PROFI-DOM — construction company +7 (708) 111-50-40
ENRUKZ

Brick house construction in Almaty


and the region from 45 000 ₸*/m² in 3 months*Crew labour cost
calculate the construction cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

  • 200+ successfully completed projects
  • Online broadcast of the construction progress 24/7*
  • Extended warranty from 5 years
  • 100% compliance with current
    standards: SNiP, SP, GOST

Brick house construction in Almaty

and the region

from 45 000 ₸*/m²

*Crew labour cost

in 3 months

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

Brick house construction in Almaty

and the region

in 3 months

from 45 000 ₸*/m²

*Crew labour cost

Durable and safe houses thanks to high quality standards and oversight by engineering services at every stage of construction

200+ successfully completed projects

Online broadcast of the construction progress 24/7*

Extended warranty from 5 years

100% compliance with current
standards: SNiP, SP, GOST

Features of building brick houses

Brick is one of the oldest building materials, made from fired clay. It is a ceramic artificial stone of regular shape.

It is widely used in Almaty thanks to the availability of raw materials, the simplicity of production and its good performance characteristics.

Features of building brick houses

Brick is one of the oldest building materials, made from fired clay. It is a ceramic artificial stone of regular shape.

It is widely used in Almaty thanks to the availability of raw materials, the simplicity of production and its good performance characteristics.

Features of building brick houses

Brick is one of the oldest building materials, made from fired clay. It is a ceramic artificial stone of regular shape.

Advantages of building brick houses

Service life from 100 years

The durability of a brick house is due to the brick's resistance to external influences, a well-thought-out design and proper maintenance.

9+-point seismic resistance

Thanks to compliance with building requirements and the choice of materials, a brick house can withstand earthquakes of 9 points and above.

High fire resistance

Maximum fire resistance of class R360 compared with other materials. High temperatures do not cause damage to the building.

AESTHETIC APPEARANCE

A brick house has a natural beauty and needs no expensive finishing, allowing you to save on construction.

100% stability

Brick is unafraid of high humidity, sun and frost thanks to its low hygroscopicity, high strength, corrosion resistance and frost resistance.

100% sound insulation

The porous structure helps absorb sound waves. The pores in the brick act as traps for sound waves, making them reflect repeatedly.

LEAVE A REQUESTWe will call you back within 3 minutes

Advantages of building brick houses

The durability of a brick house is due to the brick's resistance to external influences, a well-thought-out design and proper maintenance.

Service life from 100 years

Thanks to compliance with building requirements and the choice of materials, a brick house can withstand earthquakes of 9 points and above.

9+-point seismic resistance

Brick is unafraid of high humidity, sun and frost thanks to its low hygroscopicity, high strength, corrosion resistance and frost resistance.

100%
stability

Maximum fire resistance of class R360 compared with other materials. High temperatures do not cause damage to the building.

High fire resistance

A brick house has a natural beauty and needs no expensive finishing, allowing you to save on construction.

AESTHETIC APPEARANCE

The porous structure helps absorb sound waves. The pores in the brick act as traps for sound waves, making them reflect repeatedly.

100% sound insulation

We will call you back within 3 minutes

Advantages of building brick houses

The durability of a brick house is due to the brick's resistance to external influences, a well-thought-out design and proper maintenance.

Service life from 100 years

Thanks to compliance with building requirements and the choice of materials, a brick house can withstand earthquakes of 9 points and above.

9+-point seismic resistance

Brick is unafraid of high humidity, sun and frost thanks to its low hygroscopicity, high strength, corrosion resistance and frost resistance.

100%
stability

Maximum fire resistance of class R360 compared with other materials. High temperatures do not cause damage to the building.

High fire resistance

A brick house has a natural beauty and needs no expensive finishing, allowing you to save on construction.

AESTHETIC APPEARANCE

The porous structure helps absorb sound waves. The pores in the brick act as traps for sound waves, making them reflect repeatedly.

