How to clad a house with corrugated sheet: a step-by-step guide from material selection to final finishing
Cladding a house with corrugated sheeting is a technological way to protect the facade and give the house a modern look. The process includes choosing the sheet grade (C-8, C-10 or C-21), installing the frame, insulating with a ventilation gap, fastening the sheets with self-tapping screws and installing the trim elements. The main thing is to observe the batten pitch and not to skimp on ventilation.
Which corrugated sheet to choose for cladding a house
Facade finishing with corrugated sheeting is a common question, so let us look at it in detail. We will examine the three main grades of wall corrugated sheeting — C-8, C-10 and C-21 — — and the types of coating, so that you can choose the best option for your facade.
Wall corrugated sheet grades: C-8, C-10 and C-21
For cladding the walls of a private house, three main grades of wall corrugated sheet are used — C-8 with a corrugation height of 8 mm, C-10 with a height of 10 mm and C-21 with a height of 21 mm, and the choice depends on the wind load and the requirements for facade rigidity. C-8 — is the lightest and most economical option (from 3200 KZT per sheet at a thickness of 0,4 mm), but due to its shallow corrugation it requires battens with a 300–400 mm spacing and holds its shape poorly in wind gusts above 15 m/s — in exposed locations the sheet may “move” and create a humming noise. C-10 with a 10 mm corrugation and a thickness of 0,45–0,5 mm is the golden mean: battens at 400–500 mm spacing, its rigidity is sufficient for most two-storey cottages. C-21 with a 21 mm corrugation and 0,5–0,7 mm metal is the strongest option (from 4800 KZT per sheet); it is used on plinths and in areas with strong winds. Before purchasing, check the wind rose on the plot: for flat areas C-10 is sufficient, while on elevated ground it is better to take C-21.
Comparison of corrugated sheet grades for facades
| Parameter | From -8 | From -10 | From -21 |
|---|---|---|---|
| Wave height | 8 mm | 10 mm | 21 mm |
| Recommended metal thickness | 0,4–0,5 mm | 0,4–0,5 mm | 0,45–0,7 mm |
| Batten spacing | 300–400 mm | 400–500 mm | 500–700 mm |
| Wind load | Low / medium | Medium | High |
| Typical application | Utility buildings, fences | House facades, garages | Facades in windy areas, plinth |
For regions with strong winds (from 6 points and above), it is better to choose C-21 or, at minimum, C-10 with a metal thickness of 0,5 mm — this will reduce the risk of sheet deformation.
Types of corrugated sheet coating: galvanising, polyester, Pural
Corrugated sheeting for facades comes in three main versions — galvanised without coating, with a polyester polymer coating and with a reinforced Pural coating, and for a residential house polyester 25–35 µm thick is optimal. Galvanising (class 1 — 275 g/m² of zinc) costs 20–30% less than polymer equivalents, but on a south facade with 300 sunny days a year it dulls within 3–5 years and leaves white streaks from condensation at the cut edges. Polyester 25–35 µm thick gives a glossy surface resistant to UV for up to 10–12 years, available in 30+ RAL colours at an average price of 4500–5500 KZT per 2 m sheet. Pural (polyurethane with acrylic, 50 µm) costs 30–40% more — from 6500 KZT per sheet — but withstands scratches from branches and hail, and its service life reaches 20–25 years. When ordering corrugated sheeting with a polymer coating, ask for a certificate of compliance with the UV-resistance class — cheap 20 µm polyester fades within 2–3 seasons.
Which metal thickness to choose for the facade
For the facade of a residential house, the optimal metal thickness of the corrugated sheet is 0,5 mm: it provides sufficient rigidity of the sheet without excessively weighing down the structure and overpaying. A thickness of 0,4 mm (15–20% cheaper than 0,5 mm) is acceptable only for C-21 with frequent battens and in the absence of strong winds — in exposed locations 0,4 mm sheets can deform in the first hurricane, and they are harder to fix without “waves”. 0,45 mm metal is a compromise for C-10 on single-storey houses in sheltered yards where there are no draughts or tall fences. A thickness of 0,7 mm is excessive for walls: it increases the weight per square metre to 8–9 kg (versus 5–6 kg for 0,5 mm), requires a reinforced frame and costs 40–50% more, so it is used only on plinths or roofs. If the facade faces north with frequent rains, choose 0,5 mm with 275 g/m² zinc coating — this will prevent corrosion at the cut edges where the screws are fixed.
