
Hotel and inn construction in Almaty
and the regionfrom 25 000 ₸*/m² in 1 month*Crew labour cost
Modern hotels and inns thanks to high quality standards and oversight by engineering services at every stage of construction
Strict adherence to construction deadlines
Seismic resistance of 9 points
Extended warranty from 5 years
100% compliance with current
standards: SNiP, SP, GOST

Hotel and inn construction in Almaty
and the region
from 25 000 ₸*/m² in 1 month
*Crew labour cost
Modern hotels and inns thanks to high quality standards and oversight by engineering services at every stage of construction
Extended warranty from 5 years
Strict adherence to construction deadlines
Seismic resistance of 9 points
100% compliance with current
standards: SNiP, SP, GOST

Hotel and inn construction in Almaty
and the region
from 25 000 ₸*/m² in 1 month
*Crew labour cost
Modern hotels and inns thanks to high quality standards and oversight by engineering services at every stage of construction
Strict adherence to construction deadlines
Seismic resistance of 9 points
100% compliance with current
standards: SNiP, SP, GOST
Extended warranty from 5 years
materials we build hotels and inns from
We will call you back within 3 minutes
Cost of building hotels and inns
| MATERIAL | Term | SEISMIC RATING | SHELL | PRE-FINISH | FINISHED |
|---|---|---|---|---|---|
| SIP panel | 30 days | 9 points | from 75 000 KZT | - | from 165 000 KZT |
| Frame | 2 - 3 months | 9 points | from 75 000 KZT | - | from 185 000 KZT |
| Foam block | 2 - 3 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Gas block | 2 - 3 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Monolith | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Heat block | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Brick | 3 - 4 months | 9 points | from 115 000 KZT | from 165 000 KZT | from 210 000 KZT |
| Finblock | 3 - 4 months | 9 points | from 98 000 KZT | from 140 000 KZT | from 170 000 KZT |
| Modules | 1 - 3 months | 9 points | from 75 000 KZT | - | from 145 000 KZT |
| MATERIAL | Term | SEISMIC RATING | SHELL | PRE-FINISH | FINISHED |
|---|---|---|---|---|---|
| SIP panel | 30 days | 9 points | from 25 000 KZT | - | from 75 000 KZT |
| Frame | 2 - 3 months | 9 points | from 25 000 KZT | - | from 92 000 KZT |
| Foam block | 2 - 3 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Gas block | 2 - 3 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Monolith | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Heat block | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Brick | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
| Finblock | 3 - 4 months | 9 points | from 45 000 KZT | from 65 000 KZT | from 76 000 KZT |
MATERIAL
Term
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 75000 KZT
-
from 165000 KZT
Frame
2 - 3 months
9 points
from 75000 KZT
-
from 185000 KZT
Foam block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Gas block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Monolith
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Heat block
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Brick
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Finblock
3 - 4 months
9 points
from 98000 KZT
from 140000 KZT
from 170000 KZT
Modules
1 - 3 months
9 points
from 75000 KZT
-
from 145000 KZT
MATERIAL
Term
SEISMIC RATING
SHELL
PRE-FINISH
FINISHED
SIP panel
30 days
9 points
from 75000 KZT
-
from 165000 KZT
Frame
2 - 3 months
9 points
from 75000 KZT
-
from 185000 KZT
Foam block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Gas block
2 - 3 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Monolith
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Heat block
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Brick
3 - 4 months
9 points
from 115000 KZT
from 165000 KZT
from 210000 KZT
Finblock
3 - 4 months
9 points
from 98000 KZT
from 140000 KZT
from 170000 KZT
Modules
1 - 3 months
9 points
from 75000 KZT
-
from 145000 KZT
Advantages of building hotels and inns with Profi-Dom
A personalised approach
Every project is unique. We develop the design and layout, taking into account your wishes and the characteristics of your hotel's target audience.

Energy efficiency
We apply modern construction methods and engineering solutions, which makes it possible to shorten the work schedule and improve the building's energy efficiency.

