
Facade work in Almaty
from 1 500 tenge.* per m²
We solve cracks, peeling paint, and cold walls with one contractor: plastering from 2 800 ₸/m², insulation from 3 200 ₸/m².
10 types of work
by one contractorPainting from 1 days,
plastering from 25 year warranty in
the contractEstimate without extra charges,
price in the contract

Facade work in Almaty
from 1 500 tenge.* per m²
We solve cracks, peeling paint, and cold walls with one contractor: plastering from 2 800 ₸/m², insulation from 3 200 ₸/m².
10 types of work
by one contractor
Painting from 1 days,
plastering from 2
5 year warranty in
the contract
Estimate without extra charges,
price in the contract

Facade work in Almaty
from 1 500 tenge.* per m²
We solve cracks, peeling paint, and cold walls with one contractor: plastering from 2 800 ₸/m², insulation from 3 200 ₸/m².
10 types of work
by one contractor
Painting from 1 days,
plastering from 2
5 year warranty in
the contract
Estimate without extra charges,
price in the contract
Types of facade
work we do

Facade insulation

Plastering the walls

Brick cladding

Siding installation

Construction of ventilated facades

Facade painting

Stone finishing

Facade repair

Installation of facade panels

Installation of flashings and reveals
Types of facade
work we do










Facade insulation
Plastering the walls
Brick cladding
Siding installation
Installation of flashings and reveals
Facade repair
Facade painting
Stone finishing
Installation of facade panels
Construction of ventilated facades
We will call you back within 3 minutes
Types of facade
work we do










Facade insulation
Plastering the walls
Brick cladding
Installation of facade panels
Installation of flashings and reveals
Facade repair
Construction of ventilated facades
Facade painting
Stone finishing
Siding installation
We will call you back within 3 minutes
Cost of facade work in
Almaty
| SERVICE | COST | TIME |
|---|---|---|
| Specialist visit to the site (Almaty) | free of charge | 1 hour |
| Minimum order value | from 30 000 ₸ | — |
| Installation of a ventilated facade (per m²) | from 4 500 ₸ | from 3 days |
| Facade plastering (per m²) | from 2 800 ₸ | from 2 days |
| Facade painting (per m²) | from 1 500 ₸ | from 1 day |
| Facade insulation (per m²) | from 3 200 ₸ | from 2 days |
| Facade cladding with tile/stone (per m²) | from 5 500 ₸ | from 3 days |
| Sealing of inter-panel joints (per linear metre) | from 800 ₸ | from 2 hours |
| Installation of flashings and canopies (per linear m) | from 1 200 ₸ | from 3 hours |
| Installation of facade lights (per point) | from 2 500 ₸ | from 1 hour |
| Facade repair (per m²) | from 2 000 ₸ | from 1 day |
| Removal of the old facade (per m²) | from 1 800 ₸ | from 1 day |
Advantages of facade work from Profi-Dom
10 types of facade work
Insulation, plastering, cladding, siding, ventilated facade and painting — one contractor and one estimate
Measurement in 1 hour
A specialist takes measurements and checks the base — we calculate the estimate based on the actual facade

Wet facade and ventilated facade
Insulation from 3 200 ₸/m², plastering from 2 800 ₸/m², ventilated facade from 4 500 ₸/m² — to suit your budget and walls
Painting in 1 day
Painting — from 1 day, plastering — from 2 days, ventilated facade — from 3 days; dates — in the contract
5-year
warranty on the facade
5 years of warranty in the contract: we fix cracks, plaster peeling, and fastener corrosion ourselves
Order from 30 000 ₸
We also take on small jobs: facade repair from 2 000 ₸/m², drip edges from 1 200 ₸/linear m — no surcharges
Advantages of facade work from Profi-Dom
Insulation, plastering, cladding, siding, ventilated facade and painting — one contractor and one estimate
10 types of facade work
A specialist takes measurements and checks the base — we calculate the estimate based on the actual facade
Measurement in 1 hour

