PROFI-DOM — construction company +7 (708) 111-50-40
ENRUKZ

frame houses in Almaty

and the region
from 250 000 ₸*/m² in 2 months
calculate the construction cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

  • 200+ successfully completed projects
  • Online broadcast of the construction progress 24/7*
  • Extended warranty from 5 years
  • 100% compliance with current
    standards: SNiP, SP, GOST

frame houses in Almaty

and the region

in 2 months

from 250 000 ₸*/m²

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

frame houses in Almaty

and the region

in 2 months

from 250 000 ₸*/m²

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

Structural features of frame houses

Frame technology is one of the fastest and most economical ways to build residential and utility structures.

The walls, floors and roof are formed from a sturdy wooden or metal frame clad outside and inside with sheet materials.

Structural features of frame houses

Frame technology is one of the fastest and most economical ways to build residential and utility structures.

The walls, floors and roof are formed from a sturdy wooden or metal frame clad outside and inside with sheet materials.

Structural features of frame houses

Frame technology is one of the fastest and most economical ways to build residential and utility structures. The walls, floors and roof are formed from a sturdy wooden or metal frame sheathed on the outside and inside with sheet materials.

Advantages of building frame houses

100% Strength and stability

The structure's properties allow buildings to be erected even on mountain slopes

9+-point seismic resistance

The frame's integral structure allows the building to withstand significant movements of the earth's crust.

Energy
efficiency

The heat-retaining properties of the panels used to clad the frame cut heating costs by 3 times.

100% ECO-FRIENDLINESS

The panels for sheathing the frame contain no harmful components or dust.

Budget savings

Building a frame house is 2 times cheaper than building one of brick or timber, with no costs for the foundation or for renting special machinery.

Erected in 2 months

The building does not undergo shrinkage, so turnkey construction takes just 2-3 months.

LEAVE A REQUESTWe will call you back within 3 minutes

Advantages of building frame houses

The structure's properties allow buildings to be erected even on mountain slopes

100% Strength and stability

The frame's integral structure allows the building to withstand significant movements of the earth's crust.

9+-point seismic resistance

The heat-retaining properties of the panels used to clad the frame cut heating costs by 3 times.

Energy
efficiency

The panels for sheathing the frame contain no harmful components or dust.

100% ECO-FRIENDLINESS

Building a frame house is 2 times cheaper than building one of brick or timber, with no costs for the foundation or for renting special machinery.

Budget savings

The building does not undergo shrinkage, so turnkey construction takes just 2-3 months.

Erected in 2 months

We will call you back within 3 minutes

Advantages of building frame houses

The structure's properties allow buildings to be erected even on mountain slopes

100% Strength and stability

The frame's integral structure allows the building to withstand significant movements of the earth's crust.

9+-point seismic resistance

The heat-retaining properties of the panels used to clad the frame cut heating costs by 3 times.

Energy
efficiency

The panels for sheathing the frame contain no harmful components or dust.

100% ECO-FRIENDLINESS

Building a frame house is 2 times cheaper than building one of brick or timber, with no costs for the foundation or for renting special machinery.

Budget savings

The building does not undergo shrinkage, so turnkey construction takes just 2-3 months.

Erected in 2 months

We will call you back within 3 minutes

Cost of building a frame house

FLOOR AREAFINAL FINISHINGCONSTRUCTION TIME
Up to 45 m²from 250 000 ₸/m²20-25 days
From 45 m²from 250 000 ₸/m²30 days
From 95 m²from 250 000 ₸/m²45-60 days
PRE-FINISHFINISHEDBUILD TIME
-from 92 000 ₸/m²2-3 months
Cost of work with materials per 1 m²

FLOOR AREA

SHELL

FINISHED

BUILD TIME

Up to 45 m2

From 45 to 95 m2

From 95 m2

from 95 000 ₸

from 85 000 ₸

from 90 000 ₸

from 185 000 ₸

from 180 000 ₸

from 170 000 ₸

30 days

30 days

30 days

Cost of work with materials per 1 m²

FLOOR AREA

SHELL

FINISHED

BUILD TIME

Up to 45 m2

From 45 to 95 m2

From 95 m2

from 95 000 ₸

from 85 000 ₸

from 90 000 ₸

from 185 000 ₸

from 180 000 ₸

from 170 000 ₸

30 days

30 days

30 days

LEAVE A REQUESTWe will call you back within 3 minutes

List of works for different construction options

The price includes work and materials

All the work and materials from the shell package

⁠Installing 2--chamber windows

Installing the entrance door

⁠Facade installation (soft roofing, corrugated sheet, metal siding)

Installing the electrical wiring (laying the electrical cable in corrugated conduit, installing the connection points)

Installing plumbing (laying pipes, outlets for plumbing connections)

Installing the heating system (radiators or underfloor heating)

Installing and sheathing the interior walls with acoustic mineral wool in two layers

Installing the substructure for drywall

Plasterboard installation

⁠Pouring the finish screed to level the floor

Filling the plasterboard walls

Cladding the walls and ceilings with timber lining

Installing the finished floors (class 32 laminate or linoleum, your choice)

Installing sockets and switches

Installing interior doors

Finished package

from 250 000 KZT/m2

List of works for different construction options

The price includes work and materials

List of works for different construction options

The price includes work and materials

Answer 5 questions and get an estimate accurate to 95%

Find out the construction cost and timeframe in 1 minute

What type of house do you want to build?

