PROFI-DOM — construction company +7 (701) 944-47-70
ENRUKZ

Design of industrial buildings

In 7 days
with 100% compliance SNiP and GOST standards
calculate the cost of the project

We design industrial buildings with a focus on functionality, logistics and rapid delivery

  • 200+ successfully completed projects
  • Full support until the permits are obtained
  • A team of engineers with 10+ years of experience
  • 100% compliance with current standards: SNiP, SP, GOST

Design of industrial buildings

In 7 days

with 100% compliance

SNiP and GOST standards

We design industrial buildings with a focus on functionality, logistics and rapid delivery

Full support until the permits are obtained

200+ successfully completed projects

100% compliance with current standards: SNiP, SP, GOST

A team of engineers with 10+ years of experience

Design of industrial buildings

In 7 days

with 100% compliance

SNiP and GOST standards

We design industrial buildings with a focus on functionality, logistics and rapid delivery

200+ successfully completed projects

A team of engineers with 10+ years of experience

Full support until the permits are obtained

100% compliance with current standards: SNiP, SP, GOST

Find out the cost of designing an industrial building by answering 6 questions

Completion time 3 minutes

What type of industrial building do you plan to build?

What area should the building be?

How many storeys will your building have?

What materials do you plan to build the building from?

What level of project are you interested in?

When do you plan to start construction?

WE HAVE RECEIVED YOUR DETAILS AND ARE STARTING THE CALCULATIONS!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

Why 98% residents of Kazakhstan order industrial building designs from us

Our advantages

BUDGET SAVINGS

We create designs that save money during construction without compromising quality.

A DESIGN IN 7 DAYS

A well-coordinated design process allows it to be developed in 7-30 days.

HELP WITH PAPERWORK

We will help settle all the paperwork involved in the building permit and the preparation of documents.

WORK STRICTLY TO STANDARDS

All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility.

ENGINEERS WITH 10+ YEARS OF EXPERIENCE

Our staff includes architects and engineers who hold permits to work in earthquake-prone zones.

BUILDING DESIGNS WITH 9+-POINT SEISMIC RESISTANCE

We use modern design technologies with a focus on seismic resistance.

LEAVE A REQUESTWe will call you back within 3 minutes

Why 98% residents of Kazakhstan order industrial building designs from us

Our advantages

We create designs that save money during construction without compromising quality.

BUDGET SAVINGS

A well-coordinated design process allows it to be developed in 7-30 days.

A DESIGN IN 7 DAYS

We will help settle all the paperwork involved in the building permit and the preparation of documents.

HELP WITH PAPERWORK

All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility.

WORK STRICTLY TO STANDARDS

Our staff includes architects and engineers who hold permits to work in earthquake-prone zones.

ENGINEERS WITH 10+ YEARS OF EXPERIENCE

We use modern design technologies with a focus on seismic resistance.

BUILDING DESIGNS WITH 9+-POINT SEISMIC RESISTANCE

We will call you back within 3 minutes

Why 98% residents of Kazakhstan order industrial building designs from us

Our advantages

We create designs that save money during construction without compromising quality.

BUDGET SAVINGS

A well-coordinated design process allows it to be developed in 7-30 days.

A DESIGN IN 7 DAYS

We will help settle all the paperwork involved in the building permit and the preparation of documents.

HELP WITH PAPERWORK

All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility.

WORK STRICTLY TO STANDARDS

Our staff includes architects and engineers who hold permits to work in earthquake-prone zones.

ENGINEERS WITH 10+ YEARS OF EXPERIENCE

We use modern design technologies with a focus on seismic resistance.

