PROFI-DOM — construction company +7 (701) 944-47-70
ENRUKZ

Hotel and inn design

In 7 days
with 100% compliance sNiP and GOST standards
calculate the cost of the project

We design hotels that combine functionality, staff convenience and guest comfort

  • 200+ successfully completed projects
  • Full support until the permits are obtained
  • A team of engineers with 10+ years of experience
  • 100% compliance with current standards: SNiP, SP, GOST

Hotel and inn design

In 7 days

with 100% compliance

sNiP and GOST standards

We design hotels that combine functionality, staff convenience and guest comfort

Full support until the permits are obtained

200+ successfully completed projects

100% compliance with current standards: SNiP, SP, GOST

A team of engineers with 10+ years of experience

Hotel and inn design

In 7 days

with 100% compliance

sNiP and GOST standards

We design hotels that combine functionality, staff convenience and guest comfort

200+ successfully completed projects

A team of engineers with 10+ years of experience

Full support until the permits are obtained

100% compliance with current standards: SNiP, SP, GOST

Types of hotels and inns we design

City hotel

RESORT HOTEL
BUSINESS HOTEL

Country hotel (guest house)

Transit hotel (airport hotel)

BOUTIQUE HOTEL
APART-HOTEL

MINI-HOTEL

Types of hotels and inns we design

City hotel

RESORT HOTELBUSINESS HOTEL

Country hotel (guest house)

Transit hotel (airport hotel)

BOUTIQUE HOTELAPART-HOTEL

MINI-HOTEL

Types of hotels and inns we design

City hotel

RESORT HOTELBUSINESS HOTEL

Country hotel (guest house)

Transit hotel (airport hotel)

BOUTIQUE HOTELAPART-HOTEL

MINI-HOTEL

Find out the cost of designing an inn / hotel by answering 5 questions

Completion time 3 minutes

What type of hotel are you planning to build?

What style would you like the hotel to be designed in?

Where will the hotel be located?

What hotel class is planned?

Which zones would you like to include in the design?

WE HAVE RECEIVED YOUR DETAILS AND ARE STARTING THE CALCULATIONS!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

Why 98% residents of Kazakhstan order hotel and inn designs from us

Our advantages

BUDGET SAVINGS

We create designs that save money during construction without compromising quality.

A DESIGN IN 7 DAYS

A well-coordinated design process allows it to be developed in 7-30 days.

HELP WITH PAPERWORK

We will help settle all the paperwork involved in the building permit and the preparation of documents.

WORK STRICTLY TO STANDARDS

All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility.

ENGINEERS WITH 10+ YEARS OF EXPERIENCE

Our staff includes architects and engineers who hold permits to work in earthquake-prone zones.

BUILDING DESIGNS WITH 9+-POINT SEISMIC RESISTANCE

We use modern design technologies with a focus on seismic resistance.

LEAVE A REQUESTWe will call you back within 3 minutes

Why 98% residents of Kazakhstan order hotel and inn designs from us

Our advantages

We create designs that save money during construction without compromising quality.

BUDGET SAVINGS

A well-coordinated design process allows it to be developed in 7-30 days.

A DESIGN IN 7 DAYS

We will help settle all the paperwork involved in the building permit and the preparation of documents.

HELP WITH PAPERWORK

All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility.

WORK STRICTLY TO STANDARDS

Our staff includes architects and engineers who hold permits to work in earthquake-prone zones.

ENGINEERS WITH 10+ YEARS OF EXPERIENCE

We use modern design technologies with a focus on seismic resistance.

BUILDING DESIGNS WITH 9+-POINT SEISMIC RESISTANCE

We will call you back within 3 minutes

Why 98% residents of Kazakhstan order hotel and inn designs from us

Our advantages

We create designs that save money during construction without compromising quality.

BUDGET SAVINGS

A well-coordinated design process allows it to be developed in 7-30 days.

A DESIGN IN 7 DAYS

We will help settle all the paperwork involved in the building permit and the preparation of documents.

HELP WITH PAPERWORK

All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility.