What should the area of the house be?

Do you already have a house design, or does a new one need to be developed?

Do you already have a plot for building a house?

What type of roofing would you like?

WE HAVE RECEIVED YOUR DETAILS AND ARE STARTING THE CALCULATIONS!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 5 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    3-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    We ensure tidy storage and strict control of building materials

  8. 08.
    monitoring of work progress

    You can watch the construction at any time by visiting the site in person

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

catalogue of completed frame house projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Number of bedrooms
Garage
Project No. 3Project No. 3
Floors: 1
House area: 92 m²
Building footprint: 92 m²
8 280 000kzt
VIEW PROJECT
Project No. 17Project No. 17
Floors: 1+ + attic
House area: 129 m²
Building footprint: 120 m²
10 200 000kzt
VIEW PROJECT
Project No. 9Project No. 9
Floors: 2
House area: 227 m²
Building footprint: 312 m²
26 520 000kzt
VIEW PROJECT
Project No. 12Project No. 12
Floors: 1+ + attic
House area: 53,9 m²
Building footprint: 90 m²
8 100 000kzt
VIEW PROJECT
Project No. 36Project No. 36
Floors: 1
House area: 93 m²
Building footprint: 143 m²
12 155 000kzt
VIEW PROJECT
Project No. 35Project No. 35
Floors: 2
House area: 98 m²
Building footprint: 126 m²
10 710 000kzt
VIEW PROJECT
Project No. 37Project No. 37
Floors: 1
House area: 80 m²
Building footprint: 94,4 m²
8 496 000kzt
VIEW PROJECT
Project No. 38Project No. 38
Floors: 2
House area: 86 m²
Building footprint: 96 m²
8 160 000kzt
VIEW PROJECT
4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40

turnkey frame houses in Almaty

Main stages of construction:

1. Designing the house with loads taken into account
2. Preparing the construction site
3. Laying the foundation - a monolithic slab or piles
4. Installation of the base - the sill beams
5. Assembling the wall frame
6. Installation of the floor structures between storeys
7. Installing the roof rafter system
8. Sheathing the frame inside and out
9. Laying the utility networks
10. Insulation, vapour barrier and facade finishing
11. Final interior finishing of the rooms
12. Landscaping of the grounds

The frame of a prefabricated house

Frame houses are built from timber (most often edged softwood boards) or galvanised metal profiles. The sill beams rest on a concrete base. Next, the vertical posts, horizontal plates and rafter system are assembled. The rigidity and strength of the connections are important.

The exterior sheathing is fixed to the frame with a gap for ventilation and a waterproofing layer. Inside, the walls are clad with vapour- and heat-insulating materials and finish boards. The floor structures between storeys and the roof are also additionally insulated.
Assembling the vertical posts
Assembling the vertical posts
Wall insulation
Wall insulation

Assembling the vertical posts

Wall insulation

Assembling the vertical posts

Wall insulation

Key requirements for the frames

Strength and resistance to loads, strict adherence to the vertical and horizontal, reliable fastening joints and profile connections, and wood-protection treatment against rot and insects.

Popular materials for building frame houses in Almaty

For the frame - timber, edged board, glued laminated timber, metal profile; insulation - mineral wool, polystyrene; for the vapour barrier - films, membranes; for the exterior sheathing - cement-bonded particle board, OSB, siding, metal profile; for the interior sheathing - plasterboard, gypsum-fibre boards.

There are various ways to combine these materials depending on the region, the requirements involved and the budget. It is important to follow the manufacturers' requirements and the standards when choosing.

The wall structure of a prefabricated house

A typical wall consists of the following layers: exterior cladding (siding, ventilated facade, etc.), a moisture barrier (waterproofing membrane), a ventilation gap and counter-battens, outer sheathing (OSB, cement-bonded particle board), insulation (mineral wool, polystyrene foam), a vapour barrier (film, membrane) and interior cladding (plasterboard).

This "layer cake" provides reliable protection against moisture, wind and cold while keeping the walls breathable.

Engineering systems

A frame house is provided with all the necessary utility systems: power supply (wiring, distribution boards, sockets), water supply and sewerage (individual or central), a heating system (boilers, radiators), ventilation with supply valves and an extractor, and air conditioning (if required).