The frame for corrugated sheet: batten and wall preparation
Installing corrugated sheeting on a wall is a common question, so let us look at it in detail. The right frame is the basis of a durable facade. Let us look at what to make the batten from, at what spacing, and how to prepare the walls before installation.
Preparing the walls before cladding with corrugated sheet
Before installing the frame, the walls are cleaned of flaking plaster, old paint and mould, and wooden surfaces are treated with an antiseptic — this will prevent rotting under the cladding. On brick and aerated concrete walls we apply a deep-penetrating primer, and traces of efflorescence (white salt streaks) are washed off with a special solution — otherwise the salt will continue to destroy the masonry under the corrugated sheet. All cracks wider than 3 mm are cut open and filled with cement mortar, and at the junction of the foundation and the wall a cut-off waterproofing layer of roofing felt is laid, since capillary suction of ground moisture rises up to a metre up the wall. Wooden walls are additionally checked for damage by wood-boring beetles: damaged areas are cut back to healthy wood and impregnated with an insecticidal compound. If the walls have differences of more than 20 mm per 2 metres, they are levelled with plaster or adjustable brackets are used — otherwise the corrugated sheeting will lie in waves, and this cannot be corrected without dismantling.
What to make the batten from: metal or wood
For the frame under the corrugated sheet, either timber with a cross-section of 40×40 or 50×50 mm is used, or a metal profile for plasterboard CD 60×27 —, and metal is preferable due to the stability of its geometry and its durability. A wooden batten frame is cheaper (timber — about 600–800 KZT per 3--metre piece versus 1200–1500 KZT for a metal profile), but it requires perfectly dry material — timber of natural moisture content will dry out already on the wall and will distort the corrugated sheet within 3–5 years. A metal profile does not absorb moisture, does not warp with temperature changes and is installed faster — with self-tapping screws for metal through U-shaped hangers at 600 mm spacing. For an insulated facade we use a combination: a vertical metal frame and 40×20 mm timber counter-battens for the ventilation gap. Timber is acceptable only on unheated buildings and exclusively kiln-dried with a moisture content of no more than 18% —; it must be fixed to the wall with galvanised screws at least 70 mm long.
Batten spacing for different grades of corrugated sheet
| Corrugated sheet grade | Batten spacing (main field) | Batten spacing (corners/windows) |
|---|---|---|
| From -8 | 300–400 mm | 250–300 mm |
| From -10 | 400–500 mm | 300–400 mm |
| From -21 | 500–700 mm | 400–500 mm |
At the corners of the building and around windows, the spacing is reduced by 100–150 mm from the standard — in these areas the wind load is higher and the sheet may vibrate, creating noise in gusts. In areas with open wind load (fields, foothills) we recommend taking the lower limit of the spacing range — this will eliminate the flapping of the corrugated sheet in the transitional seasons.
How to set the batten level correctly
The battens are set strictly vertically with every element checked with a level, starting from the corners of the building and using a plumb line or a laser level for a single plane. First we stretch two cords along the diagonals of the wall — they will show where the wall is out of plumb and allow us to determine the thickness of the levelling shims. On brick houses, corner deviation of 15–30 mm is common — such differences are compensated with adjustable U-shaped hangers at a pitch of 400–500 mm vertically. We secure each batten first by its top end, set it with a plumb line, then pull the bottom one tight — there should be no gap between them when a two-metre straightedge is applied. If the wall is uneven, adjustment plates are placed under the timber or profile — this allows all battens to be brought into a single plane, after which the final plane is checked with a straightedge horizontally, diagonally and vertically.
Insulation and wind protection under corrugated sheet
Facade insulation under corrugated sheeting is not mandatory but desirable, making the house warmer and protecting the walls from freezing. We will go through the correct insulation technology and why a ventilation gap is needed.
Should the facade under corrugated sheet be insulated
A facade under corrugated sheeting needs insulation if the house is built of aerated concrete, expanded clay block or wood less than 400 mm thick — without insulation the walls will freeze and the dew point will shift into the structure. For aerated concrete of density D400-D500, a thickness of 300 mm without insulation gives heat losses of about 35% through the walls according to SNiP RK 2.04-21-, making the house cold in Almaty winters with frosts down to -25°C. For brick walls from 500 mm thick, insulation is not mandatory, but it reduces heat losses by 20–30% and eliminates freezing in the corners — especially relevant for regions with cold winters. If the house is already heated, put your palm to the inner wall in frost: if you feel cold, insulation is needed, no question about it.
