
modular buildings in Astana
and the regionfrom 75 000 ₸*/m² including materials, 1 month
Modern, safe buildings thanks to high quality standards and oversight by engineering services at every stage of construction, in just 1 day at any time of year!
200+ successfully completed projects in 25 years of workOnline broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

modular buildings in Astana
and the region
from 75 000 ₸*/m² including materials, 1 month
calculate the construction costModern, safe buildings thanks to high quality standards and oversight by engineering services at every stage of construction, in just 1 day at any time of year!
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

modular buildings in Astana
and the region
from 75 000 ₸*/m² including materials, 1 month
Modern, safe buildings thanks to high quality standards and oversight by engineering services at every stage of construction, in just 1 day at any time of year!
200+ successfully completed projects in 25 years of work
Online broadcast of the construction progress 24/7*
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST
Design features of modular buildings
The modules are made from durable materials such as a steel frame clad with sandwich panels or light-gauge steel framing (LGSF). On site the modules are joined together to form a single building.



Modular construction provides high build speed, energy efficiency, mobility and the ability to later dismantle or expand the buildings.
Design features of modular buildings
The modules are made from durable materials such as a steel frame clad with sandwich panels or light-gauge steel framing (LGSF). On site the modules are joined together to form a single building.

Modular construction provides high build speed, energy efficiency, mobility and the ability to later dismantle or expand the buildings.


Design features of modular buildings
The modules are made from durable materials such as a steel frame clad with sandwich panels or light-gauge steel framing (LGSF). On site the modules are joined together to form a single building.
Modular construction provides high build speed, energy efficiency, mobility and the ability to later dismantle or expand the buildings.





modular buildings we construct









modular buildings we construct
We will call you back within 3 minutes
modular buildings we construct
We will call you back within 3 minutes
Cost of modular building construction in Astana
| TERM | MATERIAL | COST OF FINISHING WORK |
|---|---|---|
| from 30 days | Hangar-type building (cold) | from 23500 KZT/m2 |
| from 30 days | Hangar-type building (insulated) | from 30000 KZT/m2 |
| from 30 days | Steel structure + sandwich panel building | from 70000 KZT/m2 |
Advantages of modular building construction
Mobility
The structure can be dismantled, transported and reassembled at a new location

100% Strength and stability
The structure's properties allow buildings to be erected even on mountain slopes

Energy
efficiency
The walls are reliably protected with insulation, which reduces heating costs

100% Eco-friendliness
The materials contain no harmful components or dust

Budget savings
Build a modular house 2 times cheaper than a house from other materials

Installation in 1 day
The building does not undergo settlement and can do without a foundation, so turnkey construction takes just 30 days, and installation 1 day
Advantages of modular building construction
The structure can be dismantled, transported and reassembled at a new location
Mobility

The structure's properties allow buildings to be erected even on mountain slopes
100% Strength and stability

The walls are reliably protected with insulation, which reduces heating costs
Energy
efficiency

The materials contain no harmful components or dust
100% Eco-friendliness

Build a modular house 2 times cheaper than a house from other materials
Budget savings

The building does not undergo settlement and can do without a foundation, so turnkey construction takes just 30 days, and installation 1 day
Installation in 1 day
We will call you back within 3 minutes
Advantages of modular building construction
The structure can be dismantled, transported and reassembled at a new location
Mobility

The structure's properties allow buildings to be erected even on mountain slopes
100% Strength and stability

The walls are reliably protected with insulation, which reduces heating costs
Energy
efficiency

The materials contain no harmful components or dust
100% Eco-friendliness

Build a modular house 2 times cheaper than a house from other materials
Budget savings