100% sound insulation

We will call you back within 3 minutes

Cost of building a brick house

In various versions

CONSTRUCTION OPTIONPRICE WITHOUT MATERIALSPRICE WITH MATERIALSCONSTRUCTION TIME
Shellfrom 45 000 ₸/m²from 125 000 ₸/m²1-2 months
Pre-finishfrom 65 000 ₸/m²from 175 000 ₸/m²2-3 months
Finishedfrom 76 000 ₸/m²from 225 000 ₸/m²3-4 months
LEAVE A REQUESTWe will call you back within 3 minutes

List of works for different construction options

The price includes work and materials

SHELL VERSION

Site preparation (marking out the building's setting-out points, preparing the soil base for the cushion or trenches for the strip foundation, installing formwork)

Reinforcing the foundation base with rebar

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Backfilling the foundation strip with sand-gravel mix and then compacting it

Reinforcement of the rough screed for the strip foundation

Pouring the rough screed with concrete

Installation of columns

Installation of girders

Installation and infill of the first-floor walls

Installation of internal partitions on the first floor

Installation of the inter-floor slab (if 2 or more storeys)

Installation of interior partitions

Installing the staircase (if 2 or more storeys)

Assembly of the attic rafter system

⁠Roof installation

depending on the type and height of the foundation, the ceiling height, the floors and the roofing used

from 115 000 KZT/m2

Finished package

All the work and materials from the shell package

⁠Installation of 4--chamber windows

Installing the entrance door

Installation of attic-floor insulation (in three layers of 50 mm, density 40)

Facade work

Insulating the walls and columns (with mineral wool and Penoplex)

Facade installation (decorative plaster)

Installing the electrical wiring (laying the electrical cable in conduit, installing connection points)

Installing plumbing (laying pipes, outlets for plumbing connections)

Installation of the heating system (installation of the heating system, either radiators or underfloor heating)

Rough plastering of the walls

Finish plastering of the walls

Wall painting

Pouring the finish screed to level the floor

Installation of stretch ceilings

Installing the finished floors (class 32 laminate or linoleum, your choice)

Installing sockets and switches

Installing interior doors

depending on the type and height of the foundation, the ceiling height, the floors and the roofing used

from 210 000 KZT/m2

List of works for different construction options

The price includes work and materials

shell versionfinished package

Site preparation (marking out the building's setting-out points, preparing the soil base for the cushion or trenches for the strip foundation, installing formwork)

Reinforcing the foundation base with rebar

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Backfilling the foundation strip with sand-gravel mix and then compacting it

Reinforcement of the rough screed for the strip foundation

Pouring the rough screed with concrete

Installation of columns

Installation of girders

Installation and infill of the first-floor walls

Installation of internal partitions on the first floor

Installation of the inter-floor slab (if 2 or more storeys)

Installation of interior partitions

Installing the staircase (if 2 or more storeys)

⁠Assembly of the attic rafter system

Roof installation

depending on the type and height of the foundation, the ceiling height, the floors and the roofing used

from 115 000 KZT/m2

List of works for different construction options

The price includes work and materials

shell versionfinished package

depending on the type and height of the foundation, the ceiling height, the floors and the roofing used

Site preparation (marking out the building's setting-out points, preparing the soil base for the cushion or trenches for the strip foundation, installing formwork)

Reinforcing the foundation base with rebar

Pouring the foundation cushion or strip with vibration

Dismantling the formwork

Plumbing layout

Backfilling the foundation strip with sand-gravel mix and then compacting it

Reinforcement of the rough screed for the strip foundation

Pouring the rough screed with concrete

Installation of columns

Installation of girders

Installation and infill of the first-floor walls

Installation of internal partitions on the first floor

Installation of the inter-floor slab (if 2 or more storeys)

Installation of interior partitions

Installing the staircase (if 2 or more storeys)

⁠Assembly of the attic rafter system

Roof installation

from 115 000 KZT/m2

Answer 5 questions and get an estimate accurate to 95%

Find out the construction cost and timeframe in 1 minute

What type of house do you want to build?

What should the area of the house be?

Do you already have a house design, or does a new one need to be developed?

Do you already have a plot for building a house?

What type of roofing would you like?

WE HAVE RECEIVED YOUR DETAILS AND ARE STARTING THE CALCULATIONS!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    5-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    A temporary fence is put up for tidy storage and strict control of building materials

  8. 08.
    Online monitoring of work progress

    You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

catalogue of completed brick house projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Number of bedrooms
Garage
Project No. 33Project No. 33
Floors: 2
House area: 207 m²
Building footprint: 253 m²
21 505 000kzt
VIEW PROJECT
Project No. 230Project No. 230
Floors: 2
House area: 179,5 m²
Building footprint: 200,52 m²
15 039 000kzt
VIEW PROJECT
Project No. 231Project No. 231
Floors: 1+ + attic
House area: 334,23 m²
Building footprint: 477,735 m²
40 607 900kzt
VIEW PROJECT
Project No. 50Project No. 50
Floors: 1
House area: 195,3 m²
Building footprint: 181,7 m²
15 444 500kzt
VIEW PROJECT

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40
Privacy Policy

Develop a custom design for your house

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (708) 111-50-40

Turnkey brick houses

Types and characteristics of brick

Brick is one of the most popular materials for residential houses.

