Facade cladding with thermal panels is a technology that combines insulation and decorative finishing in a single layer. The panels consist of insulation (PUR or EPS) and a facing coating (clinker tiles or porcelain stoneware). The main advantage is the absence of thermal bridges thanks to the tongue-and-groove joint and a service life of up to 50 years.
What facade thermal panels are and how they are constructed
Let us look at what thermal panels consist of, which layers make up their structure, and how they achieve insulation and a decorative appearance at the same time.
What facade thermal panels consist of
A facade thermal panel is a multi-layer structure made of insulation (polyurethane foam or expanded polystyrene) and a decorative layer (clinker tiles or porcelain stoneware) bonded together in factory conditions. The inner layer is PU insulation with a density of 40–60 kg/m³ and is responsible for heat retention: a thermal conductivity coefficient of 0.022–0.028 W/m·K means that a layer of 50 mm replaces 100 mm of mineral wool. The outer layer is 12–16 mm thick clinker, which imitates brickwork and requires no painting or plastering: it has already been fired at 1200°C and is resistant to temperature changes from -50 to +80°C. Between the layers is a factory adhesive compound that withstands 0.8–1.2 MPa on pull-off, which prevents delamination under wind loads in the Almaty foothills. The insulation thickness varies from 30 to 100 mm, which allows a panel to be selected for the climatic conditions of the region without losing usable floor area inside the house.
How the tongue-and-groove interlock works
The tongue-and-groove interlocking joint is a system for joining panels in which the protrusion of one panel fits into the groove of the adjacent one, creating a hermetic joint without through seams. On each panel, longitudinal grooves 10–15 mm deep are milled on two sides, and corresponding tongues on the opposite sides; during installation the panels are pulled together, and the joint is filled with polyurethane foam or a special sealant. Unlike traditional facade systems, where the insulation is fixed with dowels and each dowel becomes a potential cold bridge, here the lock acts as a continuous thermal barrier across the entire wall plane. Thanks to the interlocking joint, cold bridges at the joints are eliminated — the main problem of traditional facade systems, where the insulation is installed separately from the decorative covering.
Key characteristics of thermal panels: thermal conductivity, dimensions, service life
The thermal conductivity of thermal panels is 0.022–0.028 W/m·K - this is 2–3 times lower than that of mineral wool at the same layer thickness. Closed-cell polyurethane foam does not absorb moisture (water absorption of less than 2% over 24 hours), so the panels can be installed on the plinth and in the capillary rise zone without additional waterproofing. The standard sizes - 600×600 mm for corner elements and 600×1200 mm for standard ones - allow the panels to be cut with an ordinary hacksaw without special tools and fitted to any wall geometry. Manufacturers give a 10–15-year guarantee on the adhesive layer and up to 50 years on the clinker: the coating does not fade in the sun (the pigments are throughout the material) and does not crack when water freezes in the pores thanks to the zero water absorption of clinker. The standard panel size of 600×1200 mm allows one person to install up to 10–12 m² of facade per shift, and a service life of 30–50 years makes thermal panels one of the most durable facade materials.
Comparison of thermal panels with other facade systems
| Parameter | Thermal panels | Wet facade | Ventilated facade |
|---|---|---|---|
| Number of layers | 2 (insulation + cladding) | 5–7 (insulation, reinforcement, primer, plaster, paint) | 3–4 (insulation, membrane, battens, cladding) |
| Installation time for 100 m² | 3–5 days | 10–14 days | 7–10 days |
| Service life | 30–50 years | 15–25 years | 25–40 years |
| Thermal bridges | None (interlocking joint) | Present at dowel locations | Present at bracket locations |
| The need for final finishing | No (finished surface) | Yes (plastering, painting) | Yes (cladding installation) |
With the same insulation thickness, thermal panels provide 15–20% better thermal insulation than a "wet facade" system, thanks to the absence of thermal bridges at the fastening points.
Pros and cons of thermal panels for facades
Facade thermal panels are a common question, so let us look at it in detail. To choose a suitable option, it is important to understand the strengths and weaknesses of the different types of thermal panels. Let us compare PU and EPS, clinker and porcelain stoneware.
