks to high quality standards and oversight by engineering services at every stage of construction
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST
Prefabricated buildings and structures we construct












Prefabricated buildings and structures we construct
We will call you back within 3 minutes
Prefabricated buildings and structures we construct
We will call you back within 3 minutes
prefabricated
buildings fall into 2 types:

WITH POLYSTYRENE CONCRETE INSULATION

WITH MINERAL WOOL INSULATION
prefabricated
buildings fall into 2 types:

WITH POLYSTYRENE CONCRETE INSULATION

WITH MINERAL WOOL INSULATION
prefabricated
buildings fall into 2 types:


WITH MINERAL WOOL INSULATION
WITH POLYSTYRENE CONCRETE INSULATION
Cost of prefabricated building construction in Astana
The price is given for the work, including the cost of building materials
| TERM | COST OF WORK WITHOUT MATERIALS PER M2 | COST OF WORK WITH MATERIALS PER M2 |
|---|---|---|
| from 30 days | 29000 KZT/m2 | from 90000 KZT/m2 |
construction options
The price includes work and materials
Shell/pre-finish package
Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement
Pouring the foundation cushion or strip with vibration
Dismantling the formwork
Plumbing layout
Preparing and installing the base for the load-bearing columns
Backfilling and levelling the floor with sand-gravel mix
Rough floor screed
Installation of load-bearing columns
Assembly of the building's steel frame with reinforcement and bracing
Installation of the metal roofing system
Installation of sandwich panels on the building and roof
Installation of the staircase frame (if two or more storeys)
from 90 000 KZT/m2
Finished package
All the work and materials from the shell package
Installation of 4--chamber windows
Installing the entrance door
Installation of interior partitions
Installing the substructure for drywall
Plasterboard installation
Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)
Installing plumbing (laying pipes, outlets for plumbing connections)
Installation of the heating system (installation of the heating system, either radiators or underfloor heating)
Wall painting
Pouring the finish screed to level the floor
Installation of stretch ceilings
Installation of finished floors (class 32 laminate or linoleum)
Installing sockets and switches
Installing interior doors
depending on the type of materials chosen for the finishing work
from 130 000 KZT/m2
construction options
The price includes work and materials
The price includes work and materials
Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement
Pouring the foundation cushion or strip with vibration
Dismantling the formwork
Plumbing layout
Preparing and installing the base for the load-bearing columns
Backfilling and levelling the floor with sand-gravel mix
Rough floor screed
Installation of load-bearing columns
Assembly of the building's steel frame with reinforcement and bracing
Installation of the metal roofing system
Installation of sandwich panels on the building and roof
Installation of the staircase frame (if two or more storeys)
from 90 000 KZT/m2
The price includes work and materials
depending on the type of materials chosen for the finishing work
All the work and materials from the shell package
Installation of 4--chamber windows
Installing the entrance door
Installation of interior partitions
Installing the substructure for drywall
Plasterboard installation
Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)
Installing plumbing (laying pipes, outlets for plumbing connections)
Installation of the heating system (installation of the heating system, either radiators or underfloor heating)
Wall painting
Pouring the finish screed to level the floor
Installation of stretch ceilings
Installation of finished floors (class 32 laminate or linoleum)
Installing sockets and switches
Installing interior doors
from 130 000 KZT/m2
construction options
The price includes work and materials
The price includes work and materials
Site preparation (marking out the building's placement points, preparing the soil base for the cushion or trenches for a strip foundation, installing the formwork) with reinforcement
Pouring the foundation cushion or strip with vibration
Dismantling the formwork
Plumbing layout
Preparing and installing the base for the load-bearing columns
Backfilling and levelling the floor with sand-gravel mix
Rough floor screed
Installation of load-bearing columns
Assembly of the building's steel frame with reinforcement and bracing
Installation of the metal roofing system
Installation of sandwich panels on the building and roof
Installation of the staircase frame (if two or more storeys)
from 90 000 KZT/m2
depending on the type of materials chosen for the finishing work
The price includes work and materials
All the work and materials from the shell package
Installation of 4--chamber windows
Installing the entrance door
Installation of interior partitions
Installing the substructure for drywall
Plasterboard installation
Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)
Installing plumbing (laying pipes, outlets for plumbing connections)
Installation of the heating system (installation of the heating system, either radiators or underfloor heating)
Wall painting
Pouring the finish screed to level the floor
Installation of stretch ceilings
Installation of finished floors (class 32 laminate or linoleum)
Installing sockets and switches
Installing interior doors
from 130 000 KZT/m2
Advantages of building a prefabricated building with Profi-Dom