BUILDING DESIGNS WITH 9+-POINT SEISMIC RESISTANCE

We will call you back within 3 minutes

catalogue of completed industrial building projects

The price is given for developing the design

Area
Number of floors
Dimensions
Project No. 629Project No. 629
Floors: 4
Total area: 2421 m²
Building footprint: 1920 m²
181 575 000kzt
VIEW PROJECT
Project No. 631Project No. 631
Floors: 2
Total area: 3300 m²
Building footprint: 2397 m²
247 500 000kzt
VIEW PROJECT
Project No. 632Project No. 632
Floors: 1
Total area: 13 824 m²
Building footprint: 13 824 m²
1 036 800 000kzt
VIEW PROJECT
Project No. 633Project No. 633
Floors: 1
Total area: 580 m²
Building footprint: 420 m²
43 500 000kzt
VIEW PROJECT

developing a custom design

LEAVE A REQUEST

We will call you back within 3 minutes

7 - 30

is the average duration of project development

Up to

development project concepts

an unlimited number of revisions to the design

5

options

days

developing a custom design

7 - 30

is the average duration of project development

an unlimited number of revisions to the design

Up to

development project concepts

5

options

days

LEAVE A REQUEST

We will call you back within 3 minutes

developing a custom design

is the average duration of project development

development project concepts

an unlimited number of revisions to the design

Up to

7 - 30

5

options

days

We will call you back within 3 minutes

functional zones

We shape the layout solutions and the set of rooms, and define the functional zones

Floor plans

At this stage, the architect creates step-by-step plans of the building with dimensions and furniture arrangement

01.

03.

siting the building on the plot

At this stage, the architect positions the future building in accordance with all codes and regulations

layout in 3D

Created for those who find it easier to perceive space in a three-dimensional representation

02.

04.

Project in cross-section

On such a plan you can see the location of the building's elements. This will help determine the layout

3D panorama visualisation

Created for those who find it easier to perceive space in a three-dimensional representation

05.

07.

building facades

This stage is needed for carrying out the work quickly and obtaining the permits to implement the project

explanatory note

Needed to clarify important points and present the overall picture of the development

06.

08.

the building's foundation

Foundation design is necessary to protect the building from subsidence, cracks and so on

final specification

All work and the final documentation must be approved by the client

09.

11.

working drawings and details

At this stage, working drawings of all the building's structures are provided

utility networks

They constitute the life support system of a building or structure

10.

12.

LEAVE A REQUEST

We will call you back within 3 minutes

functional zones

We shape the layout solutions and the set of rooms, and define the functional zones

01.

siting the building on the plot

At this stage, the architect positions the future building in accordance with all codes and regulations

02.

Project in cross-section

On such a plan you can see the location of the building's elements. This will help determine the layout

05.

building facades

This stage is needed for carrying out the work quickly and obtaining the permits to implement the project

06.

the building's foundation

Foundation design is necessary to protect the building from subsidence, cracks and so on

09.

working drawings and details

At this stage, working drawings of all the building's structures are provided

10.

Floor plans

At this stage, the architect creates step-by-step plans of the building with dimensions and furniture arrangement

03.

layout in 3D

Created for those who find it easier to perceive space in a three-dimensional representation

04.

3D panorama visualisation

Created for those who find it easier to perceive space in a three-dimensional representation

07.

explanatory note

Needed to clarify important points and present the overall picture of the development

08.

final specification

All work and the final documentation must be approved by the client

11.

utility networks

They constitute the life support system of a building or structure

12.

LEAVE A REQUEST

We will call you back within 3 minutes

functional zones

We shape the layout solutions and the set of rooms, and define the functional zones

01.

siting the building on the plot

At this stage, the architect positions the future building in accordance with all codes and regulations

02.

Floor plans

At this stage, the architect creates step-by-step plans of the building with dimensions and furniture arrangement

03.

layout in 3D

Created for those who find it easier to perceive space in a three-dimensional representation

04.

Project in cross-section

On such a plan you can see the location of the building's elements. This will help determine the layout

05.

building facades

This stage is needed for carrying out the work quickly and obtaining the permits to implement the project

06.