Which insulation to choose: mineral wool or polystyrene
For a facade under corrugated sheet, mineral wool with a density of 35–50 kg/m³ is best suited — it is vapour-permeable, does not support combustion and does not settle when installed vertically. Mineral wool slabs such as Rockwool Facade Batts or Technofas Optima are installed in compression between the frame posts and fixed with disc dowels — at “TD Stroymart” and “Asia Stroy Komplekt” such material is sold at 5000–8000 KZT per m³. Expanded polystyrene is 30–40% cheaper than mineral wool, but it is vapour-tight — when it is used, an enhanced ventilation gap (at least 40 mm) is essential, otherwise condensation will accumulate under the cladding. In practice, mineral wool pays for itself within 2–3 heating seasons thanks to the heat retained, whereas expanded polystyrene does so only with ideal ventilation, which beginners often get wrong.
Windproof membrane: purpose and fixing
The windproof membrane is fixed over the insulation with a 100–150 mm overlap, secured to the battens with a construction stapler — it protects the insulation from being blown out and from moisture ingress, but lets vapour escape outwards. Popular options in Almaty building supply stores are Izospan A or Tyvek Solid: they cost 200–400 KZT per m² and are fixed with the logo facing outwards so the sides are not confused. The membrane is stretched in horizontal strips from bottom to top, sealing the joints with special tape — this eliminates cold bridges through which the insulation loses up to 30% of its efficiency. Ordinary polyethylene film is not suitable for windproofing — it does not let vapour through, and the insulation beneath it will become damp, losing its thermal insulation properties by up to 50% in the first season.
Ventilation gap between the insulation and the corrugated sheet
A ventilation gap between the insulation and the corrugated sheet is essential — its minimum size is 20–30 mm, and it is provided by counter-battens fixed over the windproofing perpendicular to the main battens. For the counter-battens, a 40×20 mm or 50×30 mm timber batten is used with a vertical spacing of 500–600 mm — such timber costs 300–500 KZT per piece, and it can be fixed with 4,2×51 mm wood screws. If the ventilation gap is absent or smaller than 20 mm, condensation will accumulate on the inner side of the corrugated sheet, causing corrosion of the metal and wetting of the insulation — this is the most common cause of problems with a corrugated sheet facade. When installing in areas of high humidity (next to a swimming pool or a wet facade), the gap is increased to 40–50 mm — this reduces the risk of corrosion of the corrugated sheet to zero even with Almaty's fogs and precipitation.
How to clad a house with corrugated sheet — step-by-step instructions
We move on to the main stage — installing the corrugated sheeting on the wall. We will go through it step by step: from cutting the sheets to fixing them with self-tapping screws, with an analysis of the typical mistakes beginners make.
Calculating the amount of corrugated sheet and trims
The amount of corrugated sheet is calculated as the facade area minus the area of windows and doors, plus 10–15% for overlaps and cutting — a house 10×10 m with a wall height of 3 m will require approximately 110–120 m² of sheets. The area of each slope is calculated separately: for a gable roof, the width of the gable is multiplied by the height and divided in half; for complex configurations with bay windows, the facade is broken down into rectangles and triangles. Trim accessories are calculated along the perimeter: corner strips — by the height of each external and internal corner, drips — by the length of the plinth, architraves — by the perimeter of each window and door opening. The starter strip, which sets the lower level of the cladding, runs along the entire perimeter of the walls, and the J-profile runs along the top edge if an eaves overhang is not planned. Trim accessories are ordered with a 5–10% allowance for joints and cutting — for a house 10×10 m with four corners, about 48 linear metres of corner strip are used, 12 m for each corner.
Cutting corrugated sheet: what to use and how to do it correctly
Corrugated sheeting is cut with tin snips or a jigsaw with a fine-tooth metal blade — an angle grinder with an abrasive wheel overheats the metal, destroying the polymer coating in the cut zone. Tin snips are convenient for longitudinal cutting: the right cut is made along the marking, the left along a guide, so as not to bend the edge. A jigsaw handles cross cuts faster, but a flat board or plywood must be placed under the sheet — otherwise the blade tears the edge on exit, leaving burrs. A hand electric shear (for example, Rebir EK-700) gives a clean cut without burrs along any line, including curved ones — for going around windows and doors this is the optimal tool. If you cut with an angle grinder, scale forms at the cut site, which quickly rusts, and after 1–2 years reddish streaks appear around the cut — this is not a cosmetic defect but the start of corrosion.