Cheaper by 30-40%
Unlike permanent construction facilities

10-point seismic resistance
Prefabricated buildings have a level of seismic protection similar to that of nuclear power plants in earthquake-prone zones

Top quality class
Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
from -50°
C to +50°C
Maintaining the required temperature to within 0.5°C
No property tax
Saves up to 2,2% of the cadastral value annually
Resistance to natural disasters
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²

100%
thermal insulation
Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
Mobility
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Sound insulation
up to 45-50 dB
Comparable to the insulation of a brick wall 25 cm thick
Advantages of building a prefabricated building with Profi-Dom

Unlike permanent construction facilities
Cheaper by 30-40%

Prefabricated buildings have a level of seismic protection similar to that of nuclear power plants in earthquake-prone zones
10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°
C to +50°C
Saves up to 2,2% of the cadastral value annually
No property tax
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100%
thermal insulation
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Mobility
Comparable to the insulation of a brick wall 25 cm thick
Sound insulation
up to 45-50 dB
We will call you back within 3 minutes
Advantages of building a prefabricated building with Profi-Dom

Unlike permanent construction facilities
Cheaper by 30-40%

Prefabricated buildings have a level of seismic protection similar to that of nuclear power plants in earthquake-prone zones
10-point seismic resistance

Thanks to the use of grade C345 steel with a yield strength of 345 MPa and an ultimate tensile strength of 490 MPa
Top quality class
Maintaining the required temperature to within 0.5°C
from -50°
C to +50°C
Saves up to 2,2% of the cadastral value annually
No property tax
They withstand wind of up to 150 km/h and a snow load of up to 400 kg/m²
Resistance to natural disasters

Heat transfer coefficient U = 0.2-0.3 W/(m²·K), which meets modern energy-efficiency standards
100%
thermal insulation
Relocating or expanding the building by 100% of its area takes only 2-3 weeks
Mobility
Comparable to the insulation of a brick wall 25 cm thick
Sound insulation
up to 45-50 dB
We will call you back within 3 minutes
our company's services
- 01.
Building construction
We offer a full range of building construction services - from developing the design to handing over the finished property.
- 02.
We develop custom building designs taking all your wishes into account.
- 03.
obtaining permits
We take on the entire process of obtaining the permits required to start construction.
- 04.
Steel structures
We manufacture and install steel structures of any complexity - garages, hangars and warehouses.
- 05.
Interior finishing
We carry out interior finishing - from rough work to final finishes.
- 06.
Exterior finishing
We finish the facades from the foundation to the roof.
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe for building your prefabricated building in 1 minute
catalogue of completed prefabricated building projects
The price is given for shell construction, including the cost of building materials

Project No. 223 ShopBuilding area: 427 m²
Building footprint: 447,18 m²

Project No. 226 ShopBuilding area: 2077 m²
Building footprint: 2292 m²

Project No. 227 Swimming poolBuilding area: 2004 m²
Building footprint: 5654,4 m²

Project No. 229 TownhouseBuilding area: 117 m²
Building footprint: 480 m²

Project No. 230 TownhouseBuilding area: 228,61 m²
Building footprint: 1132,88 m²

Project No. 231 TownhouseBuilding area: 366,6 m²
Building footprint: 1000 m²

Project No. 632Total area: 13 824 m²
Building footprint: 13 824 m²
Customer reviews of prefabricated building construction in Astana
Your feedback matters a great deal to us