Help with obtaining permits
We will take on all the bureaucratic procedures involved in obtaining the necessary permits and approvals.
Eco-friendliness
We use environmentally friendly materials and technologies, which matters to modern travellers and improves the reputation of your business.
meeting
deadlines
Thanks to well-established processes and a professional team, we guarantee that the facility will be handed over within the agreed timeframe.

Seismic resistance and safety
We are familiar with all the nuances of construction, including seismic requirements and the features of the climate, and we guarantee compliance with all safety standards.
Advantages of building hotels and inns with Profi-Dom
Every project is unique. We develop the design and layout, taking into account your wishes and the characteristics of your hotel's target audience.
A personalised approach

We apply modern construction methods and engineering solutions, which makes it possible to shorten the work schedule and improve the building's energy efficiency.
Energy efficiency
We will take on all the bureaucratic procedures involved in obtaining the necessary permits and approvals.
Help with obtaining permits

We use environmentally friendly materials and technologies, which matters to modern travellers and improves the reputation of your business.
Eco-friendliness
Thanks to well-established processes and a professional team, we guarantee that the facility will be handed over within the agreed timeframe.
meeting
deadlines

We are familiar with all the nuances of construction, including seismic requirements and the features of the climate, and we guarantee compliance with all safety standards.
Seismic resistance and safety
We will call you back within 3 minutes
Advantages of building hotels and inns with Profi-Dom
Every project is unique. We develop the design and layout, taking into account your wishes and the characteristics of your hotel's target audience.
A personalised approach

We apply modern construction methods and engineering solutions, which makes it possible to shorten the work schedule and improve the building's energy efficiency.
Energy efficiency
We will take on all the bureaucratic procedures involved in obtaining the necessary permits and approvals.
Help with obtaining permits

We use environmentally friendly materials and technologies, which matters to modern travellers and improves the reputation of your business.
Eco-friendliness
Thanks to well-established processes and a professional team, we guarantee that the facility will be handed over within the agreed timeframe.
meeting
deadlines

We are familiar with all the nuances of construction, including seismic requirements and the features of the climate, and we guarantee compliance with all safety standards.
Seismic resistance and safety
We will call you back within 3 minutes
- 01.FIXED PRICE WITH NO HIDDEN CHARGES
The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design
- 02.OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS
We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.
- 03.5-year quality guarantee
The warranty period is set out in the contract, as are the parties' responsibilities
- 04.strict quality control
Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists
- 05.A close-knit team of professionals
Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands
- 06.Help with paperwork
We will help settle all the paperwork involved in the building permit and the preparation of documents
- 07.Secure storage of materials
A temporary fence is put up for tidy storage and strict control of building materials
- 08.Online monitoring of work progress
You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible
- 09.Work strictly to standards
All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility
- 10.HOUSES WITH 9+-POINT SEISMIC RESISTANCE
We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.
Find out the cost and timeframe for building your hotel or inn in 1 minute
catalogue of completed hotel and inn projects
The price is given for shell construction, including the cost of building materials
Customer reviews of hotel and inn construction in Almaty
Your feedback matters a great deal to us






Hotel construction
Trends in modern hotel construction
In an era of growing concern about environmental issues, our company pays special attention to "green" technologies:
- The introduction of intelligent energy management systems reduces electricity costs. They analyse occupancy, weather conditions and other factors, optimising the operation of lighting, heating and air conditioning.
- The installation of solar panels on the roofs and facades of buildings covers up to 40% of electricity needs. In sunny regions this figure is even higher, which significantly reduces dependence on external energy sources.
We actively apply modular construction technologies that are revolutionising the building process:
- The timeframe is reduced by 50% compared with traditional methods. The modules are manufactured in the factory in parallel with the preparation of the construction site, which significantly speeds up the process.
- Cost savings reach 20% through the optimisation of production processes, reduced waste and less time spent on the construction site.
We design prefabricated hotels and inns in line with modern requirements for flexible and adaptable spaces:
- Creating transformable areas increases the efficiency of space use by 25%. For example, conference halls can easily be turned into banquet or exhibition venues.
- Multifunctional lobbies that serve as a coworking space during the day and transform into lounge areas in the evening increase the appeal of hotels to various categories of guests.
Features of hotel construction
Seismic resistance as a
priority Almaty is located in a zone of high seismic activity. We use advanced technologies to ensure the safety of buildings:
1. Seismic isolation of foundations
- Rubber-metal bearings: special cushions under the building that absorb up to 80% of the earthquake's energy, like shock absorbers in a car.
- Kinematic foundations: special structures that allow the building to move slightly during an earthquake, reducing the impact by 40-50%.
- Viscoelastic: devices similar to shock absorbers that reduce the building's sway by 25-35%.
- Mass dampers: large weights at the top of tall buildings (above 100 m) that reduce sway by 20-30%, acting as a counterweight.
- High-strength concretes B60-B80: a particularly strong concrete that is 40-60% stronger than ordinary concrete.
- Composites: modern materials that are 25-35% lighter than ordinary ones but just as strong.
- Simulation: the use of computers to check how the building will withstand an earthquake of up to 9 points.
- Safety margin: the building is made 15-25% stronger than the standards require, for greater safety.