3D panorama visualisation

Created for those who find it easier to perceive space in a three-dimensional representation

07.

explanatory note

Needed to clarify important points and present the overall picture of the development

08.

the building's foundation

Foundation design is necessary to protect the building from subsidence, cracks and so on

09.

working drawings and details

At this stage, working drawings of all the building's structures are provided

10.

final specification

All work and the final documentation must be approved by the client

11.

utility networks

They constitute the life support system of a residential building or structure

12.

We will call you back within 3 minutes

what a full industrial building design includes

concept design

It gives an idea of the details, structural features, dimensions and appearance of the building. It is the first stage of architectural design, making it possible to determine the style and appearance of the future building, its size, shape, spatial and layout solutions, as well as the internal layout and zoning.

working design

This is the stage after the concept design, where all aspects of the design are worked out in detail. It includes all the working drawings, architectural and urban planning indicators, technical data, material schedules, estimates and the work schedule. It provides the detailed information needed to build or renovate the building.

Engineering (technical) design

Designing solutions that make the building's sewerage and water supply systems, ventilation, power supply, heating and other utilities convenient to operate.

Technical support

Help with obtaining the building permit and getting the documents approved. This is one of the most important stages.

LEAVE A REQUESTWe will call you back within 3 minutes

what a full industrial building design includes

It gives an idea of the details, structural features, dimensions and appearance of the building. It is the first stage of architectural design, making it possible to determine the style and appearance of the future building, its size, shape, spatial and layout solutions, as well as the internal layout and zoning.

Learn more

concept design

This is the stage after the concept design, where all aspects of the design are worked out in detail. It includes all the working drawings, architectural and urban planning indicators, technical data, material schedules, estimates and the work schedule. It provides the detailed information needed to build or renovate the building.

Learn more

working design

Designing solutions that make the building's sewerage and water supply systems, ventilation, power supply, heating and other utilities convenient to operate.

Learn more

Engineering (technical) design

Help with obtaining the building permit and getting the documents approved. This is one of the most important stages.

Technical support

We will call you back within 3 minutes

what a full industrial building design includes

It gives an idea of the details, structural features, dimensions and appearance of the building. It is the first stage of architectural design, making it possible to determine the style and appearance of the future building, its size, shape, spatial and layout solutions, as well as the internal layout and zoning.

Learn more

concept design

This is the stage after the concept design, where all aspects of the design are worked out in detail. It includes all the working drawings, architectural and urban planning indicators, technical data, material schedules, estimates and the work schedule. It provides the detailed information needed to build or renovate the building.

Learn more

working design

Designing solutions that make the building's sewerage and water supply systems, ventilation, power supply, heating and other utilities convenient to operate.

Learn more

Engineering (technical) design

Help with obtaining the building permit and getting the documents approved. This is one of the most important stages.

Technical support

We will call you back within 3 minutes

Develop a custom design for an industrial building

Leave a request and we will contact you within 5 minutes

+7

By clicking the button you agree to the terms of the Privacy Policy

Or call us at

+7 (701) 944-47-70

Develop a custom design for an industrial building

Leave a request and we will contact you within 5 minutes

+7

By clicking the button you agree to the terms of the Privacy Policy

Or call us at

+7 (701) 944-47-70

Develop a custom design for an industrial building

Leave a request and we will contact you within 5 minutes

+7

By clicking the button you agree to the terms of the Privacy Policy

Or call us at

+7 (701) 944-47-70

design of production buildings

Author: Daniyar Abylkasov, chief design engineer (CDE), expert in industrial facilities

For a business owner, building a new workshop is always a matter of millions and nerves. Many mistakenly consider the design of industrial buildings a formality, some kind of paperwork before the real work begins. In reality, a quality design is your main tool for managing the budget, deadlines and future operational efficiency. It turns the chaos of a construction site into a predictable, manageable process with a clear financial outcome. In this article, I, as a chief engineer with experience on projects in Almaty, will break down the entire process and honestly tell you about all the pitfalls.