Stages of construction work
for a prefabricated building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Stages of construction work
for a prefabricated building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Stages of construction work
for a prefabricated building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Prefabricated building construction in Astana
A prefabricated facility is handed over in 2–4 months, whereas permanent construction drags on for years. The technology creates warehouses, workshops and logistics terminals with a predictable budget and fixed deadlines. This material is a technical guide for owners and engineers. You will get a detailed breakdown of the cost per m², a comparison of LGSF and frame technologies, the site requirements and recommendations for choosing a contractor. Prefabricated building construction solves business's main problem - lengthy downtime.
What modular structures are and how they work in the climate of Astana
The evolution of construction in Astana: from cinder block workshops to precise LGSF structures
A timber frame was tried as an alternative. But in the conditions of Astana the wood rotted, required constant treatment and was unsuitable for industrial facilities because of its low fire safety. These technologies did not catch on.
The modern solution is light-gauge steel framing (LGSF) and sandwich panels. They elegantly solve the problems of their predecessors. Factory production eliminates weather risks at the manufacturing stage. Installation is carried out all year round, joining the elements with bolts. The precise geometry of the panels shortens the assembly time, and the fixed estimate makes the budget predictable.
Expert advice from Aidar Nurlanov, LGSF project manager, structural engineer: "Do not skimp on the thermal engineering calculation. Ordering a standard design without accounting for Astana's climate leads to wall freezing and condensation. Require the contractor to calculate the dew point for the chosen panel thickness. For an unheated warehouse 100 mm is enough, for a heated workshop 120–150 mm, and for an office 200 mm."
Prefabricated building technologies: LGSF versus frame systems
Parameter | LGSF (light-gauge steel structures) | Steel frame (hot-rolled section) |
Installation time (1000 m²) | 4–6 weeks | 8–12 weeks |
Service life | 50+ years | 75+ years |
Frame cost | Lower by 20–30% | Higher |
Strength limit | Up to 18 m span | Up to 30 m span with no intermediate supports |
Corrosion resistance | Requires quality galvanisation | More stable |
Cost of prefabricated buildings: what makes up the price per m²
Building type and specification | Price range (per m²) | What it usually includes |
Simple warehouse complex (without heating, minimal finishing) | 25 000 – 40 000 Kzt | Foundation, frame, enclosing structures (cold panels), gates and basic electrics. |
Production building (with heating, basic finishing and engineering systems) | 40 000 – 60 000 Kzt | An insulated "warm envelope", heating, ventilation, water supply and more complex electrics. |
Office or retail building (with full turnkey finishing) | 60 000 – 100 000+ Kzt | A full range of works: from the foundation to the final finishing, air conditioning, modern communications and lighting systems. |
The flip side of a low price is the hidden operating costs. Saving on the insulation thickness leads to higher heating bills in winter. Simplifying the frame without accounting for the snow load risks a roof collapse.
Stages of prefabricated building construction: from design to commissioning
Design (2–4 weeks).
The engineer develops the architectural plan, the structural part and the engineering systems. At this stage the loads are calculated, the grade of steel is selected and the insulation thickness is determined. The finished design is approved by the state authorities.
Fabrication of structures (3–5 weeks).
At the factory, the section is cut and the panels produced according to the working drawings. Quality control rules out defects, and the marking of the elements speeds up the subsequent assembly.
Foundation works (2–3 weeks).
A strip or pile foundation is poured. A shallow-set type of base is suitable for LGSF structures - this reduces the time and lowers the construction cost.
Installation (4–6 weeks).
The installation crew assembles the frame, carries out the panel cladding and installs the roof and gates. The work can be carried out even at temperatures down to –25 °C, which allows the process not to be interrupted.
Expert advice from Aidar Nurlanov, LGSF project manager, structural engineer: "Require the contractor to provide a project schedule in the form of a Gantt chart. It must build in weather and logistics risks. If the schedule promises installation in 2 weeks in winter, that is unrealistic. The norm is 1–2 weeks for the foundation and 3–4 weeks for the frame and cladding."
Comparing prefabricated and permanent buildings: when the choice is obvious
Criterion | Prefabricated building (LGSF) | Permanent building (brick, RC) |
Construction time (1000 m²) | 2–4 months | 12–24 months |
Service life | 50 years | 100+ years |
Energy efficiency | High (with the right panels) | Medium (requires additional insulation) |
Layout flexibility | Easy to dismantle and expand | Complex and expensive remodelling |
Foundation type | Lightweight | Massive, requires high costs |
Criterion | Prefabricated (LGSF) | Permanent (brick, RC) |
Site requirements and approvals for construction in Astana
Key requirements:
- Geology: Carrying out surveys to determine the soil type. The loams in Astana require a pile foundation.
- Utilities: Availability of technical conditions for connecting electricity, water supply and sewerage.
- Permits: Obtaining the urban development plan, the building permit and approval of the design by the fire service and the sanitary authority.
Prefabricated buildings Astana: warranty and operation
Energy efficiency is the main advantage with proper design. A building with 150 mm panels holds heat like a brick wall 1.5 metres thick. But thermal bridges form at the panel joints and around openings. Quality installation eliminates this problem.