WORK STRICTLY TO STANDARDS

Our staff includes architects and engineers who hold permits to work in earthquake-prone zones.

ENGINEERS WITH 10+ YEARS OF EXPERIENCE

We use modern design technologies with a focus on seismic resistance.

BUILDING DESIGNS WITH 9+-POINT SEISMIC RESISTANCE

We will call you back within 3 minutes

catalogue of completed hotel and inn projects

The price is given for developing the design

Area
Number of floors
Dimensions
Project No. 607Project No. 607
Floors: 3
Total area: 880 m²
Building footprint: 312 m²
66 000 000kzt
VIEW PROJECT
Project No. 608Project No. 608
Floors: 3
Total area: 789 m²
Building footprint: 450 m²
59 175 000kzt
VIEW PROJECT
Project No. 609Project No. 609
Floors: 3
Total area: 790 m²
Building footprint: 450 m²
59 250 000kzt
VIEW PROJECT
Project No. 610Project No. 610
Floors: 3
Total area: 1110 m²
Building footprint: 445 m²
83 250 000kzt
VIEW PROJECT

developing a custom design

LEAVE A REQUEST

We will call you back within 3 minutes

7 - 30

is the average duration of project development

Up to

development project concepts

an unlimited number of revisions to the design

5

options

days

developing a custom design

7 - 30

is the average duration of project development

an unlimited number of revisions to the design

Up to

development project concepts

5

options

days

LEAVE A REQUEST

We will call you back within 3 minutes

developing a custom design

is the average duration of project development

development project concepts

an unlimited number of revisions to the design

Up to

7 - 30

5

options

days

We will call you back within 3 minutes

functional zones

We shape the layout solutions and the set of rooms, and define the functional zones

Floor plans

At this stage, the architect creates step-by-step plans of the building with dimensions and furniture arrangement

01.

03.

siting the building on the plot

At this stage, the architect positions the future building in accordance with all codes and regulations

layout in 3D

Created for those who find it easier to perceive space in a three-dimensional representation

02.

04.

Project in cross-section

On such a plan you can see the location of the building's elements. This will help determine the layout

3D panorama visualisation

Created for those who find it easier to perceive space in a three-dimensional representation

05.

07.

building facades

This stage is needed for carrying out the work quickly and obtaining the permits to implement the project

explanatory note

Needed to clarify important points and present the overall picture of the development

06.

08.

the building's foundation

Foundation design is necessary to protect the building from subsidence, cracks and so on

final specification

All work and the final documentation must be approved by the client

09.

11.

working drawings and details

At this stage, working drawings of all the building's structures are provided

utility networks

They constitute the life support system of a building or structure

10.

12.

LEAVE A REQUEST

We will call you back within 3 minutes

functional zones

We shape the layout solutions and the set of rooms, and define the functional zones

01.

siting the building on the plot

At this stage, the architect positions the future building in accordance with all codes and regulations

02.

Project in cross-section

On such a plan you can see the location of the building's elements. This will help determine the layout

05.

building facades

This stage is needed for carrying out the work quickly and obtaining the permits to implement the project

06.

the building's foundation

Foundation design is necessary to protect the building from subsidence, cracks and so on

09.

working drawings and details

At this stage, working drawings of all the building's structures are provided

10.

Floor plans

At this stage, the architect creates step-by-step plans of the building with dimensions and furniture arrangement

03.

layout in 3D

Created for those who find it easier to perceive space in a three-dimensional representation

04.

3D panorama visualisation

Created for those who find it easier to perceive space in a three-dimensional representation

07.

explanatory note

Needed to clarify important points and present the overall picture of the development

08.

final specification

All work and the final documentation must be approved by the client

11.

utility networks

They constitute the life support system of a building or structure

12.

LEAVE A REQUEST

We will call you back within 3 minutes

functional zones

We shape the layout solutions and the set of rooms, and define the functional zones

01.

siting the building on the plot

At this stage, the architect positions the future building in accordance with all codes and regulations

02.