Why design is an investment, not an expense

Saving on design is like buying a cheap parachute. The cost of an error becomes clear too late. Professional design of industrial buildings and structures helps avoid situations where incompatibility of utilities or insufficient capacity of electrical networks is discovered on site. Halting construction for rework costs many times more than the designer's services. A competent plan immediately identifies real savings by optimising material consumption and shortening construction time. It is not an expense item, but insurance against multi-million losses and a guarantee of bringing the facility to its planned targets.

Expert advice from Daniyar Abylkasov, chief design engineer: Never start even earthworks without a fully approved working design. Verbal agreements like “we'll chase that later” in practice result in colossal costs. Any change on the construction site must be recorded in the author's supervision log and, if necessary, in the design documentation.

The evolutionary path: from drafting board to digital twin

15-20 years ago, industrial building designs were created on drafting boards. Each drawing was a separate document, and coordinating sections between architects and engineers resembled a game of broken telephone. Collisions were often discovered on the construction site — for example, when a ventilation pipe according to the plan passed through a load-bearing beam. These mistakes had to be corrected on site, which increased costs and construction time. Later, attempts were made to use simple 3D visualisations, but they remained just pretty pictures without engineering data.

Modern design of industrial facilities is carried out in a BIM (Building Information Modeling) environment. Imagine not just a 3D model, but a single digital database where every element - a column, a pipe, a cable - has intelligence. The model knows its parameters: the grade of concrete, its cost, delivery time and power consumption. This approach elegantly solves the problems of its predecessors: the system automatically checks the models for collisions, and a change in one discipline is instantly reflected in all related ones. You receive not a stack of drawings, but a digital twin of the building, from which you can accurately calculate the estimate and simulate all future processes.

The heart of the project: the main sections of the design documentation

A complete industrial building design is not a single document but a set of interconnected sections. Each of them solves its own task, yet they all work as one organism.

  • Power supply (PS):
Power calculation is a puzzle. You need to add up the peak loads of all equipment, account for starting currents, lighting and heating. Underestimated capacity means constant outages and no room for expansion. Overestimated capacity means unjustified design costs and inflated technical conditions.

  • Ventilation and heating (HV):
In a workshop with welding stations and a paint booth, the ventilation system is a matter of safety and compliance with occupational health standards. We calculate the air exchange, select equipment capable of handling the specific process emissions, and integrate the solutions into the plant's overall infrastructure.

  • Water supply and sewerage (WS):
Production often requires process water for cooling or washing. We design networks taking into account the aggressiveness of effluents, which influences the choice of pipe materials. At the same time, special attention is paid to layout solutions that ensure the rational placement of all utility systems.

  • Automation (APCS):
Deep integration of automation systems makes it possible to control lighting, heating, ventilation and process equipment from a single panel, saving up to 30% of energy resources. Each section undergoes mandatory expert review, which guarantees that the design documentation meets all safety and efficiency requirements.

Expert advice from Daniyar Abylkasov, chief design engineer: The most common compromise between the desire to save money and future capabilities is the capacity of the electrical networks. Build a reserve of at least 25-30% into the design for expansion. Rerouting a cable at the design stage is 10 times cheaper than doing it after the building is handed over, tearing up finished floors.

Design of industrial premises: key technical solutions and their trade-offs

Choosing technologies is like assembling a construction kit: every solution has a downside. Frame type: precast concrete, steel frame or light-gauge steel framing — the main trade-off here lies between speed, price and durability. An important role is also played by the placement of equipment, which determines the logistics inside the building, staff safety and the efficiency of production processes.