Benefits of thermal panels: thermal insulation, durability, aesthetics
The main advantage is a reduction in heat loss through the walls by 40–60% compared with an uninsulated facade, which is confirmed by the thermal conductivity of PUR of 0.022 W/m·K. With an insulation thickness of 80–100 mm, the dew point shifts outwards and the walls stop freezing even in Almaty winters with frosts down to −25°C. The service life of factory-made panels reaches 30–50 years without replacing the finish — clinker does not fade or crack from temperature changes, and its frost resistance exceeds 150 cycles. The vapour permeability of the system (0.05 mg/(m·h·Pa)) allows the walls to “breathe”, preventing the accumulation of condensation inside the build-up. The aesthetic advantage — an accurate imitation of brickwork or natural stone — is achieved because the facing layer is moulded in the same moulds as real brick, preserving the geometry and colour transitions.
Cons of thermal panels: price, weight, requirements for the substrate
The main drawback is the higher initial cost compared with a wet facade: on average 30–50% more due to the factory facing layer and precise moulding. If a plastered facade costs 8–12 thousand KZT/m², thermal panels with clinker cost from 14 to 20 thousand KZT/m² depending on the PUR thickness and manufacturer. The weight of a panel with clinker tiles reaches 18–22 kg/m², which requires a thorough check of the load-bearing capacity of the walls — this is critical for aerated concrete and wood. On loose aerated concrete with a density of D400 without reinforcement, the anchoring may not hold, and the panels will fall off after the very first winter. Before installation, the walls must be levelled: deviations of more than 10 mm per 2 metre lead to gaps in the joints and loss of airtightness, so on uneven walls made of shell rock or old brick, the volume of preparatory work can add 20–30% to the estimate.
Comparison of PU and EPS thermal panels: which to choose
| Parameter | PUR (polyurethane) | EPS (expanded polystyrene) |
|---|---|---|
| Thermal conductivity | 0.022–0.024 W/m·K | 0.030–0.038 W/m·K |
| Thickness for R=3.5 | 80 mm | 100 mm |
| Combustibility group | G2–G3 (hardly combustible) | G3–G4 (moderately combustible) |
| Vapour permeability | 0.05 mg/(m·h·Pa) | 0.05 mg/(m·h·Pa) |
| Cost | Higher by 15–25% | Lower |
| Service life | 50 years | 30–40 years |
For regions with a cold climate (average January temperature below −15°C), choosing PUR is justified, as it allows the panel thickness to be reduced by 20–30 mm without loss of thermal insulation — this reduces the load on the foundation and simplifies installation on narrow eaves overhangs.
Comparison of cladding layers: clinker tiles and porcelain stoneware
| Parameter | Clinker tiles | Porcelain stoneware |
|---|---|---|
| Appearance | Brickwork imitation | Natural stone imitation |
| Panel weight | 18–22 kg/m² | 22–25 kg/m² |
| Frost resistance | 150–200 cycles | 100–150 cycles |
| Water absorption | 2–3% | 0.5–1% |
| Price | Medium | Higher by 20–30% |
Porcelain stoneware is heavier than clinker by 15–20% (up to 25 kg/m²), which is important to take into account when installing on walls made of aerated concrete or wood — a reinforced batten grid with a spacing of 400 mm instead of the standard 600 mm may be required.
Methods of installing thermal panels: adhesive, lathing or combined
The choice of method for fixing thermal panels depends on the wall material and its evenness. Let us look at three main methods: on adhesive foam, on battens, and a combined method.
Installation on adhesive foam: when it is suitable
Adhesive foam installation is used on flat walls made of brick, aerated concrete or foam blocks with deviations of no more than 10 mm per 2 metre. This method provides direct fixing without an additional frame — the panel is glued directly to the base, and the adhesive foam for thermal panels fills small gaps and acts as additional insulation. Before application, the wall must be dusted off and primed, especially aerated concrete — its porous structure quickly absorbs moisture from the compound. The adhesive foam is applied in strips along the perimeter of the panel and one strip down the centre — this ensures even load distribution and filling of voids beneath the panel.
Installation on battens: when it is needed
A batten grid is essential when wall deviations exceed 10 mm per 2 metre, as well as for installation on wooden houses — it compensates for irregularities and creates a ventilation gap. The frame is assembled from 50×50 mm timber with a spacing of 600 mm, or from metal profile if the walls are made of aerated concrete — wood in a damp environment can deform. Board insulation must be laid between the guides, and a windproof membrane is stretched over it to prevent draughts. For wooden houses, a batten grid made of 50×50 mm timber with a spacing of 600 mm solves two tasks: levelling and preventing moisture accumulation behind the panels through the 20–30 mm ventilation gap.