The building does not undergo settlement and can do without a foundation, so turnkey construction takes just 30 days, and installation 1 day
Installation in 1 day
We will call you back within 3 minutes
our company's services
- 01.
Building construction
We offer a full range of building construction services - from developing the design to handing over the finished property.
- 02.
We develop custom building designs taking all your wishes into account.
- 03.
obtaining permits
We take on the entire process of obtaining the permits required to start construction.
- 04.
Steel structures
We manufacture and install steel structures of any complexity - garages, hangars and warehouses.
- 05.
Interior finishing
We carry out interior finishing - from rough work to final finishes.
- 06.
Exterior finishing
We finish the facades from the foundation to the roof.
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe for building your modular building in 1 minute
catalogue of completed modular building projects
The price is given for shell construction, including the cost of building materials

Project No. 223 ShopBuilding area: 427 m²
Building footprint: 447,18 m²

Project No. 226 ShopBuilding area: 2077 m²
Building footprint: 2292 m²

Project No. 227 Swimming poolBuilding area: 2004 m²
Building footprint: 5654,4 m²

Project No. 229 TownhouseBuilding area: 117 m²
Building footprint: 480 m²

Project No. 230 TownhouseBuilding area: 228,61 m²
Building footprint: 1132,88 m²

Project No. 231 TownhouseBuilding area: 366,6 m²
Building footprint: 1000 m²

Project No. 632Total area: 13 824 m²
Building footprint: 13 824 m²
Customer reviews of prefabricated modular building construction in Astana
Your feedback matters a great deal to us






Stages of construction work for a prefabricated modular building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Stages of construction work for a prefabricated modular building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Stages of construction work for a prefabricated modular building






Preparatory work
Carrying out engineering surveys
Building design
Manufacture of building components at the factory
Erecting the building
Commissioning
Turnkey modular buildings in Astana
The approach to construction in Astana has changed radically: speed, mobility and a predictable budget have become a reality. These prefabricated structures are ready-made engineering products that are made at the factory and quickly assembled on your site. If you need an urgent office, warehouse, retail outlet or shift camp, the technology lets you avoid the many months of waiting and the risk of a rising estimate typical of permanent construction. This article is a detailed guide that reveals every aspect of choosing, pricing, installing and operating such structures in the conditions of the capital. Their practicality and affordability make modular buildings in Astana a sought-after solution for business and private projects!
What a modular structure is and how it is built
Key advantages: why people choose prefabricated modular buildings
Since most of the work is done in the workshop, the risks of cost overruns due to weather or the human factor are minimal. In addition, you get flexibility: the facility can easily be expanded by adding new modules or dismantled for relocation to another site.
Turnkey modular building construction: what makes up the cost in Astana
Cost item | Share of the total cost | What it includes and what it depends on |
Manufacture of modules | 40–60% | Frame, insulation, finishing, windows/doors, rough electrics, plumbing. |
Foundation | 5–15% | Screw piles, an RC slab or blocks. Depends on the soil. |
Logistics and delivery | 5–10% | Transport from the factory to the site in Astana. |
Installation and commissioning | 10–20% | Joining the modules, connecting to networks, starting up the systems. |
External utility networks | 5–15% | Connection of electricity, water supply and sewerage. |
Finishing and options | 5–15% | Final finishing, air conditioning, heat recovery, etc. |