Fixing corrugated sheet to the wall with self-tapping screws
The corrugated sheeting is fastened to the batten with roofing self-tapping screws 4.8×28 mm with a rubber gasket (EPDM), screwing them strictly into the bottom wave of the sheet at a right angle — this ensures a tight fit without deforming the metal. The screw is driven with a screwdriver at medium speed: if the speed is too high, the gasket overheats and loses its elasticity; if too low, the drill bit does not pass through the metal and strips the slot. The screw length is selected so that it enters the batten by at least 15–20 mm: for 40×40 mm timber, 28 mm is enough; for a 0.7 mm metal profile, 19 mm. Each square metre of facade takes 6–8 screws: at the edges of the sheet — at a pitch of 300 mm, in the centre — every 500 mm. Screws with ordinary rubber (without EPDM) harden in frost after 2–3 years and crack, breaking the seal — use only screws with an ethylene-propylene seal, which stays elastic down to −40°C.
Self-tapping screw spacing and layout pattern
The screw fastening pitch at the edges of the sheet is 300 mm, in the central part — 500 mm, and each sheet is fixed in at least three rows vertically: along the bottom wave, along the top and in the middle. The first screw is driven into the top left corner of the sheet, then every 300 mm along the left edge, after which the right edge and the central zone are fixed at a pitch of 500 mm. Along the bottom row of sheets that touch the plinth, the pitch is reduced to 200–250 mm — this compensates for the wind load, which is highest at ground level. If the sheet is longer than 3 m, an intermediate row is added between the main ones — the total number of fastening points on such a sheet reaches 30–35. If screws are driven into the top wave, a dent forms under the head that eventually breaks through the coating — fastening must be done only into the bottom wave, where the sheet fits tightly against the batten.
Joining corrugated sheets horizontally and vertically
Corrugated sheets are joined with overlaps: vertically by one corrugation, horizontally by 100–150 mm, with the horizontal overlap additionally sealed with sealant or fitted with a sealing tape. The vertical overlap (along the corrugations) does not require sealant if the sheets are installed on a wall with a slight slope — water runs down the profile without entering the joint. The horizontal overlap is arranged so that the upper sheet overlaps the lower one by 100–150 mm, and the joint falls on the batten — for this, when cutting, the position of the joint line is calculated in advance and a horizontal timber is placed underneath it. Sheet joints at the corners of the building are made with a corner trim that covers the end of the corrugation and diverts water — without the trim, the open cut gets wet and corrodes first. If the sheets are installed butt-jointed without an overlap, snow will blow into the gaps and rain will seep in — over time this will lead to wetting of the insulation and corrosion of the sheet edges.
Fixing corrugated sheet with rivets: an alternative method
Fixing corrugated sheet with rivets is possible, but only as additional fixing — for example, to join sheets together or in places where it is inconvenient to work with a screwdriver, while the main fixing to the battens is still done with self-tapping screws. Aluminium or galvanised steel blind rivets (4.8×12 mm) are installed with a rivet gun, which draws the mandrel and flattens the sleeve on the reverse side — this creates a neat joint without protruding heads. Rivets are placed with a 300–400 mm spacing along the joint line, after pre-drilling a hole with a 5 mm metal drill bit. On facades, rivets are mainly used to fix trim accessories — corner strips, drips, architraves — where a self-tapping screw looks rough or interferes with the geometry of the part. Rivets do not provide the same clamping force as self-tapping screws and may loosen over time from vibration — on a facade they are used only in combination with self-tapping screws, not replacing the main fasteners.
Additional elements and complex facade units
Trim accessories are not just decoration but protection of the facade from water and wind at the most vulnerable points. Let us look at how to install corners, drips, architraves correctly and how to work around windows.