Floor plans

At this stage, the architect creates step-by-step plans of the building with dimensions and furniture arrangement

03.

layout in 3D

Created for those who find it easier to perceive space in a three-dimensional representation

04.

Project in cross-section

On such a plan you can see the location of the building's elements. This will help determine the layout

05.

building facades

This stage is needed for carrying out the work quickly and obtaining the permits to implement the project

06.

3D panorama visualisation

Created for those who find it easier to perceive space in a three-dimensional representation

07.

explanatory note

Needed to clarify important points and present the overall picture of the development

08.

the building's foundation

Foundation design is necessary to protect the building from subsidence, cracks and so on

09.

working drawings and details

At this stage, working drawings of all the building's structures are provided

10.

final specification

All work and the final documentation must be approved by the client

11.

utility networks

They constitute the life support system of a residential building or structure

12.

We will call you back within 3 minutes

what a full hotel / inn design includes

concept design

It gives an idea of the details, structural features, dimensions and appearance of the building. It is the first stage of architectural design, making it possible to determine the style and appearance of the future building, its size, shape, spatial and layout solutions, as well as the internal layout and zoning.

working design

This is the stage after the concept design, where all aspects of the design are worked out in detail. It includes all the working drawings, architectural and urban planning indicators, technical data, material schedules, estimates and the work schedule. It provides the detailed information needed to build or renovate the building.

Engineering (technical) design

Designing solutions that make the building's sewerage and water supply systems, ventilation, power supply, heating and other utilities convenient to operate.

Technical support

Help with obtaining the building permit and getting the documents approved. This is one of the most important stages.

LEAVE A REQUESTWe will call you back within 3 minutes

what a full hotel / inn design includes

It gives an idea of the details, structural features, dimensions and appearance of the building. It is the first stage of architectural design, making it possible to determine the style and appearance of the future building, its size, shape, spatial and layout solutions, as well as the internal layout and zoning.

Learn more

concept design

This is the stage after the concept design, where all aspects of the design are worked out in detail. It includes all the working drawings, architectural and urban planning indicators, technical data, material schedules, estimates and the work schedule. It provides the detailed information needed to build or renovate the building.

Learn more

working design

Designing solutions that make the building's sewerage and water supply systems, ventilation, power supply, heating and other utilities convenient to operate.

Learn more

Engineering (technical) design

Help with obtaining the building permit and getting the documents approved. This is one of the most important stages.

Technical support

We will call you back within 3 minutes

what a full hotel / inn design includes

It gives an idea of the details, structural features, dimensions and appearance of the building. It is the first stage of architectural design, making it possible to determine the style and appearance of the future building, its size, shape, spatial and layout solutions, as well as the internal layout and zoning.

Learn more

concept design

This is the stage after the concept design, where all aspects of the design are worked out in detail. It includes all the working drawings, architectural and urban planning indicators, technical data, material schedules, estimates and the work schedule. It provides the detailed information needed to build or renovate the building.

Learn more

working design

Designing solutions that make the building's sewerage and water supply systems, ventilation, power supply, heating and other utilities convenient to operate.

Learn more

Engineering (technical) design

Help with obtaining the building permit and getting the documents approved. This is one of the most important stages.

Technical support

We will call you back within 3 minutes

Develop a custom hotel / inn design

Leave a request and we will contact you within 5 minutes

+7

By clicking the button you agree to the terms of the Privacy Policy

Or call us at

+7 (701) 944-47-70

Develop a custom hotel / inn design

Leave a request and we will contact you within 5 minutes

+7

By clicking the button you agree to the terms of the Privacy Policy

Or call us at

+7 (701) 944-47-70

Develop a custom hotel / inn design

Leave a request and we will contact you within 5 minutes

+7

By clicking the button you agree to the terms of the Privacy Policy

Or call us at

+7 (701) 944-47-70

hotel and inn design

Author: Nurlan Serikbayev, Chief Architect of Shopping Centres, retail development expert

Urbanisation, new consumer demands and fierce competition are today's reality. Creating a shopping centre in Almaty is no longer just about planning retail spaces. It is a complex blend of architecture, economics and an understanding of human behaviour.

