PROFI-DOM — construction company +7 (707) 068-88-68
ENRUKZ

Hotel and inn construction in Almaty

and the region
from 25 000 ₸*/m² in 1 month*Crew labour cost
calculate the construction cost

Modern hotels and inns thanks to high quality standards and oversight by engineering services at every stage of construction

  • Strict adherence to construction deadlines
  • Seismic resistance of 9 points
  • Extended warranty from 5 years
  • 100% compliance with current
    standards: SNiP, SP, GOST

Hotel and inn construction in Almaty

and the region

from 25 000 ₸*/m² in 1 month

*Crew labour cost

Modern hotels and inns thanks to high quality standards and oversight by engineering services at every stage of construction

Extended warranty from 5 years

Strict adherence to construction deadlines

Seismic resistance of 9 points

100% compliance with current
standards: SNiP, SP, GOST

Hotel and inn construction in Almaty

and the region

from 25 000 ₸*/m² in 1 month

*Crew labour cost

Modern hotels and inns thanks to high quality standards and oversight by engineering services at every stage of construction

Strict adherence to construction deadlines

Seismic resistance of 9 points

100% compliance with current
standards: SNiP, SP, GOST

Extended warranty from 5 years

Cost of building hotels and inns

MATERIALTermSEISMIC RATINGSHELLPRE-FINISHFINISHED
SIP panel30 days9 pointsfrom 75 000 KZT-from 165 000 KZT
Frame2 - 3 months9 pointsfrom 75 000 KZT-from 185 000 KZT
Foam block2 - 3 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Gas block2 - 3 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Monolith3 - 4 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Heat block3 - 4 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Brick3 - 4 months9 pointsfrom 115 000 KZTfrom 165 000 KZTfrom 210 000 KZT
Finblock3 - 4 months9 pointsfrom 98 000 KZTfrom 140 000 KZTfrom 170 000 KZT
Modules1 - 3 months9 pointsfrom 75 000 KZT-from 145 000 KZT
MATERIALTermSEISMIC RATINGSHELLPRE-FINISHFINISHED
SIP panel30 days9 pointsfrom 25 000 KZT-from 75 000 KZT
Frame2 - 3 months9 pointsfrom 25 000 KZT-from 92 000 KZT
Foam block2 - 3 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Gas block2 - 3 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Monolith3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Heat block3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Brick3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Finblock3 - 4 months9 pointsfrom 45 000 KZTfrom 65 000 KZTfrom 76 000 KZT
Cost of work with materials per 1 m²

MATERIAL

Term

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 75000 KZT

-

from 165000 KZT

Frame

2 - 3 months

9 points

from 75000 KZT

-

from 185000 KZT

Foam block

2 - 3 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Gas block

2 - 3 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Monolith

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Heat block

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Brick

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Finblock

3 - 4 months

9 points

from 98000 KZT

from 140000 KZT

from 170000 KZT

Modules

1 - 3 months

9 points

from 75000 KZT

-

from 145000 KZT

Cost of work with materials per 1 m²

MATERIAL

Term

SEISMIC RATING

SHELL

PRE-FINISH

FINISHED

SIP panel

30 days

9 points

from 75000 KZT

-

from 165000 KZT

Frame

2 - 3 months

9 points

from 75000 KZT

-

from 185000 KZT

Foam block

2 - 3 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Gas block

2 - 3 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Monolith

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Heat block

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Brick

3 - 4 months

9 points

from 115000 KZT

from 165000 KZT

from 210000 KZT

Finblock

3 - 4 months

9 points

from 98000 KZT

from 140000 KZT

from 170000 KZT

Modules

1 - 3 months

9 points

from 75000 KZT

-

from 145000 KZT

LEAVE A REQUESTWe will call you back within 3 minutes

Advantages of building hotels and inns with Profi-Dom

A personalised approach

Every project is unique. We develop the design and layout, taking into account your wishes and the characteristics of your hotel's target audience.

Energy efficiency

We apply modern construction methods and engineering solutions, which makes it possible to shorten the work schedule and improve the building's energy efficiency.

Help with obtaining permits

We will take on all the bureaucratic procedures involved in obtaining the necessary permits and approvals.

Eco-friendliness

We use environmentally friendly materials and technologies, which matters to modern travellers and improves the reputation of your business.

meeting
deadlines

Thanks to well-established processes and a professional team, we guarantee that the facility will be handed over within the agreed timeframe.

Seismic resistance and safety

We are familiar with all the nuances of construction, including seismic requirements and the features of the climate, and we guarantee compliance with all safety standards.