  • Ceramic: made from clay by firing. It has high strength, frost resistance and durability.
  • Sand-lime: made from a mix of lime and sand. It is less strong than ceramic brick but more affordable.
  • Hyper-pressed: made from a lime-cement mix with various pigments added. It has high strength, frost resistance and decorative appeal.
Ceramic brick
Ceramic brick
Hyper-pressed brick
Hyper-pressed brick
Sand-lime brick
Sand-lime brick

Ceramic brick

Hyper-pressed brick

Sand-lime brick

Ceramic brick

Hyper-pressed brick

Sand-lime brick

Choosing material options for building a brick house

It should be borne in mind that in a cold climate it is advisable to use ceramic brick with high frost resistance. For a multi-storey house, high-strength ceramic or hyper-pressed brick is recommended. And for a small building, sand-lime brick can be used.

Masonry mortar is used to bond the bricks together. Reinforcement is used to strengthen the masonry.

The price of a brick house depends on the building characteristics listed above and the quality of the materials.

Design considerations when ordering the "turnkey brick house construction" service:

Designing a brick house begins with choosing a site and analysing its characteristics. Engineering, geodetic and geological surveys are carried out. The features of the landscape, the soil composition and the presence of groundwater are studied. This is necessary for the correct design of the foundation.

The architectural and planning solution for the building is developed. The number of storeys, the number and purpose of the rooms and their layout are determined. The facades, sections, plans and 3D models are worked out. The best structural systems and the type of masonry are selected. The load-bearing structures are calculated.

Next, the detailed working documentation is developed. Drawings are prepared for the foundations, walls, floors, stairs and roof. The volumes of work and material requirements are calculated. A specification is drawn up for the brick, beams, reinforcement and so on.

Costing the construction of a brick house. Particular attention is paid to the thermal calculations of the enclosing structures and to ensuring the required temperature and humidity conditions in the rooms. Ventilation, heating, water supply and power supply systems are developed.

Foundation

The choice of foundation type depends on the weight of the house. Brick is a heavy material, so a strong base is required. It also depends on the soil type — this affects the bearing capacity and the depth of the foundation; on the presence of a basement — a basement increases the load on the base, so a more substantial foundation is needed; and on the groundwater level — a high water table calls for additional waterproofing measures.

The main types for building a brick house:

  • Strip: suitable for all soil types; it can be deep (below the frost line) or shallow (above the frost line).
  • Slab: the most reliable but also the most expensive option, suitable for heaving and weak soils.
  • Pile: used for difficult soils where other types are unsuitable.
Monolithic strip foundation
Monolithic strip foundation
Monolithic slab
Monolithic slab
Pile-strip
Pile-strip

Monolithic strip foundation

Monolithic slab

Pile-strip

Monolithic strip foundation

Monolithic slab

Pile-strip

Stages of building the foundation for a brick house

1. Marking out: the outline of the future foundation is marked on the site.
2. Earthworks: a pit or trench is dug.
3. Preparing the base: the bottom of the pit/trench is compacted and filled with a sand-and-gravel cushion.
4. Formwork: formwork is made from boards or plywood.
5. Reinforcement: a reinforcement cage is placed in the formwork.
6. Pouring the concrete: the concrete mix is poured into the formwork and vibrated to remove air bubbles.
7. Curing the concrete: the concrete must be covered and watered periodically for even hardening.
8. Waterproofing: once the concrete has gained strength, the foundation is waterproofed.

Building a brick house. The plinth in a brick house: functions and advantages

The plinth is the part that protrudes above ground level and serves as the transition from the foundation to the walls.

The plinth prevents melt and rainwater from penetrating the walls and foundation, reduces heat loss and gives the building a finished and attractive appearance.

Advantages of building a basement floor

It is resistant to weather and mechanical loads. It helps retain heat. The plinth can be faced with various materials, for example tiles, plaster or siding.

When building the plinth of a house, it is important to use quality brick: it must be frost-resistant and have a low level of water absorption. It is important to carry out the waterproofing correctly: the plinth must be protected from moisture ingress. The plinth should also be insulated: this will help reduce heat loss.

