PROFI-DOM — construction company +7 (708) 111-50-40
ENRUKZ

Gas block house construction in Almaty


and the region from 45 000 ₸*/m² in 2 months*Crew labour cost
calculate the construction cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

  • 200+ successfully completed projects
  • Online broadcast of the construction progress 24/7*
  • Extended warranty from 5 years
  • 100% compliance with current
    standards: SNiP, SP, GOST

Gas block house construction in Almaty

and the region

from 45 000 ₸*/m²

*Crew labour cost

in 2 months

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

Gas block house construction in Almaty

and the region

in 2 months

from 45 000 ₸*/m²

*Crew labour cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

Features of building gas block houses

Aerated concrete blocks are a modern cellular building material based on cement, lime, sand, aluminium powder and water.

It is widely used in Almaty to build energy-efficient houses using monolithic technology.

Features of building gas block houses

Aerated concrete blocks are a modern cellular building material based on cement, lime, sand, aluminium powder and water.

It is widely used in Almaty to build energy-efficient houses using monolithic technology.

Features of building gas block houses

Aerated concrete blocks are a modern cellular building material based on cement, lime, sand, aluminium powder and water. They are widely used in Almaty to build energy-efficient houses using monolithic technology.

Advantages of building gas block houses

Service life from 50 years

Thanks to its resistance to fluctuations in temperature and humidity and the geometric stability of the building. The average service life is 50-100 years.

7+-point seismic resistance

Thanks to compliance with the construction requirements and the choice of materials, a gas block house can withstand earthquakes of up to 7 points.

Energy
efficiency

Thanks to its cellular structure, its heat- and sound-insulating properties make it possible to cut heating costs by a factor of 2-3.

No seasonal restrictions on construction

Construction is carried out at any time of year.

Budget savings

Building a gas block house is 2 times cheaper than building from brick or timber.

Erected in 2 months

The building does not shrink, as no massive foundation is required, and turnkey construction takes only 2-3 months.

LEAVE A REQUESTWe will call you back within 3 minutes

Advantages of building gas block houses

Thanks to its resistance to fluctuations in temperature and humidity and the geometric stability of the building. The average service life is 50-100 years.

Service life from 50 years

Thanks to compliance with the construction requirements and the choice of materials, a gas block house can withstand earthquakes of up to 7 points.

7+-point seismic resistance

Thanks to its cellular structure, its heat- and sound-insulating properties make it possible to cut heating costs by a factor of 2-3.

Energy
efficiency

Construction is carried out at any time of year.

No seasonal restrictions on construction

Building a gas block house is 2 times cheaper than building from brick or timber.

Budget savings

The building does not shrink, as no massive foundation is required, and turnkey construction takes only 2-3 months.

Erected in 2 months

We will call you back within 3 minutes

Advantages of building gas block houses

Thanks to its resistance to fluctuations in temperature and humidity and the geometric stability of the building. The average service life is 50-100 years.

Service life from 50 years

Thanks to compliance with the construction requirements and the choice of materials, a gas block house can withstand earthquakes of up to 7 points.

7+-point seismic resistance

Thanks to its cellular structure, its heat- and sound-insulating properties make it possible to cut heating costs by a factor of 2-3.

Energy
efficiency

Construction is carried out at any time of year.

No seasonal restrictions on construction

Building a gas block house is 2 times cheaper than building from brick or timber.

Budget savings

The building does not shrink, as no massive foundation is required, and turnkey construction takes only 2-3 months.

Erected in 2 months

We will call you back within 3 minutes

Cost of building a gas block house

In various versions

CONSTRUCTION OPTIONCOST WITHOUT MATERIALSCOST WITH MATERIALSCONSTRUCTION TIME
Shellfrom 45 000 ₸/m²from 125 000 ₸/m²1 month
Pre-finishfrom 65 000 ₸/m²from 175 000 ₸/m²2 months
Finishedfrom 76 000 ₸/m²from 225 000 ₸/m²3 months
LEAVE A REQUESTWe will call you back within 3 minutes

List of works for different construction options

The price includes work and materials

SHELL VERSION

Site preparation (marking out the building's setting-out points, preparing the soil base for the cushion or trenches for the strip foundation, installing formwork)

Reinforcing the foundation base with rebar

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Backfilling the foundation strip with sand-gravel mix and then compacting it

Reinforcement of the rough screed for the strip foundation

Pouring the rough screed with concrete

Installation of columns

Installation of girders

Installation and infill of the first-floor walls

Installation of internal partitions on the first floor

Installation of the inter-floor slab (if 2 or more storeys)

Installation of interior partitions

Installing the staircase (if 2 or more storeys)

Assembly of the attic rafter system

⁠Roof installation

depending on the type and height of the foundation, the ceiling height, the floors and the roofing used

from 115 000 KZT/m2

Finished package

All the work and materials from the shell package

⁠Installation of 4--chamber windows

Installing the entrance door

Installation of attic-floor insulation (in three layers of 50 mm, density 40)