The key to success lies at the intersection of bold architecture and reinforced-concrete business logic.
Why do some shopping centres break records while others stand empty? It is all down to design. The main foundation is not reinforced concrete but deep analytics and a flawless concept.

Key principles of shopping centre design in Almaty's conditions

Almaty is a city with a unique structure and high competitive density. A new property must offer not just retail, but a new environment. The first stage is concept development. This is the DNA of the future centre, defining its positioning, target audience and tenant mix. Without a clear concept, a project is doomed to market blindness.

The next step is layout solutions. The architect must see the property not as a static diagram but as a dynamic system of people flows. Anchor tenants become magnets that distribute the flow evenly throughout the space. The main trade-off here is that in order to create the ideal shopper circulation route we sometimes sacrifice leasable area, ultimately winning through higher footfall and average spend.

Expert advice from Nurlan Serikbayev, Chief Architect of the shopping centre: "Never cut corners on the design of utility systems at the shopping centre design stage. The flip side of a striking facade and expensive finishes is the inability to quickly relocate a socket for a new tenant or to provide capacity for a future food court. Everything is planned 20-30 years ahead".

The evolution of approaches to shopping centre design: from standard solutions to unique spaces

Shopping centre designs used to resemble industrial construction. The main goal was to minimise the cost per square metre. This led to low quality public areas and rapid degradation of the property. The alternative was attempts to create excessively pompous, “palatial” spaces, which sharply increased construction and subsequent maintenance costs, making rent unaffordable for many retailers.

Modern retail space design has taken the best of both approaches. Today we create flexible frames that allow the layout to be changed easily, and we concentrate investment on the quality of public areas, wayfinding systems and comfort. It is like Lego: a sturdy base frame and many scenarios for filling it.

Architecture and design: creating emotions through space

Facade and interior design is not about decoration. It is a powerful marketing tool. Successful architecture becomes a calling card and generates organic footfall. In shopping centre design we actively use 3D visualisation. This is not just a pretty picture for a presentation to the investor. It is a working tool that allows us to check ergonomics, assess brand visibility and eliminate layout conflicts in advance.

Organising the interior space requires meticulous work. Zoning must take the shopper's psychology into account. Rest areas, children's play zones and wayfinding all work to increase dwell time and loyalty. By choosing complex, sculptural forms in the interior, we inevitably sacrifice part of the usable volume and increase cleaning costs, but we gain in creating a unique atmosphere that cannot be copied.

Regulatory framework and engineering systems: the foundation of stability and safety

Designing a shopping centre in Kazakhstan requires in-depth knowledge of the SNiP RK and many special standards. This concerns not only fire safety but also accessibility for people with limited mobility, energy efficiency and environmental requirements. Integrating these standards into the creative process is a key task for the designer.

Engineering design for a shopping centre is a separate large-scale workstream. Air conditioning, ventilation, power supply and water supply systems must be designed for peak loads. Let us compare two approaches to organising the systems:

Parameter

Centralised systems

Decentralised systems

Capital costs

High

Moderate

Flexibility

Low

High

Operating costs

Below with proper operation

Depends on the tenants

Fault tolerance

Single point of failure

High, local refusal

Project economics: from calculations to real payback

Any shopping centre project begins with a feasibility study. All parameters are calculated here: from construction costs to the projected rental income. The key metric becomes not the cost per square metre, but the income per square metre and the overall return on investment.

Cost-effectiveness is built in at the design stage of retail premises. For example, ceiling height directly affects construction costs, but it also determines future flexibility for tenants. A comparison of various structural solutions shows their impact on the final figures:

Structural solution

Impact on cost

Impact on timeframe

Long-term effect

Monolithic frame

Higher

Longer

Maximum flexibility, durability

Steel structures

Lower

Faster

Restrictions on layout changes

Precast reinforced concrete

Moderate

Fast

Low flexibility, standard solutions


Expert advice from Nurlan Serikbayev, Chief Architect of the shopping centre:"Build into the concept 10–15% of non-standard space — atriums for events, wide corridors, landscaped areas. In the short term this seems like ‘lost’ floor area, but it is precisely this that creates the very atmosphere that distinguishes a modern shopping centre from a bazaar and builds a loyal audience for decades."