Insulation from 3 200 ₸/m², plastering from 2 800 ₸/m², ventilated facade from 4 500 ₸/m² — to suit your budget and walls
Wet facade and ventilated facade
Painting — from 1 day, plastering — from 2 days, ventilated facade — from 3 days; dates — in the contract
Painting in 1 day
5 years of warranty in the contract: we fix cracks, plaster peeling, and fastener corrosion ourselves
5-year
warranty on the facade
We also take on small jobs: facade repair from 2 000 ₸/m², drip edges from 1 200 ₸/linear m — no surcharges
Order from 30 000 ₸
We will call you back within 3 minutes
Advantages of facade work from Profi-Dom
Insulation, plastering, cladding, siding, ventilated facade and painting — one contractor and one estimate
10 types of facade work
A specialist takes measurements and checks the base — we calculate the estimate based on the actual facade
Measurement in 1 hour

Insulation from 3 200 ₸/m², plastering from 2 800 ₸/m², ventilated facade from 4 500 ₸/m² — to suit your budget and walls
Wet facade and ventilated facade
Painting — from 1 day, plastering — from 2 days, ventilated facade — from 3 days; dates — in the contract
Painting in 1 day
5 years of warranty in the contract: we fix cracks, plaster peeling, and fastener corrosion ourselves
5-year
warranty on the facade
We also take on small jobs: facade repair from 2 000 ₸/m², drip edges from 1 200 ₸/linear m — no surcharges
Order from 30 000 ₸
We will call you back within 3 minutes
HOW WE WORK
- 01.Discussion and estimate
We visit the site or hold an online consultation to determine the scope of work precisely and prepare a transparent estimate with no hidden charges.
- 02.Visit for precise measurements
Our specialist arrives at a time convenient for you, takes all necessary measurements, and records facade features for precise material fitting.
- 03.Selection of the facade system
We offer 2–3 finishing options — plaster, cladding, siding, or a ventilated facade — with the price per m² so you can choose according to your budget.
- 04.Approval of the contract
In the contract we fix the final cost, the exact completion dates and the warranty obligations, so that you feel protected.
- 05.Preparation of materials
We purchase insulation, mixes, panels or stone for the chosen system and check each batch for color and completeness.
- 06.Professional installation
We prepare the base and carry out work according to the technology of the chosen system: insulation, reinforcement, plastering, cladding or ventilated facade substructure.
- 07.Finishing and sealing
We carefully finish all corners, joints and openings, treating them with sealant to protect against moisture and draughts.
- 08.Handover of the site and cleanup
We remove construction waste and accept the facade together with you by plane, corners and junctions. Warranty on work — 5 years.
Find out the cost and timing of facade work in 1 minute
catalogue of completed facade work
Facade insulation and plastering of a private house in the Alatau microdistrict
Plinth cladding of a shopping centre on Abay Avenue
Installation of a ventilated facade on an office building in the Bostandyk district
Painting and repair of the facade of an apartment building in the Samal microdistrictFacade works in Almaty from PROFI-DOM: types, materials, prices
PROFI-DOM performs turnkey facade work in Almaty — from insulation to finishing: plastering, siding, ventilated facade, stone and brick cladding, painting. Work (excluding materials) costs from 1 500 ₸/m² for painting, from 2 800 ₸/m² for plastering, from 3 200 ₸/m² for insulation. Warranty — 5 years in the contract.
Published: 16 · Updated: 22
What types of facade work there are for a private house
Facade work is a set of activities for the exterior finishing and protection of a house's walls. Let us look at what types of work there are and in what sequence they are carried out.
Main types of facade work
- Base preparation: cleaning the walls of the old finish, levelling out irregularities with cement mortar, priming — an essential stage before any work.
- Facade insulation: installation of thermal insulation — mineral wool, polystyrene foam or extruded polystyrene foam (XPS) — to reduce heat loss through the walls.
- Final finishing: applying the decorative coating — facade plaster (bark beetle, pebble, mosaic), cladding with siding, clinker tiles, natural or artificial stone, porcelain stoneware.
- Additional work: installation of flashings, framing of window and door reveals, plinth finishing, installation of facade lighting and a drainage system.
- Waterproofing and vapour barrier: protecting the insulation from getting wet and from condensation — films and membranes are installed before the finishing layer, especially in wet and ventilated facades.