Facade work

Insulating the walls and columns (with mineral wool and Penoplex)

Facade installation (decorative plaster)

Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)

Installing plumbing (laying pipes, outlets for plumbing connections)

Installation of the heating system (installation of the heating system, either radiators or underfloor heating)

Rough plastering of the walls

Finish plastering of the walls

Wall painting

Pouring the finish screed to level the floor

Installation of stretch ceilings

Installing the finished floors (class 32 laminate or linoleum, your choice)

Installing sockets and switches

Installing interior doors

depending on the type and height of the foundation, the ceiling height, the floors and the roofing used

from 210 000 KZT/m2

List of works for different construction options

The price includes work and materials

shell versionfinished package

Site preparation (marking out the building's setting-out points, preparing the soil base for the cushion or trenches for the strip foundation, installing formwork)

Reinforcing the foundation base with rebar

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Backfilling the foundation strip with sand-gravel mix and then compacting it

Reinforcement of the rough screed for the strip foundation

Pouring the rough screed with concrete

Installation of columns

Installation of girders

Installation and infill of the first-floor walls

Installation of internal partitions on the first floor

Installation of the inter-floor slab (if 2 or more storeys)

Installation of interior partitions

Installing the staircase (if 2 or more storeys)

⁠Assembly of the attic rafter system

Roof installation

depending on the type and height of the foundation, the ceiling height, the floors and the roofing used

from 115 000 KZT/m2

List of works for different construction options

The price includes work and materials

shell versionfinished package

depending on the type and height of the foundation, the ceiling height, the floors and the roofing used

Site preparation (marking out the building's setting-out points, preparing the soil base for the cushion or trenches for the strip foundation, installing formwork)

Reinforcing the foundation base with rebar

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Backfilling the foundation strip with sand-gravel mix and then compacting it

Reinforcement of the rough screed for the strip foundation

Pouring the rough screed with concrete

Installation of columns

Installation of girders

Installation and infill of the first-floor walls

Installation of internal partitions on the first floor

Installation of the inter-floor slab (if 2 or more storeys)

Installation of interior partitions

Installing the staircase (if 2 or more storeys)

⁠Assembly of the attic rafter system

Roof installation

from 115 000 KZT/m2

Answer 5 questions and get an estimate accurate to 95%

Find out the construction cost and timeframe in 1 minute

What type of house do you want to build?

What should the area of the house be?

Do you already have a house design, or does a new one need to be developed?

Do you already have a plot for building a house?

What type of roofing would you like?

WE HAVE RECEIVED YOUR DETAILS AND ARE STARTING THE CALCULATIONS!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    5-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    A temporary fence is put up for tidy storage and strict control of building materials

  8. 08.
    Online monitoring of work progress

    You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

catalogue of completed gas block house projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Number of bedrooms
Garage
Project No. 10Project No. 10
Floors: 2
House area: 138,9 m²
Building footprint: 168,48 m²
14 320 800kzt
VIEW PROJECT
Project No. 14Project No. 14
Floors: 1
House area: 96 m²
Building footprint: 96 m²
8 160 000kzt
VIEW PROJECT
Project No. 22Project No. 22
Floors: 2
House area: 152,3 m²
Building footprint: 234,24 m²
19 910 400kzt
VIEW PROJECT
Project No. 16Project No. 16
Floors: 2
House area: 204 m²
Building footprint: 303,24 m²
25 775 400kzt
VIEW PROJECT

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40

Turnkey aerated concrete houses

These houses combine an affordable price, high thermal insulation properties and fire safety with average durability. Aerated concrete is the optimal material for building energy-efficient, economy-class houses.

The main construction stages identified by our specialists:

1. Design that accounts for the loads and the properties of aerated concrete.
2. Preparing the construction site and laying the foundation.
3. Erecting the walls with reinforcement.
4. Installing the floors and roof.
5. Sealing joints and junctions.
6. Installing windows, doors and utility connections.
7. Exterior and interior wall finishing.
8. Landscaping of the grounds.
Building the foundation
Building the foundation
Erecting the walls
Erecting the walls
Roof installation
Roof installation
Sealing joints
Sealing joints
Installing windows and doors
Installing windows and doors
Exterior wall finishing
Exterior wall finishing

Building the foundation

Erecting the walls

Roof installation

Sealing joints

Installing windows and doors

Exterior wall finishing

Building the foundation

Erecting the walls

Roof installation

Sealing joints

Installing windows and doors

Exterior wall finishing

Design

When you order the "aerated concrete house construction" service, our designers take into account the limit on the number of storeys – no more than 3-4 storeys, calculate the reinforcement of the walls with rebar in areas of high load, provide sufficient wall ventilation for moisture to evaporate, work out the waterproofing, vapour-barrier and thermal-insulation system, take the high thermal conductivity into account when calculating heating, and provide anti-seismic measures in earthquake-prone zones.