Combined installation: adhesive foam + dowels
Combined installation is the most reliable method: the panel is first fixed with adhesive foam, and after 24 hours it is additionally secured with disc dowels at the rate of 5–8 pieces per panel. The adhesive foam holds the thermal panel in place until it sets, while the mechanical fasteners take on the wind load and compensate for possible detachment during building settlement. This method is especially relevant for aerated concrete and old facades with poor adhesion — the adhesive may not withstand the tension from panel expansion during temperature fluctuations. The dowels are installed in the joints between the panels (not through the face surface) — this preserves the aesthetics and does not compromise the airtightness of the cladding layer.
Comparison of installation methods: which one to choose for your home
| Wall type | Recommended method | Why |
|---|---|---|
| Brick, even (differences under 10 mm) | Adhesive foam | Fast, economical, reliable |
| Aerated concrete, foam block | Adhesive foam or combined | Good adhesion, but on uneven surfaces — dowels |
| Wooden house | Battens | Ventilation gap, compensation for shrinkage |
| Old facade (plaster, paint) | Battens or combined | Poor adhesion to the old coating |
| Any walls with deviations of more than 10 mm | Battens | Levelling without a thick adhesive layer |
How to install thermal panels — step-by-step instructions
Let us go through the entire thermal panel installation process step by step — from wall preparation to fixing the last panel. The instructions are suitable for all fastening methods.
Base preparation: cleaning, priming, levelling
Base preparation begins with removing old peeling finishes, dust and grease stains, after which the wall is primed with a penetrating compound to improve adhesion. If oil stains from formwork or efflorescence remain on the facade, they are removed with chemical washes or mechanically with a steel-bristle brush. Then a deep-penetrating primer is applied: for aerated concrete and shell rock — in two coats with an intermediate drying time of 3–4 hours; for concrete and brick — one coat is enough. Surface deviations are checked with a two-metre straightedge: deviations up to 5 mm are corrected with a layer of adhesive compound directly under the panel, while for irregularities of 10 mm or more, levelling plaster (cement-sand mix) or a batten grid is required. At this stage, a plinth drip sill is also installed around the perimeter of the building to divert rainwater. For walls with deviations of more than 10 mm per 2 metre, levelling with cement-sand plaster or a batten grid is necessary before installing thermal panels — otherwise the panels will not form a flat plane.
Installing the starter profile and marking out
The starter profile is fixed along a horizontal level at a height of 10–15 cm from the blind area and sets a straight line for the first row of panels. First, a horizontal line is marked with a laser level around the entire perimeter of the building - from it they step down by the thickness of the panel (usually 60–80 mm) and fix the profile with dowel nails 8×60 mm. The spacing between fasteners is 300–400 mm, and at the corners of the house the profile is not joined end to end but connected at 45 degrees using a corner element - this eliminates gaps and water ingress. Between the profile sections a compensation gap of 2–3 mm is left for every 6 metres of length. The spacing between the dowels of the starter profile is 300–400 mm, and at the corners of the building the profile is joined at 45 degrees for a neat finish.
Installation of the first row of thermal panels
The first row is installed from the corner of the building: adhesive foam is applied to the panel, it is placed on the starter profile and levelled with a rubber mallet. The adhesive foam is applied along the perimeter of the panel in a strip 40–50 mm wide and in two or three strips down the middle — the total consumption is 1–1,5 canisters per 10 m². The panel is pressed against the wall with light movements, checking that the tongue-and-groove joints align with the neighbouring panel; the gap between the panels of the first row is 3–5 mm, fixed with plastic wedges. The vertical is checked with a spirit level immediately after installing each panel, while the adhesive has not yet set. An expansion gap of 3–5 mm is left between the panels of the first row for thermal expansion — without it, the panels may deform in summer.
Installation of subsequent rows: staggering the joints and checking the level
Each subsequent row is installed with the vertical joints offset by half a panel — this provides bonding and even load distribution. In practice, the bonding is done as follows: the first row starts with a whole panel from the corner, the second with half a panel, the third again with a whole one; an angle grinder with a diamond disc is used for trimming. The tongue-and-groove interlocking joint is first cleaned of dust and foam — otherwise the grooves do not snap fully into place, leaving a gap. The level is checked after every three or four rows: even a deviation of 2–3 mm at the height of a storey becomes noticeable and requires trimming of the panels.
Fastening with dowels and fixing the panels
With combined installation, the dowels are installed 24 hours after adhesive fixing — 5–8 pieces per panel, into the joints between the panels, not through the face surface. The holes are drilled with a hammer drill directly through the joint to a depth of 20 mm more than the length of the dowel; for aerated concrete, special expansion dowels with an enlarged anchoring zone are used — ordinary nail dowels do not hold in cellular concrete. The disc dowel (mushroom type) with a diameter of 10 mm is countersunk flush with the panel surface, after which the joint is grouted with frost-resistant clinker grout. The length of the dowel must exceed the panel thickness by 50–60 mm for reliable anchoring in the wall — for aerated concrete, special expansion dowels are used.