LEAVE A REQUESTWe will call you back within 3 minutes

Advantages of building hotels and inns with Profi-Dom

Every project is unique. We develop the design and layout, taking into account your wishes and the characteristics of your hotel's target audience.

A personalised approach

We apply modern construction methods and engineering solutions, which makes it possible to shorten the work schedule and improve the building's energy efficiency.

Energy efficiency

We will take on all the bureaucratic procedures involved in obtaining the necessary permits and approvals.

Help with obtaining permits

We use environmentally friendly materials and technologies, which matters to modern travellers and improves the reputation of your business.

Eco-friendliness

Thanks to well-established processes and a professional team, we guarantee that the facility will be handed over within the agreed timeframe.

meeting
deadlines

We are familiar with all the nuances of construction, including seismic requirements and the features of the climate, and we guarantee compliance with all safety standards.

Seismic resistance and safety

We will call you back within 3 minutes

Advantages of building hotels and inns with Profi-Dom

Every project is unique. We develop the design and layout, taking into account your wishes and the characteristics of your hotel's target audience.

A personalised approach

We apply modern construction methods and engineering solutions, which makes it possible to shorten the work schedule and improve the building's energy efficiency.

Energy efficiency

We will take on all the bureaucratic procedures involved in obtaining the necessary permits and approvals.

Help with obtaining permits

We use environmentally friendly materials and technologies, which matters to modern travellers and improves the reputation of your business.

Eco-friendliness

Thanks to well-established processes and a professional team, we guarantee that the facility will be handed over within the agreed timeframe.

meeting
deadlines

We are familiar with all the nuances of construction, including seismic requirements and the features of the climate, and we guarantee compliance with all safety standards.

Seismic resistance and safety

We will call you back within 3 minutes

Why we are №1 in Kazakhstan

Our advantages

LEAVE A REQUESTWe will call you back within 3 minutes
  1. 01.
    FIXED PRICE WITH NO HIDDEN CHARGES

    The contract amount is fixed, and we bear the risk of extra costs arising from inaccuracies in the estimate or design

  2. 02.
    OUR COMPANY HAS BEEN OPERATING FOR 30 YEARS

    We have been operating since 1994. Over this time we have found the best material suppliers, and bulk purchasing allows us to cut costs for our clients.

  3. 03.
    5-year quality guarantee

    The warranty period is set out in the contract, as are the parties' responsibilities

  4. 04.
    strict quality control

    Construction is overseen by experienced technical supervisors with relevant university degrees, certified to work in earthquake-prone areas. Inspections follow detailed checklists

  5. 05.
    A close-knit team of professionals

    Designers and builders are on our staff. This saves time on coordination and keeps responsibility in one pair of hands

  6. 06.
    Help with paperwork

    We will help settle all the paperwork involved in the building permit and the preparation of documents

  7. 07.
    Secure storage of materials

    A temporary fence is put up for tidy storage and strict control of building materials

  8. 08.
    Online monitoring of work progress

    You can watch the construction from your smartphone at any time. Provided at the client's request where technically possible

  9. 09.
    Work strictly to standards

    All solutions comply with the current SNiP, GOST and other standards. We bear legal responsibility

  10. 10.
    HOUSES WITH 9+-POINT SEISMIC RESISTANCE

    We use modern construction technologies: high-strength steel reinforcement, earthquake-resistant composites and design focused on seismic resistance.

Answer 6 questions and get an estimate accurate to 95%

Find out the cost and timeframe for building your hotel or inn in 1 minute

What type of hotel do you plan to build?

What is the expected capacity of your hotel?

What additional services would you like to offer?

What architectural style do you prefer?

Do you already have a hotel or inn design, or does a new one need to be developed?

Do you already have a plot for building a hotel or inn?

One last step!

Enter your phone number so we can send you the estimate and reserve your gift!