Adaptation to climatic features
1. Use of energy-efficient facade systems with a high level of thermal insulation:
- Use of sandwich panels with a thermal conductivity coefficient λ = 0,022 W/(m·K)
- Installation of triple-glazed windows with a thermal resistance coefficient R = 1,2 m²·°C/W
- Use of ventilated facades that reduce heat loss by 20-25%
- Installation of heat recovery units with an efficiency of up to 85%, making it possible to save up to 30% of heating energy
- Use of geothermal heat pumps with an energy conversion ratio (COP) of up to 5,0
- Introducing systems to recover heat from wastewater, which return up to 15% of the thermal energy
- Installation of automatic external shading systems that reduce the solar load by 70%
- Use of night-time cooling, which reduces the peak load on the air conditioners by 25-30%
- Use of phase-change materials (PCM) in structures capable of storing up to 200 kJ/kg of thermal energy
- Creation of extensive green roofs with an area of up to 1000 m² on hotel roofs
- Reduction of the roof temperature in summer by 20-25°C compared with ordinary roofs
- Reduction of rainwater runoff by 50-60%, which eases the load on the city's sewage system
Integration into the urban environment
- Use of traditional architectural motifs in a modern interpretation
- Use of local materials combined with innovative technologies
- Creation of green areas and public spaces integrated into the structure of the hotel
PROFI-DOM offers professional turnkey hotel construction in Almaty, providing a full cycle of work from design to commissioning of the facility. Our comprehensive approach, combining advanced technologies, environmental responsibility and financial efficiency, makes it possible to create facilities that not only meet the current requirements of the hospitality industry but are also ready for the challenges of the future.
Frequently asked questions about building hotels and inns in Almaty
What permits are required to build a hotel or inn in Almaty?
- An architectural and planning assignment (APZ) from the department of architecture and urban planning
- A permit for construction and installation works from the department of state architectural and construction control
- Approval of the design with the sanitary and epidemiological service
- Approval with the fire service
- An environmental permit from the department of ecology
What are the average timeframes for building a hotel or inn in Almaty?
- Small hotel (up to 50 rooms): 12-18 months
- Medium hotel (50-150 rooms): 18-24 months
- Large hotel (more than 150 rooms): 24-36 months
What is the average cost of building a hotel or inn?
- Economy class: 150 000 - 250 000 KZT/m²
- Mid-range: 250 000 - 400 000 KZT/m²
- Business class: 400 000 - 600 000 KZT/m²
- Luxury: from 600,000 KZT/m² and up
What are the main stages of building a hotel in Almaty?
- Choosing and acquiring a land plot
- Developing the design and obtaining permits
- Preparation of the construction site
- Laying the foundation and load-bearing structures
- Installation of engineering systems
- Interior finishing and furnishing
- Site landscaping
- Obtaining the commissioning permit
- Recruiting staff and opening the hotel
What features of Almaty's climate should be taken into account when building a hotel?
- Seismic activity (up to 9 points)
- Large temperature swings
- Heavy precipitation in spring
- Strong winds in certain seasons






