Stages of facade work and their sequence
The standard cycle takes from 2 to 6 weeks depending on the wall area (100–300 m²) and architectural complexity. The sequence is strictly fixed: base preparation, insulation installation, fiberglass mesh reinforcement, application of the base plaster layer, finishing. Violating the order — for example, skipping the primer before insulation — inevitably leads to material delamination in the very first winter. At sites in the Aksai, Alatau and Gorny Gigant microdistricts, where temperature differences reach 40 °C, the reinforcement stage is especially critical: the fiberglass mesh is embedded exactly in the middle of the adhesive layer, otherwise cracks will appear under the sun. Technological pauses between stages are mandatory: after applying the base plaster, 3–7 days are required for drying at a temperature of +10…+25 °C and humidity up to 70%. Shortening this pause or forced drying with heat guns leads to uneven shrinkage and delamination of the finishing layer — in practice this means redoing a section of the facade a year later.
Do you need a facade design before starting work
For a private house, a project is not legally required, but it is desirable for complex architecture — bay windows, arches, combined finishing of two or three materials (plaster + stone + wood). Without a sketch, it is difficult to calculate the exact amount of materials: a typical house 10×12 m with a gable roof and six windows requires 160–180 m² of insulation and 200–220 m² of finishing coating, and an error of 10% means a shortage or excess of 15–20 thousand ₸. A project allows you to see in advance how textures and colors combine on different walls — for example, a dark plinth visually “weights” the house, while light plaster on the southern facade glares and fades within two seasons. In our practice, a sketch with color layouts and orientation to the cardinal directions saves clients from 30 000 to 80 000 ₸ on rework, because errors are corrected in the file, not on the wall.
Types of house facade finishing — a review of materials
The choice of material for a house facade depends on the budget, style, and climatic conditions of Almaty. Let's compare the seven main finishing options.
Decorative plaster — a versatile option
Decorative plaster is the most popular facade material used in the wet facade system (SFTC). It provides a smooth seamless coating with textures from "bark beetle" to "lamb", tinted according to RAL, at a price of 5500–8500 ₸/m² for mineral compositions, while acrylic and silicone mixes are 15–20% more expensive but more elastic at the joints of aerated concrete and brick during the daily temperature swings of Almaty spring up to 15°C. High-quality reinforcement with fiberglass mesh in the first layer is mandatory — on local sites, cracks appear after 2–3 years without an overlap of at least 10 cm and diagonal reinforcement at the corners of openings.
Siding — budget-friendly and practical
Vinyl siding is the most affordable material for facade work: from 3500 ₸/m², with fasteners and trims — 4500–5000 ₸/m², while metal with a polymer coating costs 5000–7000 ₸/m², is stronger than vinyl, does not fade on the south side for 5–7 years and withstands hail without dents, although it is noisier in rain. Installation on a galvanized profile lathing creates a ventilation gap — this allows insulating the facade with mineral wool without wet processes for frame houses in the suburbs (Kargaly, Irgeli). When ordering metal siding, check the package with perforated soffits for roof ventilation — otherwise condensation in winter will lead to corrosion of the fasteners.
Cladding with stone and brick — the premium segment
Facing facades with natural stone (sandstone, granite, travertine) and clinker brick is the most durable finish: a service life of 50+ years without repair, price from 12000 ₸/m² for clinker up to 25000 ₸/m² for stone with hydrophobization. The weight of such a finish reaches 80–100 kg/m² — on heaving soils in the Alatau and Aksai districts, the bearing capacity of the foundation is checked before ordering. Clinker tiles 10–15 mm thick weigh three times less than brick, allowing frame houses to be faced without reinforcing the base, but they require frost-resistant adhesive — a regular compound falls off after the first winter.
Facade panels, wood and porcelain stoneware
Facade panels (clinker on a cement base, porcelain stoneware 600×1200 mm) imitate stone and brick but are lighter and cheaper — from 7000 ₸/m², while porcelain stoneware costs up to 12000 ₸/m² with fasteners on an aluminum substructure. Wood (block house, imitation timber, planken made of larch or thermo-ash) costs 6000–9000 ₸/m² but is capricious: it requires annual antiseptic treatment and renewal of the oil coating every 3–5 years. In the dry climate of Almaty, wood lasts up to 15 years, but on the south side under direct rays it fades in 2 seasons — for such walls, thermo-ash or porcelain stoneware without additional maintenance is chosen.