+7

catalogue of completed hotel and inn projects

The price is given for shell construction, including the cost of building materials

Area
Number of floors
Dimensions
Project No. 607Project No. 607
Floors: 3
Total area: 880 m²
Building footprint: 312 m²
66 000 000kzt
VIEW PROJECT
Project No. 608Project No. 608
Floors: 3
Total area: 789 m²
Building footprint: 450 m²
59 175 000kzt
VIEW PROJECT
Project No. 609Project No. 609
Floors: 3
Total area: 790 m²
Building footprint: 450 m²
59 250 000kzt
VIEW PROJECT
Project No. 610Project No. 610
Floors: 3
Total area: 1110 m²
Building footprint: 445 m²
83 250 000kzt
VIEW PROJECT

Develop a custom design for your office or business centre

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (707) 068-88-68
Privacy Policy

Develop a custom design for your office or business centre

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (707) 068-88-68
Privacy Policy

Develop a custom design for your office or business centre

Leave a request and we will contact you within 3 minutes

+7

By clicking the button you agree to the terms of the

Or call us at

+7 (707) 068-88-68

Customer reviews of hotel and inn construction in Almaty

Your feedback matters a great deal to us

4.9
based on 22 reviews
5★
19
4★
3
3★
0
2★
0
1★
0
Sort by:
TA
Temirlan Abdurashitov
17 Feb 2026
📷 With photos
We built our house with Yuri. Overall we are happy with the result; communication was first-class and he was always in touch, but there were minor delays in the delivery of materials, which extended the construction time by a week or two. I am confident in the quality.
NT
Nurlan Toleubayev
28 Jan 2026
The house was built to a custom design. All our wishes were taken into account. Overall, everything is good. Thank you for your professionalism.
BU
Bakhtiyar Utegenov
20 Feb 2026
SIP panels really are fast and warm! We moved into our new house just 3 months after construction began. Thank you!

Hotel construction

In 2024, the construction industry is undergoing changes. PROFI-DOM is introducing innovative technologies and approaches to create a new generation of hotels - more comfortable for guests, eco-friendly and cost-effective for owners.

Trends in modern hotel construction

1. Eco-friendliness and energy efficiency
In an era of growing concern about environmental issues, our company pays special attention to "green" technologies:
  • The introduction of intelligent energy management systems reduces electricity costs. They analyse occupancy, weather conditions and other factors, optimising the operation of lighting, heating and air conditioning.
  • The installation of solar panels on the roofs and facades of buildings covers up to 40% of electricity needs. In sunny regions this figure is even higher, which significantly reduces dependence on external energy sources.
2. Modular hotel construction in Almaty
We actively apply modular construction technologies that are revolutionising the building process:
  • The timeframe is reduced by 50% compared with traditional methods. The modules are manufactured in the factory in parallel with the preparation of the construction site, which significantly speeds up the process.
  • Cost savings reach 20% through the optimisation of production processes, reduced waste and less time spent on the construction site.
3. Multifunctional spaces
We design prefabricated hotels and inns in line with modern requirements for flexible and adaptable spaces:
  • Creating transformable areas increases the efficiency of space use by 25%. For example, conference halls can easily be turned into banquet or exhibition venues.
  • Multifunctional lobbies that serve as a coworking space during the day and transform into lounge areas in the evening increase the appeal of hotels to various categories of guests.

Features of hotel construction

Turnkey hotel construction in Almaty has its own specifics, determined by the city's geographical location, its climatic features and cultural context. With extensive experience in the region, we handle all the challenges, offering solutions adapted to local conditions.

Seismic resistance as a
priority Almaty is located in a zone of high seismic activity. We use advanced technologies to ensure the safety of buildings:

1. Seismic isolation of foundations
  • Rubber-metal bearings: special cushions under the building that absorb up to 80% of the earthquake's energy, like shock absorbers in a car.
  • Kinematic foundations: special structures that allow the building to move slightly during an earthquake, reducing the impact by 40-50%.
2. Dampers to absorb vibrations
  • Viscoelastic: devices similar to shock absorbers that reduce the building's sway by 25-35%.
  • Mass dampers: large weights at the top of tall buildings (above 100 m) that reduce sway by 20-30%, acting as a counterweight.
3. Light and strong materials
  • High-strength concretes B60-B80: a particularly strong concrete that is 40-60% stronger than ordinary concrete.
  • Composites: modern materials that are 25-35% lighter than ordinary ones but just as strong.
4. Design that accounts for dynamic loads
  • Simulation: the use of computers to check how the building will withstand an earthquake of up to 9 points.
  • Safety margin: the building is made 15-25% stronger than the standards require, for greater safety.
These technologies also allow us to build prefabricated hotels capable of withstanding earthquakes of up to 9 points, ensuring the safety of guests and protecting our clients' investments.