Choosing gas blocks

The company's chief engineer's recommendations on choosing the grade and quality of blocks:

  • Density grade – from D300 to D700, the higher the stronger.
  • Geometric dimensions – the standard 625x200x375 mm or modular.
  • Factory-made or adobe blocks – factory-made ones are more uniform.
  • Availability of quality certificates and compliance with GOST standards.
The price for building gas block houses is 115-210 thousand KZT/m2 depending on the design and specification.

Foundation

For building aerated concrete structures, our company's specialists recommend the following types of foundation: monolithic strip – the classic option for load-bearing walls; monolithic slab – distributes the weight evenly; pile-strip – for weak soils with a high groundwater level.

The type and dimensions of the foundation are calculated based on the weight of the future structure, the engineering and geological surveys of the site and the expected loads.
Monolithic strip foundation
Monolithic strip foundation
Monolithic slab
Monolithic slab
Pile-strip
Pile-strip

Monolithic strip foundation

Monolithic slab

Pile-strip

Monolithic strip foundation

Monolithic slab

Pile-strip

Insulating a gas block house

Despite the high thermal insulation properties of gas blocks, additional insulation is required: for the floor – insulation is laid between the joists; for the roof – insulation is laid between the rafters; for the facades – hanging ventilated facade systems; a vapour-barrier layer – prevents condensation from forming.

Proper insulation will help avoid "cold bridges" and ensure an optimal microclimate inside the house.

Finishing

For finishing an aerated concrete house, we offer a choice of the following materials: for facades — ventilated facades, plasters and cladding materials; for interior finishing — plasterboard, plaster, wallpaper and laminate.

assembly of aerated concrete houses

We assemble gas block houses in several main stages:

1. Laying the first course of blocks on the prepared foundation.
2. Laying the walls, with reinforcement every 5-6 courses using tie wire or mesh.
3. Installing the floors and the rafter system.
4. Sealing all joints and seams with special sealants.
5. Plastering or cladding the facades with finishing materials.

The assembly is characterised by a high speed of work, but requires adherence to technologies to ensure strength and durability.
After the assembly is completed, the utility systems are commissioned, the interior is finished and the grounds are landscaped.

Engineering systems

A gas block house is equipped with the following utility systems: power supply: wiring, panels, sockets, switches; water supply and sewerage: pipelines, treatment systems; heating: gas, electric and solid-fuel boilers; ventilation: natural or supply-and-exhaust with heat recovery units.

The utilities are laid and installed before the interior finishing.
Power supply
Power supply
Water supply and sewerage
Water supply and sewerage
Heating
Heating
Ventilation
Ventilation

Power supply

Water supply and sewerage

Heating

Ventilation

Power supply

Water supply and sewerage

Heating

Ventilation

Fire resistance

Aerated concrete blocks have high fire safety and belong to the non-combustible NG class of materials. However, to improve fire resistance we take the following measures:

  • Reinforcing the walls with steel rebar to increase strength.
  • Installation of firebreaks made of non-combustible materials.
  • Cladding with non-combustible facade systems with an air gap.
  • Treating the structures with fire-and-bioprotective compounds.
  • Installation of fire alarm and warning systems.
  • Observance of fire safety gaps between buildings.
Depending on the measures applied, aerated concrete houses can reach fire resistance limits from EI 30 to EI 180.

Soundproofing

Thanks to their cellular structure, gas blocks have good soundproofing properties. The sound absorption coefficient of aerated concrete is around 0,7. To improve sound insulation, the following methods are used: cladding with 2-3 layers of plasterboard with an air gap, the construction of double partitions with sound-absorbing material inside, coating the walls with special soundproofing plasters, and installing soundproof doors and windows in the openings.

Thus, building a house from aerated silicate blocks is the optimal choice for creating energy-efficient and fire-safe housing on a limited budget. One need only follow the technologies and the rules for using this material.

Reinforcement of structures

Because of their low tensile strength, the walls require reinforcement to give them rigidity and resistance to vertical and horizontal loads. The following reinforcement methods are used: galvanised steel masonry mesh every 5-6 courses of masonry, horizontal and vertical reinforcement with anchors in areas of high load, and reinforcing cages and ring beams to strengthen the piers and lintels, as well as reinforced concrete belts and columns in the plinth section of the house.

The reinforcement design is developed depending on the characteristics of the gas blocks, the number of storeys and the wind and seismic loads.

Seismic resistance

Aerated concrete houses cope poorly with seismic loads because the material is relatively brittle and has low strength. To ensure seismic resistance, the following measures are applied:

  • Reinforcing the walls with steel rebar at increased density.
  • Installation of reinforced concrete belts, lintels and posts around the entire perimeter.
  • Construction of a highly rigid reinforced strip foundation.
  • Compliance with standards on the permissible height of buildings and the use of lightweight floors.
  • A hinged connection of the walls to the floors to prevent their collapse.

When these measures are observed, our company's specialists build gas block houses in areas with seismicity of up to 7 points.
Customer reviews of our work

Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!
Phone:+7 (708) 111-50-40Our address:Almaty, Timiryazev St., 42 bldg 10a, office 2; floor 3Daily: 9:00–21:00 (by appointment)
WhatsApp