Comparison of materials for a house facade
| Material | Price per m² (material + work) | Service life | Maintenance | Features in Almaty |
|---|---|---|---|---|
| Decorative plaster | 5500–8500 ₸ | 15–25 years | Not required | Resistant to temperature changes |
| Vinyl siding | 3500–5000 ₸ | 20–30 years | Washing once a year | Lightweight, easy installation |
| Metal siding | 5000–7000 ₸ | 30–40 years | Washing once a year | Durable but noisy in the rain |
| Clinker brick | 12000–18000 ₸ | 50+ years | Not required | Requires reinforcement of the foundation |
| Natural stone | 15000–25000 ₸ | 50+ years | Not required | The most expensive option |
| Facade panels (clinker) | 7000–10000 ₸ | 30–40 years | Washing once a year | Light brick imitation |
| Wood (blockhouse cladding) | 6000–9000 ₸ | 10–15 years | Treatment once a year | Requires protection from the sun |
For the Almaty climate, with swings of up to 40°C from winter to summer and dry air, plaster and siding are optimal — they are resistant to UV radiation and do not crack in frosts down to -25°C. Wood on south-facing walls requires the coating to be renewed every year, so for such facades porcelain stoneware or clinker tiles are more practical.
Facade systems: wet and ventilated
Turnkey facade work uses two main technologies: wet facade (SFTC) and ventilated facade. We analyze their differences, pros and cons.
Wet facade (ETICS) — technology and features
A wet facade (SFTC system) is insulation followed by plastering over a reinforcing mesh. Insulation thickness — 50–150 mm, finish — decorative plaster. The technology is layered: expanded polystyrene or mineral wool is glued to the wall, fixed with dowels, a base reinforcing layer with mesh is applied on top, then primer and finishing plaster (acrylic, silicone, silicate or mineral). Each layer requires drying — on average 24–48 hours at +20°C. In Almaty the season for wet work is limited: the temperature must not be below +5°C, and the ideal period is May–September. The city market uses expanded polystyrene with a density of 25–35 kg/m³ and high-density facade stone wool. A wet facade is 20–30% cheaper than a ventilated one, but requires strict adherence to technology. Mistakes at the reinforcing stage lead to cracks within a year — therefore quality control on site is more important than price.
Ventilated facade — design and benefits
A ventilated facade with insulation is a system with an air gap between the thermal insulation and the cladding. A subsystem of metal profiles is used, to which siding, panels, or porcelain stoneware are attached. The structure includes brackets, vertical and horizontal guides, an insulation layer (usually 100–150 mm mineral wool), a wind-waterproof membrane, and a decorative screen with a 40–60 mm gap. Air circulates freely in the cavity — condensate is removed outside, and the insulation stays dry. In Almaty, ventilated facades are installed with a subsystem of galvanized steel or aluminum: for private houses, aluminum is more often chosen — it is lighter and does not rust. Cladding — fiber cement boards, metal siding, porcelain stoneware, or composite panels. A ventilated facade is more expensive than a wet one, but allows cladding installation in any weather and does not require technological pauses. This is relevant due to the short construction season — crews work even in October at +2°C.
Comparison of wet and ventilated facades
| Parameter | Wet facade (ETICS) | Ventilated facade |
|---|---|---|
| Cost per m² | 5500–8500 ₸ | 8000–15000 ₸ |
| Service life | 15–25 years | 30–50 years |
| Seasonality of the work | Only at +5°C and above | Year-round |
| Finishing materials | Plaster | Siding, panels, porcelain stoneware |
| Repairability | Hard to replace a section | Easy to replace a panel |
| Load on the walls | 15–25 kg/m² | 10–20 kg/m² |
| Thermal insulation (R) | 2,5–4,5 m²·°C/W | 3,0–5,0 m²·°C/W |
| Sound insulation | Medium | High (air gap + mineral wool) |
Which facade to choose for a house in Almaty
For a private house in Almaty, a wet facade with mineral wool is optimal — it is cheaper and provides good thermal insulation. A ventilated facade is chosen when finishing with siding or panels. The decision depends on the budget and durability requirements: if you plan to live in the house permanently and do not want repairs for 25+ years — the vent facade pays off due to the absence of cracks and lower heat loss. For country houses and seasonal living, a wet facade is more practical — it will cost 5500–8500 ₸/m² versus 8000–15000 ₸/m². In the mountainous part of the city (Kamеnka, Tau-Samal districts) humidity is higher, so a ventilated system is preferable there — it removes steam without the risk of plaster peeling. If the house is in an area of strong winds (on the outskirts, in the mountains), a ventilated facade is more reliable — it is not afraid of vibrations and impact loads.