Metal frame
Timber frame
Sandwich panels



Metal frame
Timber frame
Sandwich panels
Stages of modular building construction: a roadmap from idea to handover
Stage | Timeframe | Scope of work and result |
1. Design and specification | 3–7 days | Site visit, measurements, creation of a 3D layout, fixing the specification and price. |
2. Module production | 14–30 days | Manufacture of container blocks in the workshop with quality control at every section. |
3. Foundation preparation | 1–3 days | In parallel with production: installation of a pile or other foundation. |
4. Delivery and installation | 1–5 days | Delivery of the modules, their installation, connection and roof assembly. |
5. Utility connection | 1–3 days | Connection of utility networks, commissioning of HVAC and electrical systems. |
6. Handover of the facility | 1 day | Signing the acceptance certificate, handover of documents and warranty. |
The evolution: how modular buildings reached today's standards in Astana
Certification, warranty and service: how to protect your investment
Use cases for modular buildings in Astana
- Office and administrative facilities: from small security posts to multi-storey head offices with a custom layout.
- Retail pavilions and showrooms: the option of panoramic glazing creates attractive display windows.
- Shift camps and dormitories: fully equipped with bathrooms, kitchen-dining areas and recreation rooms.
- Medical centres, rural clinics and laboratories: in compliance with all sanitary standards.
- School classrooms and kindergartens: during the renovation or major construction of the main buildings.
- Warehouses and production workshops: with the required ceiling heights and floor loads.
Operating a prefabricated building: what you need to know about service and maintenance
Expert advice from Egor Nikitin, structural engineer, expert in modular construction: «Once a year, preferably in spring, be sure to check the condition of the seals in the joints between modules and around the window units. Ultraviolet light and temperature swings in Astana make them vulnerable. Timely replacement costs next to nothing but prevents draughts and heat loss.»
Safety of prefabricated facilities: fire codes and protection against vandalism
Your fast and reliable solution in Astana
Frequently asked questions about modular building construction in Astana
How long does it take to build a modular building?
- Small facilities up to 500 m²: 2-3 weeks
- Medium buildings 500-2000 m²: 1-2 months
- Large facilities over 2000 m²: 2-3 months. The time may vary depending on the complexity of the project and the degree of factory readiness of the modules.
What materials are used as enclosing structures in modular buildings?
- Sandwich panels: 50-200 mm thick, with various insulation fillers
- Light-gauge steel framing (LGSF) with insulation
- Composite panels: a combination of metal, plastic and insulation
- Fibre cement boards with an inner insulation layer
- Modified timber panels for eco-friendly solutions
Are modular buildings suitable for the climate of Astana?
- Thermal insulation: Enhanced thermal insulation is extremely important. The heat resistance coefficient must be at least 6.0-7.0 m²·°C/W to ensure comfort in the winter months, when the temperature can drop to -30°C and below. Highly effective insulation must be used, such as high-density mineral wool, polyurethane foam (PUR) or polyisocyanurate (PIR) with closed cells. A double insulation layer and careful sealing of the seams are recommended.
- Snow load: The snow load calculation for Astana must be significantly higher than for Almaty. A value of 200-300 kg/m² must be considered, depending on the specific district and the wind rose. The roof must have a sufficient slope for snow to come off effectively and a snow retention system.
- Wind resistance: Astana is known for its strong winds, especially in winter. Wind resistance of up to 45-50 m/s is required. The structure must be reinforced to account for wind loads, and the fastenings of the modules to each other and to the foundation must be especially reliable. It is important to consider the building's aerodynamics in order to minimise the wind load.
- Frost resistance of materials: All the materials used must be frost-resistant and able to withstand temperature swings. This applies not only to the insulation but also to the exterior and interior finishing, the windows and the doors.
- Waterproofing: Thorough waterproofing is critically important to protect against moisture ingress, especially during the snowmelt period.
- Heating: An efficient heating system must be designed with the features of the modular structure in mind. The use of energy-efficient technologies such as geothermal heating or heat pumps is recommended.
Are there height restrictions for modular buildings in Astana?
- Typical height: 1-2 storeys (up to 6-9 metres) for more economical and safe construction.
- Maximum height without special measures: 3-4 storeys (up to 12-15 metres), provided the structure is carefully designed and reinforced.
- Greater height: Possible, but it requires complex design, a reinforced foundation (taking the soil characteristics into account), special technologies (for example, using a steel frame to increase rigidity) and mandatory approval from the local architecture and urban planning authorities. In conditions of strong winds, greater height requires a more complex and costly solution.
Important! Astana often has difficult soils (subsiding soils, saline soils). Before construction begins, geological surveys must be carried out to determine the bearing capacity of the soil and choose the optimal type of foundation (piles, slab, strip foundation taking the freezing depth into account).










































