Comparison of frame types for production buildings

Parameter

Metal frame

Reinforced concrete frame (RC products)

LGSF (Light gauge steel framing)

Speed of construction

High

Low

Very high

Cost

Medium

High

Low

Durability

High (with quality corrosion protection)

Very high

Medium

Layout flexibility

High

Low

High

Fire resistance

Medium (requires treatment)

High

Low

Best use

Medium and large workshops, warehouses, administrative and amenity buildings

Multi-storey production buildings, facilities with aggressive environments

Prefabricated warehouses, small workshops, superstructures


The design of an industrial building always begins with the choice of a structural system. By choosing a steel frame for speed and flexibility, you inevitably build into the budget the cost of high-quality fire protection and anti-corrosion treatment. The flip side of the budget-friendly LGSF is its limitations on load capacity and durability in the conditions of certain industries. Reinforced concrete is reliable and strong, but its high cost and long installation times often become the decisive argument against it.

Common mistakes when choosing a design contractor

The main mistake is choosing by the lowest price. Industrial building design is not a market where people haggle. A low price almost always means simplified calculations, the use of outdated standard solutions and a lack of attention to detail. The second mistake is underestimating the Technical Specification. Without a detailed TS, the designer works in a vacuum. The third is refusing author's supervision. Only author's supervision guarantees that the builders bring to life exactly what is specified in your industrial building design.

Workshop design: from an engineering task to economic success

Designing an industrial building is a complex, multi-level process where engineering meets economics. It is not paperwork, but the creation of a strategic asset for your business. A properly designed workshop in Almaty starts generating profit from day one, saving your resources at every stage of its life cycle.

It is important to consider not only new construction but also the reconstruction of existing facilities, which allows production to be modernised without stopping operations. By approaching the matter systematically and choosing experts who understand not only the standards but also the specifics of your production, you lay the foundation for a stable and thriving enterprise.
CUSTOMER REVIEWS of our projects

Your feedback matters a great deal to us

5.0
based on 13 reviews
5★
13
4★
0
3★
0
2★
0
1★
0
Sort by:
AZ
Amina Zhaksylykova
25 Jun 2026
Qyzmet körsetu deñgeyi zhaksy. Zhobalau tez, esepter düris. Bärin tüsindirip berdi, rahmet!
AB
Aidos Bekenov
22 Jun 2026
We came on the advice of acquaintances. We needed a design for a car wash. Everything was handled clearly and approved quickly. The only thing — a couple of small details in the drawings had to be redone, but after that everything fit together perfectly.
GN
Gaukhar Nurtayeva
19 Jun 2026
To be honest, I had doubts at first. There are so many offers online you cannot tell who is any good. But I really liked the approach here: no pressure, everything explained in plain language. Suleiman is really easy to talk to, a down-to-earth guy.

Frequently asked questions about designing industrial facilities

Does the design of an industrial building need to be approved?
Yes, a building design must be approved by a number of bodies,
such as the architectural and construction inspectorate, the
state construction supervision service, the fire supervision
service and the sanitary and epidemiological service.
What stages does the design of an industrial building include?
  • Technical specification and pre-design study
  • Concept design (optional)
  • Architectural and structural sections (AR, KR)
  • Utility networks (HV, WS, EL and others)
  • Approvals and expert review (if required)
Can the design be adapted to my plot?
Yes, we take into account the geology, terrain and specific features of the plot in Almaty or the region.
We will also advise on the optimal orientation of the building and access roads.
Which regulatory documents are applied in design?
The design is carried out in accordance with the current SNiP, SP, GOST, sanitary and fire safety standards, as well as industry requirements for utility systems, ventilation, loads and occupational safety.
Can an existing industrial building be modernised?
Yes. We carry out the reconstruction and re-planning of existing facilities — we analyse the load-bearing structures, develop new engineering schemes and adapt buildings to modern requirements.
What is needed to start designing an industrial building?
To start, the following is required:
  • technical specification,
  • information about the plot and utility networks,
  • requirements for production processes,
  • initial permit documentation (GPZU, topographic survey, etc.).
After that, the architects begin creating the concept and preliminary design.
Phone:+7 (701) 944-47-70Our address:Almaty, Makataev St., 47, office 325 (Partner Business Centre)Daily: 9:00–21:00 (by appointment)