Insulation, plastering and painting of the facade
Finishing a house facade includes three key processes: insulation, plastering and painting. Each stage affects the thermal insulation and the appearance of the building.
Facade insulation — materials and thickness
In Almaty, facade insulation is practically essential for houses with aerated concrete, brick, and panel walls — the optimal insulation thickness is 100 mm for mineral wool and 80 mm for expanded polystyrene (EPS). For the plinth and foundation, extruded polystyrene (XPS) with a thickness of 50 mm is used, as it does not absorb moisture and withstands contact with the ground. Mineral wool with a density of 80–120 kg/m³ is better suited for ventilated facades, while EPS with a density of 25–35 kg/m³ is for wet systems with finishing plaster. In Almaty's seismic zone, insulation is fastened with disc dowels — 6–8 pieces per square meter. Saving on insulation thickness leads to freezing walls and mold — with local frosts down to -25°C, a layer of 50 mm is insufficient, so the thickness is determined by thermal engineering calculation.
Facade plastering — application technology
Facade plaster is applied in three layers: the base (rough) layer, 10–15 mm thick, levels the wall; the reinforcing layer, with alkali-resistant fibreglass mesh of 145–165 g/m², prevents cracks; and the decorative finishing layer, 2–4 mm thick, sets the texture — «bark beetle», «pebble» or «mosaic». Each layer dries for 24–48 hours at +15°C, and at +10°C the time increases to 72 hours — missing these timings leads to peeling. For a climate with frequent precipitation in spring and autumn, cement-polymer mixes with water-repellent additives are used — they do not crack when moisture freezes inside the layer. The quality of the plaster depends critically on temperature and humidity: in Almaty the optimal window for the work is from May to September, when the daytime temperature is consistently above +10°C and there is no risk of night frosts.
Facade painting — choosing the paint and preparation
Painting the facade is the most affordable way to refresh a house's exterior: acrylic paints cost from 1500 ₸/l, silicone — from 2500 ₸/l, and silicate, the most vapor-permeable, — from 3500 ₸/l. Before painting, walls must be primed with a deep-penetration acrylic primer — this reduces paint consumption by 15–20% and prevents efflorescence (white salt stains) on the plaster. Paint is applied with a spray gun (capacity 50–80 m²/h) or a roller (20–30 m²/h) in two coats with 4–6 hours of drying between coats. The coating's service life is 5–7 years on the south side and up to 10 years on the north, and in a dry climate with low humidity the paint fades more slowly than in humid regions — the facade can be repainted once every 6–8 years.
Facade service life and its maintenance
The service life of a facade depends on the material: plaster on a wet system — 15–25 years, siding (vinyl or metal) — 20–30 years, clinker tiles and natural stone — 50+ years without major repairs. Maintenance includes washing the facade once a year with low-pressure water and a soft brush (no sandblasting — it damages the plaster) and inspecting joints, corners and fastenings after every winter: sharp daily temperature fluctuations in spring and autumn create thermal stress that manifests as microcracks around window openings. Timely sealing of cracks with acrylic sealant extends the facade's service life by 5–10 years — a neglected crack 2 mm wide turns into 5 mm within a season, with the insulation becoming damp.
What makes up the facade price per m²
The cost of finishing is made up of the price of the material and the work per m². The table shows current prices for each type of cladding, broken down by stage.
Facade work prices per m² — full table
| Type of facade work | Price per m² (work + materials) | What is included |
|---|---|---|
| Insulation with 100 mm mineral wool | 5500–7000 ₸ | Rockwool insulation, Ceresit adhesive, dowels, mesh |
| Insulation with 80 mm polystyrene foam | 4500–6000 ₸ | PSB-S 25, adhesive, dowels, mesh |
| Decorative plaster | 5500–8500 ₸ | Primer, base plaster, 'bark-beetle' or 'pebble-dash' finish |
| Cladding with vinyl siding | 3500–5000 ₸ | Docke siding, galvanised substructure, self-tapping screws |
| Cladding with metal siding | 5000–7000 ₸ | Grand Line siding, substructure, fasteners |