Building brick houses. Erecting the walls

After the foundation work is finished, the walls are marked out according to the design, and the brick, mortar, reinforcement, reinforcing mesh and guide beacons are prepared.

The first course is laid, with its horizontality and corners checked. The subsequent courses are laid with the joints bonded using one of the bonding patterns: single-row, multi-row, header or chain bond.

Window and door openings are formed using lintels: reinforced concrete, steel or brick. The walls are insulated (if necessary) and then plastered or faced.

Reinforcement is added every 4-5 courses. The verticality and evenness of the masonry are checked. The joints are filled with mortar.

The "pressed" technique

The bricks are laid without mortar, leaving gaps. The gaps are then filled with mortar under pressure.

This technique speeds up the laying process.

The "open-joint" technique

The bricks are laid on the face side, leaving the inner part hollow. The cavities are filled with insulating material.

This technique improves the thermal insulation properties.

Stages of laying during the construction of a brick house: waterproofing the foundation, building the plinth, laying the first course, laying subsequent courses, reinforcing the masonry and plastering.

Roof

The final element of construction, which determines not only the aesthetics but also the functionality. Common options:

Pitched:
  • Gable roof: simple, economical, suitable for various climate zones.
  • Hip roof: more complex but attractive, providing an even load distribution.
  • Attic (mansard) roof: increases living space but requires careful design.
  • Single-slope roof: a budget option for small buildings.
  • Half-hip roof: combines the aesthetics of a hip roof with the practicality of a gable roof.
  • Hip roof: symmetrical, suitable for square houses.
  • Multi-gable roof: complex but striking, suitable for intricate architectural designs.
  • Diamond roof: resembles a hip roof but with a more complex configuration.

Flat:
  • Usable roof: used as a terrace, garden or recreation area.
  • Non-usable roof: simple and cheap but requires regular maintenance.
  • Vaulted roof: arched or domed, used to create a unique design.

Other:
  • Domed roof: striking but complex to design and build.
  • Conical roof: used for towers and other round buildings.

The type and height of the roof for brick houses are determined by various factors. Snowy regions need a high pitched roof, windy ones a hip roof. An attic roof, for example, increases the floor area of the house. The choice of shape depends on the architectural style. Pitched roofs are more expensive than flat ones.

The best option is a gable or hip roof with a slope of 30-45°. It provides good waterproofing, snow run-off and ventilation.

When building brick houses, the following materials are used for the roof of a brick house: metal tiles - light, strong, durable and available in various colours; corrugated sheeting - economical, practical and suitable for complex shapes; natural tiles - attractive and durable but heavy and expensive; composite tiles - combining the advantages of metal tiles and natural tiles; and bituminous shingles - flexible, quiet, light and suitable for complex shapes.

Building the roof consists of 4 stages: installing the rafter system, laying the battens, installing the roofing, and fitting the drainage system.

Reinforced ring beam

It is an important element when a private brick house is being built. The ring beam ensures its strength, rigidity and durability.

Functions of the reinforced ring beam: evenly distributing the load from the floors and roof onto the walls, increasing the strength and rigidity of the structure, preventing cracks in the masonry, and tying the walls of the house into a single frame.

Types of reinforced ring beam:

  • Reinforced concrete: the most common type, made from concrete reinforced with steel bars.
  • Prefabricated: consists of ready-made reinforced concrete blocks joined together.
  • Wooden: used in low-rise construction, made from timber treated with an antiseptic.

Installing a reinforced ring beam for a brick house

The height, width and cross-section of the reinforced ring beam are determined. Formwork is made from boards or plywood. A reinforcement cage of steel bars is laid. The concrete mix is poured into the formwork and vibrated, and it gains strength over 28 days.

The reinforced ring beam must be closed around the entire perimeter. Bars with a diameter of at least 12 mm are used for reinforcement. The concrete mix must be of grade no lower than M200. Before pouring the concrete, the masonry must be waterproofed.

Insulating the house when you order the "brick house construction" service from our company: comfort and savings

Bricks are strong and durable but not always sufficiently energy-efficient. Insulating the walls improves living comfort, reduces heating costs and improves the indoor climate.

Is it worth insulating the house?

There is no single answer. The decision depends on several factors: the thicker the wall, the lower the heat loss. In cold regions, insulation is more relevant. At low temperatures, even thick walls can feel cold. Insulation helps reduce heating costs.