Shopping centre design: working with tenants and brands based on real demand

Layout solutions must be a dialogue with the retailers. Tenants' technical specifications are not wishes but technical requirements that need to be integrated into the overall design. This is especially true of restaurants and food courts, which require complex utility connections.

The process of developing a shopping centre design can be compared to the work of an orchestra conductor. The architect sets the overall rhythm and harmony, but every musician — engineer, economist, retailer — must fit precisely into the score. The slightest mistake in one of their parts risks ruining the whole piece. That is precisely why deep integration of all participants at the earliest stage is so important.

The future of shopping centre design: technology and sustainable development

The trend towards sustainable development and green construction is becoming firmly embedded in shopping centre design. Solar panels, water recovery systems and energy-efficient materials are no longer an option but a requirement of the times and a condition for reducing long-term operating costs.

Digitalisation is also changing approaches. BIM modelling makes it possible to create a digital twin of the facility, where every detail is calculated and interconnected. This minimises errors on the construction site and gives the management company a powerful tool for operation throughout the entire life cycle of the building.

Designing a shopping centre in Almaty is a strategic investment in a successful commercial future. Deep research, a unique concept, well-thought-out layout solutions and strict compliance with standards — these are the pillars on which a profitable and in-demand property stands. A modern shopping centre is not just a place to shop; it is a new public hub, and it is created on drafting tables and in 3D models by architects and engineers.
CUSTOMER REVIEWS of our projects

Your feedback matters a great deal to us

5.0
based on 13 reviews
5★
13
4★
0
3★
0
2★
0
1★
0
Sort by:
AZ
Amina Zhaksylykova
25 Jun 2026
Qyzmet körsetu deñgeyi zhaksy. Zhobalau tez, esepter düris. Bärin tüsindirip berdi, rahmet!
AB
Aidos Bekenov
22 Jun 2026
We came on the advice of acquaintances. We needed a design for a car wash. Everything was handled clearly and approved quickly. The only thing — a couple of small details in the drawings had to be redone, but after that everything fit together perfectly.
GN
Gaukhar Nurtayeva
19 Jun 2026
To be honest, I had doubts at first. There are so many offers online you cannot tell who is any good. But I really liked the approach here: no pressure, everything explained in plain language. Suleiman is really easy to talk to, a down-to-earth guy.

Frequently asked questions about hotel / inn design

What does hotel design include?
Hotel design includes developing the architectural concept, layout solutions, utility systems, landscaping and interior finishes. It also involves calculating capacity, functional zoning (rooms, lobbies, reception, kitchens, technical rooms) and ensuring compliance with fire and sanitary safety standards.
Where does hotel design begin?
Work begins with an analysis of the site and drafting the technical specification. A concept design is then created, which helps determine the appearance of the building, the number of rooms, the functional zones and an approximate estimate.
What requirements apply to the hotel layout?
The main requirements are convenient logistics (for guests, staff and deliveries), clear zoning of public and service areas, provision of evacuation routes, sound insulation, energy efficiency and comfort for visitors.
Can you develop a turnkey design — from concept to approval?
Yes, our company carries out the full cycle of work: architectural design, engineering calculations, development of working documentation and support during approvals with the supervisory authorities.
Which codes and standards are taken into account when designing hotels?
Designs are produced in accordance with the current SNiP, SP and sanitary requirements. Fire safety, energy efficiency, accessibility (for people with limited mobility) and hotel classification requirements are all taken into account.
Can a hotel be combined with other functions — for example, a cafe or a conference hall?
Yes, this is a common solution. The design can include restaurants, fitness areas, SPA, conference halls and administrative premises — it all depends on the concept and format of the hotel.
Phone:+7 (701) 944-47-70Our address:almaty, Makataev St., 47, office 325 (Partner Business Centre)Daily: 9:00–21:00 (by appointment)
WhatsApp