| Cladding with facade panels | 7000–10000 ₸ | Fineber panels, substructure, fasteners |
| Cladding with clinker brick | 12000–18000 ₸ | Brick, masonry mortar, jointing |
| Cladding with natural stone | 15000–25000 ₸ | Sandstone or granite, adhesive, grout |
| Cladding with block house | 6000–9000 ₸ | Timber, antiseptic, subframe |
| Facade painting | 3500–5000 ₸ | Primer, Tikkurila acrylic paint in 2 coats |
The price per m² includes all stages: from wall preparation to the finish. Flashings, reveals and the plinth are charged separately — this is 10–15% of the total estimate. At PROFI-DOM these items are written into the estimate straight away, so that there are no extra charges after the fact.
How to calculate the budget for facade work
To calculate the budget, multiply the facade area by the price per m² of the selected type of finish. For a house of 150 m², decorative plaster over a prepared base will cost 825 000–1 275 000 ₸, insulation with mineral wool will add another 825 000–1 050 000 ₸. If you add clinker brick cladding of the plinth (about 20 m² at 15 000 ₸), another 300 000 ₸ will be added. In the estimate, all work is divided by stages — the cost of each layer is visible separately. This approach allows you to remove unnecessary items before work begins, rather than overpaying for them after the fact.
Calculation example for a 150 m² house
A ventilated facade with vinyl siding for the same house of 150 m² will cost 525 000–750 000 ₸, but without wall insulation. When ordering turnkey finishing at PROFI-DOM, staged payment is offered: 30% at the start, 40% after insulation, 30% after final finishing. This is convenient when the budget is distributed over months — you do not need to have the entire amount at once.
What affects the price of facade work
The final cost is influenced by four factors: the facade area, the chosen material, the complexity of the architecture (bay windows, arches, columns) and the condition of the walls. Curved walls require a thick layer of plaster or additional lathing — this adds 200–500 ₸ per m². If demolition of the old finish is needed, the estimate increases by another 300–500 ₸ per m². Before starting work, the crew cleans and primes the base — this stage is already included in the price per m², as is leveling differences up to 15 mm.
Turnkey facade work with PROFI-DOM
To get a turnkey facade without surprises and downtime, it is more convenient to entrust the work to a company with a full cycle — from measurement to cleanup.
What is included in the complete solution
- Surveyor visit: free, at a convenient time — on weekdays or weekends.
- Drawing up the estimate: transparent, broken down by stages and materials — with no hidden markups.
- Base preparation: removing the old finish, levelling out wall irregularities, deep-penetration priming.
- Insulation: installation of Rockwool mineral wool or Knauf polystyrene foam with adhesive foam and plate dowels.
- Reinforcement: installing facade mesh with a 10 cm overlap to protect against shrinkage cracks.
- Final finishing: decorative plaster, siding, clinker tiles or natural stone.
- Site cleaning: removal of construction waste after finishing — the site remains clean.
How to order turnkey work in Almaty
- Request: via the PROFI-DOM website or by phone — the manager will clarify the address and scope.
- Surveyor visit: free, within 1–2 days, including Sunday.
- Estimate: itemised, with prices per m² for each stage — with no fixed packages.
- Timeframe: from 2 weeks for a 150 m² house — in stable weather a crew of 4 keeps to schedule.
- Districts: all districts of Almaty — from Alatau to Bostandyk, including the suburbs (Kargaly, Irgeli, Otegen-batyr).
Conclusion
Facade work is an investment in the durability and energy efficiency of a house. For the result to meet expectations, it is important to go through the key stages of selection and oversight step by step.
Key takeaways
- Choice of technology: a wet facade is cheaper and lighter, while a ventilated one is more durable and allows cladding with stone, porcelain stoneware or fibre-cement.
- Price per m²: depends on material, complexity and volume; the average range on the Almaty market is 8 000–25 000 ₸ including work and insulation.
- Drawing up an estimate: a detailed estimate should be obtained before the start — it must specify the cost of each layer and separate items for delivery and scaffolding.
- Warranty: a reputable contractor gives a warranty on the work from 1 year to 5 years; if the warranty period is not stated in the contract, that is cause for concern.
- Turnkey: a comprehensive contract saves you from having to control every stage, but requires a thorough check of the company's reputation before signing the contract.