Adaptation to climatic features

Almaty's climate is characterised by hot summers and cold winters, which creates certain challenges when building hotels. PROFI-DOM offers comprehensive solutions to ensure guest comfort all year round:

1. Use of energy-efficient facade systems with a high level of thermal insulation:

  • Use of sandwich panels with a thermal conductivity coefficient λ = 0,022 W/(m·K)
  • Installation of triple-glazed windows with a thermal resistance coefficient R = 1,2 m²·°C/W
  • Use of ventilated facades that reduce heat loss by 20-25%
2. Introducing heat recovery systems to reduce heating costs:
  • Installation of heat recovery units with an efficiency of up to 85%, making it possible to save up to 30% of heating energy
  • Use of geothermal heat pumps with an energy conversion ratio (COP) of up to 5,0
  • Introducing systems to recover heat from wastewater, which return up to 15% of the thermal energy
3. Use of passive cooling technologies to reduce the load on the air-conditioning systems:
  • Installation of automatic external shading systems that reduce the solar load by 70%
  • Use of night-time cooling, which reduces the peak load on the air conditioners by 25-30%
  • Use of phase-change materials (PCM) in structures capable of storing up to 200 kJ/kg of thermal energy
4. Use of green roofs for natural thermal regulation of buildings:
  • Creation of extensive green roofs with an area of up to 1000 m² on hotel roofs
  • Reduction of the roof temperature in summer by 20-25°C compared with ordinary roofs
  • Reduction of rainwater runoff by 50-60%, which eases the load on the city's sewage system
These solutions not only ensure a comfortable indoor climate in the buildings but also significantly reduce operating costs.

Integration into the urban environment

Turnkey hotel construction requires special attention to the architectural integration into the existing urban environment. Our company develops projects that blend harmoniously with the surrounding development while bringing modern elements into it:

  • Use of traditional architectural motifs in a modern interpretation
  • Use of local materials combined with innovative technologies
  • Creation of green areas and public spaces integrated into the structure of the hotel
This approach makes it possible to create hotels that become not just a place of temporary accommodation but also significant architectural landmarks that enrich the urban environment.

PROFI-DOM offers professional turnkey hotel construction in Almaty, providing a full cycle of work from design to commissioning of the facility. Our comprehensive approach, combining advanced technologies, environmental responsibility and financial efficiency, makes it possible to create facilities that not only meet the current requirements of the hospitality industry but are also ready for the challenges of the future.

Frequently asked questions about building hotels and inns in Almaty

What permits are required to build a hotel or inn in Almaty?
The following main permits must be obtained:

  • An architectural and planning assignment (APZ) from the department of architecture and urban planning
  • A permit for construction and installation works from the department of state architectural and construction control
  • Approval of the design with the sanitary and epidemiological service
  • Approval with the fire service
  • An environmental permit from the department of ecology
The process of obtaining permits can take from 3 to 6 months, depending on the complexity of the project.
What are the average timeframes for building a hotel or inn in Almaty?
The construction time for a hotel in Almaty depends on its size and the complexity of the project:

  • Small hotel (up to 50 rooms): 12-18 months
  • Medium hotel (50-150 rooms): 18-24 months
  • Large hotel (more than 150 rooms): 24-36 months
These timeframes include the time for design, obtaining permits and the construction itself. However, they may vary depending on various factors such as location, seasonality and the availability of materials and labour.
What is the average cost of building a hotel or inn?
The cost of building a hotel or inn in Almaty can vary considerably depending on the hotel's class, size and location. Approximate prices per square metre:

  • Economy class: 150 000 - 250 000 KZT/m²
  • Mid-range: 250 000 - 400 000 KZT/m²
  • Business class: 400 000 - 600 000 KZT/m²
  • Luxury: from 600,000 KZT/m² and up
These figures include basic finishing and equipment but do not account for the cost of land and additional expenses for marketing, branding, etc.
What are the main stages of building a hotel in Almaty?
The main stages include:

  1. Choosing and acquiring a land plot
  2. Developing the design and obtaining permits
  3. Preparation of the construction site
  4. Laying the foundation and load-bearing structures
  5. Installation of engineering systems
  6. Interior finishing and furnishing
  7. Site landscaping
  8. Obtaining the commissioning permit
  9. Recruiting staff and opening the hotel
What features of Almaty's climate should be taken into account when building a hotel?
During design, the following should be taken into account:

  • Seismic activity (up to 9 points)
  • Large temperature swings
  • Heavy precipitation in spring
  • Strong winds in certain seasons
These factors influence the choice of building materials and the design of the foundation and utility systems.
Phone:+7 (707) 068-88-68Our address:almaty, Makataev St., 47, office 325 (Partner Business Centre)Daily: 9:00–21:00 (by appointment)
WhatsApp