Types of insulation: outside, inside, or within the walls.

From outside: the most effective method, as the dew point shifts outward.
From inside: a less effective but simpler and more affordable option.
Within-wall: used during construction or major renovation.

The following are used for insulation: mineral wool - a non-combustible, effective insulation with good sound insulation; polystyrene foam - affordable, light and easy to install; extruded polystyrene foam - a strong, waterproof insulation; and expanded polystyrene - the most budget-friendly option, but less effective and combustible.

Windows and doors: features, types and what to consider when building brick houses

The walls must be significantly thicker than those of panel or frame houses. This must be taken into account when choosing windows and doors so that they blend harmoniously with the facade.

The house itself has good thermal insulation properties. However, to improve the energy efficiency of the house, it is important to choose the right windows and doors with a sufficient level of thermal insulation.

Brick houses may settle for several years after construction. This must be taken into account when installing windows and doors to avoid deformation and damage to the structures.

Windows and doors: features, types and what to consider when building brick houses

The walls must be significantly thicker than those of panel or frame houses. This must be taken into account when choosing windows and doors so that they blend harmoniously with the facade.

The house itself has good thermal insulation properties. However, to improve the energy efficiency of the house, it is important to choose the right windows and doors with a sufficient level of thermal insulation.

Brick houses may settle for several years after construction. This must be taken into account when installing windows and doors to avoid deformation and damage to the structures.

What to consider when building a brick house:

Windows and doors must match the size and shape of the openings. For brick houses, PVC, wooden or aluminium windows and doors are most often chosen. The heat transfer coefficient of the windows and doors must suit the region's climate. The hardware must be reliable and functional. The windows and doors must match the architectural style of the house.

The brick house construction calculator also includes the installation of utility networks

Water supply and sewerage:

Connections are made to the central networks, or autonomous systems are set up (a well, a septic tank). Pipes are laid in chases or ducts, allowing for the gradients needed for the sewerage. Filters, pumps and plumbing fixtures are installed.

Heating:

Various options are possible: central or autonomous (gas, electric, solid-fuel). The pipework is laid floor by floor, with radiators, thermostats and a heating boiler installed.

Power supply:

It is designed to account for the power of the electrical appliances. Cables are laid in chases, and the distribution board, sockets, switches and light fittings are installed.

Ventilation:

It provides a supply of fresh air and removes stale air. It can be natural or forced (with fans). It includes ducts, grilles and valves.
Power supply
Power supply
Water supply and sewerage
Water supply and sewerage
Heating
Heating
Ventilation
Ventilation

Power supply

Water supply and sewerage

Heating

Ventilation

Power supply

Water supply and sewerage

Heating

Ventilation

Blind area

It is a landscaping element that encircles the brick house around its perimeter. It is a strip sloping away from the walls, made of water-impermeable materials.

Functions of the blind area

It directs precipitation away from the walls and foundation, reducing the risk of damage from freezing and soil heaving. It prevents water accumulation, waterlogging and flooding of the basement. It gives the house a finished look and serves as a path around it.

Advantages of the blind area: it extends the service life, prevents mould and fungus in the basement, protects the plinth from mechanical damage and reduces soil freezing.

Building brick houses offers the following exterior finishing options

Finishing is not mandatory. Brick is strong and durable in itself, able to withstand the elements.

Functions of the finish

It protects against the destructive effects of the environment (rain, snow, sun, temperature changes). It extends the service life of the masonry. It gives the building a more attractive appearance. It allows an individual style to be created. It masks defects in the masonry. It reduces heat loss, which lowers heating costs. It improves the comfort of living in the house.

Building brick houses in Almaty: pros and cons

PROSCONS
The houses can stand for 100-150 yearsHigh cost
The walls are very strong and can bear heavy loadsLabour-intensive construction
Retains heat wellSlow construction speed
Absorbs sound wellHigh thermal conductivity
Does not burnRisk of cracks
Environmentally friendlyDifficulty of finishing
Brick houses have a beautiful and solid appearanceHeavy weight
Not subject to rot or corrosionRequire regular maintenance
Can be plastered, painted, or faced with tiles or other materialsCan be damp if waterproofing is not done
Customer reviews of our work

Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!
Phone:+7 (708) 111-50-40Our address:Almaty, Timiryazev St., 42 bldg 10a, office 2; floor 3Daily: 9:00–21:00 (by appointment)
WhatsApp