The utilities are laid after the frame is assembled and before the sheathing and interior finishing. It is important to take into account the requirements for routing pipes and ventilation ducts.

Advantages

Compared with a brick or wooden house, assembling a frame structure is simpler and faster:

  • Assembled from ready-made frame elements, which is why a frame house has a low price
  • The low weight makes transport and installation easier
  • High factory precision in manufacturing the parts
  • Can be assembled at any time of year
  • Lower requirements for workers' qualifications

Using this technology saves on labour costs and allows a warm, sturdy building to be erected quickly.

The case for prefabricated house building

Frame construction is in demand primarily for building budget low-rise housing, country houses and cottages for seasonal living, retail and office buildings, warehouses and other facilities, and auxiliary and utility structures.

Thus, frame technology makes it possible to quickly erect simple, inexpensive buildings with good thermal insulation, suitable for temporary or auxiliary use. With the right approach, frame houses can be used safely for a long time.

The prefabricated house building technology has a number of advantages:

  • Speed of construction - just 2-4 months from start to finish
  • Low cost of materials and work compared with permanent construction
  • The low weight of the structures does not require a massive foundation
  • High thermal and sound insulation thanks to the multi-layer sandwich construction
  • Resistance to seismic and wind loads, with no cracking
Budget low-rise house
Budget low-rise house
Country house
Country house
Warehouse
Warehouse
Utility building
Utility building

Budget low-rise house

Country house

Warehouse

Utility building

Budget low-rise house

Country house

Warehouse

Utility building

Prefabricated houses, the assembly technology

The lower sill beam is installed on the prepared foundation. Next, the vertical posts of the future walls are set up and fixed around the perimeter. The posts are connected by horizontal girders, forming a rigid spatial frame. The floors, rafter system and roof framing are assembled in the same way. The exterior is sheathed with sandwich panels or sheet materials with insulation. Interior finishing is carried out, along with the laying of utilities and ventilation ducts.

Precise geometry, a minimum of "wet" processes and the high factory readiness of the elements make it possible to carry out all the work quickly, even with a small number of workers.

Structural joints of the prefabricated house building system

The strength and durability of a prefabricated house depend on the quality of the main joints: connecting the plates and posts - with symmetrical angle brackets, couplings or studs; fixing the sheathing panels - with wood or metal screws into the plates; joining the walls to the floors and roof - with studs and anchors into the plates; door and window openings - double side posts reinforced with braces; ventilation ducts and utilities - along the posts without breaching the sheathing.

Compliance with technical regulations and manufacturers' instructions when assembling the joints is mandatory.

Popular varieties

The market offers various project options for frame houses in Almaty: "Canadian" — made of timber beams, "Finnish" — made of treated softwood boards, Metal — made of galvanised steel profiles, "Slab" — made of sandwich panels with insulation.

Numerous manufacturers offer house kits ranging from budget to premium class. Custom design to unique specifications is also possible.

Choosing the right type of prefabricated house in line with the region's climate and the client's wishes ensures the best combination of price, quality, assembly time and performance characteristics.

Requirements for the materials

To build a durable and safe structure, it is important to choose the right materials with the appropriate quality certificates:

  • The timber (beams, boards) must be kiln-dried and treated with antiseptics.
  • Metal profiles - with a zinc anti-corrosion coating of no less than 275 g/m2.
  • OSB boards and plywood for the sheathing are moisture-resistant, with an emission class no lower than E1.
  • Mineral wool insulation - water-repellent and non-combustible.
  • Vapour barrier membranes and polyethylene films with increased strength.
  • For the final finishing - flame-retardant and environmentally friendly materials.

When assembling the structures, all joints and junctions must be carefully sealed to preserve the insulating properties.

Frame houses in Almaty, construction prospects

Thanks to significant cost savings, speed of construction and good performance qualities, frame technology is widely used as a budget method for building houses and cottages, for erecting temporary public and industrial structures, for setting up mobile prefabricated housing and dormitories, and as inexpensive buildings for retail, storage and so on.

Given the continuous improvement of technologies and materials, the range of applications for frame houses will steadily expand in the foreseeable future.

Comparison of frame types for building a prefabricated house

CRITERIONTIMBER FRAMEMETAL FRAME
Construction time2-3 months3-4 months
Service life50-80 years80-100 years
Seismic resistanceLowMedium
Durability50-80 years80-100 years
StrengthLowHigh
Fire resistanceLowHigh
Resistance to biological damageRequires treatmentRequires no treatment
Thermal conductivityLowHigh
CostLowMedium
Installation complexityLowMedium
Eco-friendlinessHighLow
AffordabilityHighMedium
Customer reviews of our work

Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!
Phone:+7 (708) 111-50-40Our address:Almaty, Forum shopping mall, floor 4Daily: 9:00–21:00 (by appointment)
WhatsApp