Tools for installing thermal panels: what to prepare
- Angle grinder with a diamond disc: for cutting panels to size. Disc diameter — 230 mm, a segmented diamond disc for clinker.
- Laser or spirit level: for checking the horizontal and vertical of each row. A laser level speeds up the work 2–3 times.
- Screwdriver and hammer drill: for drilling holes for the dowels. A hammer drill is essential for concrete and brick walls.
- Rubber mallet: for adjusting panels when joining the locks. A metal hammer damages the facing layer.
- Grout float: for filling the joints between the panels. A rubber float does not scratch the clinker.
- Alignment wedges: for fixing the panels in a single plane until the adhesive sets. Plastic wedges are reusable.
Grouting joints and finishing details: corners, windows, plinth
The quality of facade finishing with thermal panels largely depends on correct grouting of the joints and finishing of the details. Let us look at how to avoid freezing and make the facade neat.
When and how to grout the joints between thermal panels
Grouting of the joints is carried out 24–48 hours after installing the panels, once the adhesive foam has fully cured and the panels are fixed. For clinker thermal panels, cement or epoxy grouts are used: the former are cheaper (from 800 KZT/kg in Almaty DIY stores), the latter are more resistant to moisture and UV but cost 2–3 times more. The joint width between panels is 3–10 mm — for residential houses in the city, the standard of 5–7 mm gives a neat grid and compensates for thermal expansion without the risk of cracking. The grout is applied with a rubber float, pressing it into the joint without voids, and after 15–20 minutes the excess is removed with a damp sponge in circular motions: you must not delay removal, because the compound sets within 30–40 minutes and leaves a whitish film that is then difficult to wash off.
Finishing of external and internal corners
External corners are finished with special corner thermal panels, which have an interlocking joint on both sides and ensure a neat abutment without trimming. Such panels are produced for standard 90° angles and supplied in the same collection as the main ones — for example, Cerrad or Stroeher ranges include corner elements with clinker of the same texture and colour. If corner panels are not used, cutting the clinker tiles at 45 degrees requires a diamond disc on a cutting machine and produces more joints that need to be sealed with facade sealant. At internal corners, a joint between two panels with subsequent sealing is sufficient — the risk of freezing is lower here, but the joint must be filled with a frost-resistant compound. Local installers additionally fit a perforated corner bead under the grout on external corners — this protects the edge from chipping under mechanical loads and extends the service life of the finish.
Finishing of window and door reveals
Window reveals are finished with additional elements — special reveal panels or by trimming the main panels with the installation of drip sills to divert water. The thickness of the reveal panel is selected to match the depth of the opening: for a standard window (opening of 150–170 mm), panels 60–80 mm thick are used to preserve thermal insulation without thickening the reveal. The drip sill is installed with a slope of 5–10° away from the window and fixed with expanding foam or dowels — its width must overlap the clinker layer by 20–30 mm. The upper drip sill must protrude beyond the facade plane by 30–40 mm and have a drip edge — otherwise rainwater will run down the facade, leaving dirty streaks on the clinker, which are especially noticeable on light-coloured panels after Almaty's dust storms.
Finishing of the plinth and junction with the blind area
The plinth course of thermal panels is installed with a setback of 5–10 cm from the blind area, and the lower edge is covered with a plinth flashing to protect against moisture and snow. For the plinth, thermal panels with extruded polystyrene (XPS) are usually used - it is denser than EPS (35–45 kg/m³ versus 20–25 kg/m³) and does not absorb moisture on contact with the ground. The plinth flashing - galvanised steel or aluminium with a polymer coating - is fixed to the panels before the blind area and secured with screws in the upper part so that water runs down the flashing rather than under it. The junction with the blind area is the most vulnerable point of the facade: if the flashing is not installed, meltwater in spring flows under the panels, causing freezing and peeling of the coating, and because of Almaty's temperature swings (night frosts down to -15°C) this process is 2–3 times faster than in regions with a stable climate.
Sealing joints and abutments: how to avoid cold bridges
Sealing the joints is done with a special facade sealant (silicone or polyurethane) or low-expansion polyurethane foam — this prevents draughts and freezing. High-expansion foam (up to 30–40% of its volume) can deform the panel or push it out of plane, so for thermal panels compounds with expansion of no more than 10–15% — are used, for example Tytan Professional 65 or Soudal Soudafoam. Joints where the panels meet windows, doors and corners are additionally taped with a vapour-permeable tape (PSUL) on the outside and a vapour barrier on the inside — this prevents moisture condensation inside the wall. Particular attention is paid to abutments to windows, doors and corners: these are where cold bridges most often occur, and they can be detected with a thermal imaging camera after the first heating season — the typical temperature in such zones is 5–8°C lower than on the main plane of the facade.