Technical supervision is a mandatory stage. The engineer monitors compliance with the design, the quality of the welds and the tightness of the joints. Saving on technical supervision leads to a skewed frame and roof leaks.
How to choose a contractor for construction in Astana
Frequently asked questions about prefabricated building construction in Astana
What are prefabricated buildings?
What are the construction times for prefabricated buildings?
- Size of the building: a small pavilion can be assembled in 2-3 weeks, while a large warehouse complex may require 2-3 months.
- Complexity of the project: specific requirements for the layout, engineering systems or finishing can increase the construction time.
- Site preparation: if significant work is required to prepare the foundation or the territory, this can add time to the overall schedule.
- Availability of materials and labour: with good logistics and an experienced crew, the timeframes can be minimal.
- Weather conditions: although weather affects prefabricated structures less than traditional ones, extreme conditions can cause delays.
How durable are prefabricated buildings?
- Quality of the materials used: modern steel structures and sandwich panels are highly resistant to corrosion and environmental exposure.
- Correct installation: quality assembly ensures the stability of the structure and prevents premature wear.
- Regular maintenance: periodic inspections and timely repairs significantly extend the service life.
- Climatic conditions: although the buildings are adapted to various conditions, an extreme climate can affect durability.
- Purpose of the building: industrial facilities may require more frequent updating due to intensive use.
Can prefabricated buildings be used in regions with a harsh climate?
The key aspects of adapting to a harsh climate include:
- Thermal insulation: Sandwich panels provide excellent thermal insulation. The thickness and type of insulation can vary depending on the climatic requirements.
- Strength of the structure: The metal frame is calculated to account for the wind and snow loads typical of the region.
- Heating and ventilation systems: The buildings are equipped with systems capable of maintaining a comfortable temperature in any conditions.
- Corrosion protection: Materials with an anti-corrosion coating are used to protect against humidity and temperature swings.
- Special solutions: For example, enhanced waterproofing for regions with heavy precipitation or special coatings to protect against sandstorms in desert areas.
Thanks to these characteristics, prefabricated buildings are successfully used in Astana and Kazakhstan, providing comfortable conditions all year round.
Is a special foundation required for prefabricated buildings?
- Soil type: Astana is dominated by loams and clays, often frost-heaving and prone to seasonal deformation from freezing and thawing. On some plots loess-like soils may occur. Geological surveys are needed to determine the soil characteristics on a specific plot. It is also necessary to take into account the possible subsidence of soils, especially in areas subjected to flooding or built on without proper preparation.
- Size and purpose of the building: Large facilities with heavy equipment (for example, production workshops, warehouses) need a stronger foundation than small structures (for example, storage hangars). The purpose of the building determines the loads on the foundation.
- Groundwater level: In some districts of Astana a high groundwater level can affect the choice of foundation type and require additional waterproofing and drainage measures. The groundwater level is subject to seasonal fluctuations, which must be taken into account during design.
- Soil freezing depth: A critically important factor. In Astana the freezing depth can reach 1.8-2 metres. The foundation must be laid below this depth, or measures must be taken to protect against frost heave.
- Climatic conditions: Astana's sharply continental climate with large temperature swings requires the use of frost-resistant materials and careful calculation of the foundation's thermal insulation, especially if the hangar is to be heated.
- Artificial fill soils: Due to active development, Astana often has plots with artificial fill soils, which have low bearing capacity and require special solutions to strengthen the base.
- Specifics of utility networks: The location and depth of the utility networks must be taken into account when designing the foundation, in order to avoid damaging them and to ensure access for maintenance.
It is worth noting that in Astana the foundation design must be carried out with account for the local building codes and regulations (SNiP RK), and must also include seismic resistance calculations; although Astana is not in a zone of high seismic activity, seismic effects still need to be taken into account. It is also important to account for the wind and snow loads typical of the region.
Is a permit required to build a prefabricated building?
- Purpose of the building: Commercial, industrial and public buildings require a full package of permit documentation. A simplified procedure may apply to temporary structures.
- Size of the building: Large facilities undergo more thorough checks and require more detailed documentation.
- Location: The requirements differ depending on the district (city centre, industrial zones, suburbs) and the development zone (business, residential, recreational).
- Duration of use: Temporary structures, for example for exhibitions or seasonal trade, may obtain a permit under a simplified procedure.
The process of obtaining a permit usually includes:
- Preparation of design documentation taking local building codes into account
- Approval from the Astana architecture and urban planning department
- Obtaining approvals from the fire service, the sanitary and epidemiological station and the environmental authority
- Submitting an application to the Department of State Architecture and Construction Control (GASK)
- Obtaining a building permit














































