Common mistakes when installing thermal panels and how to avoid them
Even high-quality facade thermal panels will not deliver results if mistakes are made during installation. Let us look at the most common problems on Almaty sites and how to prevent them.
Improper substrate preparation: uneven walls and old decor
The most common mistake is installing thermal panels on an unprepared base: uneven walls with height differences of more than 10 mm, old plaster or peeling paint. On houses built in the 70-80-s, there is often a thick layer of cement plaster here that begins to come away from the blocks after 10-15 years - if the panels are fixed directly onto it, the whole structure will fall off in pieces. Before starting work, we always tap the walls with a hammer: a dull sound indicates voids that need to be knocked off down to a solid base. If the wall is not levelled, the panels will not fit tightly, moisture will get into the gaps, and at sub-zero temperatures it will freeze and tear the coating off.
Wrong installation sequence: where to start and how to join
Installation always starts from the corner of the building and proceeds from left to right, bottom to top — violating this order leads to mismatched joints and crooked rows. In real practice, we have seen facades where the installers started from the middle of the wall and arrived at the corner with a gap of 15 mm, which had to be covered with a trim strip — this is both unsightly and creates a thermal bridge. When joining the panels, gaps of more than 2 mm must not be allowed — otherwise wind will blow into the gap, and the sealant will eventually crack due to vibrations and seasonal movement of the wall. At every joint, we check the gap with a feeler gauge and, if necessary, trim the panel with a fine-tooth jigsaw.
Incorrect fasteners: screws, dowels and fastening spacing
Using short screws (less than 80 mm) or unsuitable dowels for aerated concrete is one of the main causes of panels coming off under wind load. In Almaty, where spring squalls reach 25 m/s, skimping on fixings is especially dangerous: we know of a case where panels were torn off a private house in the Duman district after six months precisely because the screws penetrated the aerated concrete by only 30 mm instead of the required 50. The fixing spacing should be no more than 40 cm around the perimeter of the panel and 60 cm in a staggered pattern at the centre — saving on fixings results in facade deformation within a year or two.
Ignoring temperature gaps and expansion joints
When installed in hot weather, the panels expand, and in winter they contract — if a temperature gap of 3–5 mm is not left between the panels, in summer they will develop a "wave" pattern, and in winter cracks will appear in the clinker layer. On Almaty projects with temperature fluctuations from -25 in winter to +40 in summer, this mistake is especially evident: on one house in the Alatau district, the facade simply bulged in the sun because the panels were laid butt-jointed in the July heat. Expansion joints on long facades (more than 6 metres) are essential — they are filled with an elastic sealant that retains its mobility during temperature fluctuations.
How to fix installation errors without dismantling the entire facade
Minor defects — gaps up to 5 mm, chips in the clinker, local detachment — are repaired without dismantling: gaps are filled with facade sealant on a silicone base, chips are masked with tinted grout matching the main panel. If, however, a panel has pulled away from the wall by more than 10 mm, it will have to be removed and reinstalled — you cannot simply "pull it back" with a screw, as the insulation will be crushed and lose its thermal insulation properties. In our practice, there was a case where the owner of a house in the Ainabulak district tried to pull back a detached panel with a long screw — over the winter, ice formed in that spot, and three neighbouring panels had to be replaced.
Conclusion
Facade cladding with thermal panels solves two tasks at once — insulation and decorative finishing. But the result depends on following the technology at every stage. Here are the key principles worth remembering.
Key takeaways
- Base preparation is the foundation of durability: the walls must be flat (deviations of no more than 10 mm), cleaned of old decoration and treated with primer.
- Choosing insulation — PUR or EPS: PUR is more expensive but stronger and more durable; EPS is cheaper but requires careful handling and protection from UV.
- The installation technology follows the rules strictly: battens are only needed for wooden walls; on concrete and brick the panels are fixed directly with a spacing of 40–60 cm.
- Junctions and details are an area requiring extra attention: windows, corners, the plinth and joints require sealing and the installation of accessory elements, otherwise thermal bridges are inevitable.
- Typical mistakes - forewarned is forearmed: incorrect fasteners, ignoring temperature gaps and breaking the installation sequence negate all the advantages of thermal panels.