Which additional elements are needed for a corrugated sheet facade
A corrugated sheet facade requires a standard set of trim accessories: external and internal corner strips, a plinth drip, window architraves, reveals and a finishing strip for the top edge of the wall. Corner strips are produced 2–3 metres long from 0,4–0,5 mm galvanised steel with a polymer coating to match the colour of the corrugated sheet — they are fitted on every vertical corner of the house. The plinth drip is an L-shaped strip 50–150 mm wide beneath the bottom row of corrugated sheet, which diverts rainwater away from the foundation, while window architraves (flat, 60–200 mm wide) frame the opening on the outside. Reveals are closed with L-shaped or U-shaped profiles, and a finishing strip 30–50 mm wide is fixed along the top edge of the wall under the eaves overhang. Many save on trim accessories by closing the corners with simple offcuts of corrugated sheet — this is a mistake: snow is blown into the gaps, and within a year or two the corners of the house freeze through and rust appears at the joints.
Installation of external and internal corners
External corners are covered with a corner trim, which is fixed with screws at a spacing of 300–400 mm to the batten through both flanges, while internal corners are covered with a similar trim but with preliminary cutting at 45° at the vertical joints. For a typical facade 3–4 metres high, one trim 2,5 metres long is not enough — two are joined with an overlap of 50–70 mm and the joint is sealed with silicone sealant; the screws on the corner trims are placed in a staggered pattern so as not to damage the polymer coating. Before installation, the trim is cut with tin snips at a spacing of 100 mm to the exact size from the plinth to the cornice, and at the joints with an overlap of 50–70 mm it is always sealed with sealant — otherwise water seeps into the joint and runs down the corner into the facade.
Going around windows and doors when cladding with corrugated sheet
Windows and doors are framed with corrugated sheeting trims, which are fastened over the main sheet with an overlap of 30–50 mm, and the reveals are closed with L-shaped strips tucked under the trim. The trim is installed around the perimeter of the opening: first the top horizontal strip, then the side ones, which overlap it from above by 20–30 mm — this way water does not seep into the joint. The reveals are made from L-shaped strips 100–200 mm wide: one leg is fastened to the wall inside the opening, the other to the batten outside, and the joint with the trim is sealed with sealant; for doors the bottom strip is replaced by a threshold or plinth flashing that covers the gap between the door and the facade. If the window is shallow (less than 100 mm from the facade plane), the reveals can be omitted — a trim is enough, as it will cover the end of the corrugated sheet and the gap between the sheet and the window frame.
Plinth flashing and protection of the lower part of the facade
The plinth flashing is installed in the lower part of the facade with a slope away from the wall of 10–15°, tucking the top leg under the corrugated sheeting by 30–50 mm and the bottom one onto the plinth, fastened with self-tapping screws at a pitch of 400 mm. The flashing is installed before the first row of corrugated sheeting: first it is set with a level at a slope of 10–15°, then fastened to the batten through the top leg, while the bottom one is left free to drain water; for a plinth 300–600 mm high, a flashing 100–150 mm wide is used, and for tall plinths (from 700 mm) — 200–250 mm wide with additional fastening of the bottom leg with dowels. Joints between flashing sections are made with an overlap of 50–70 mm and sealed with sealant — especially at the corners, where the flashing is cut at 45°. If the flashing is not installed, rainwater runs down the corrugated sheeting straight onto the plinth and foundation, causing the blind area to get wet and the plinth finish to break down — especially critical for houses without foundation waterproofing.
Top edge of the facade and the junction with the roof
The top edge of the corrugated sheet is closed with a finishing strip or an eaves drip, which is fixed to the battens through the top corrugation of the sheet — this prevents snow and rain from being blown under the cladding from above. The finishing strip is installed after the last row of corrugated sheet: its upper flange is tucked under the eaves overhang or roofing material, and its lower flange rests on the corrugated sheet, with a fixing spacing of 300–400 mm; for houses with a wide eaves overhang (300–600 mm), an eaves drip 200–400 mm wide is used, fixed to the battens through the top corrugation. If there is no overhang, the top edge of the corrugated sheet is closed with a finishing strip with a 50 mm overlap onto the sheet, and the joint is sealed with sealant. If the top edge of the corrugated sheet is left open, snow is blown into the gap between the wall and the sheet, and in spring it melts and runs inside the facade — the insulation gets wet, and damp patches appear on the walls.
Common mistakes when cladding a facade with corrugated sheet
Even with the right choice of material and insulation, mistakes at the installation stage negate all the effort — let us look at the four typical problems encountered on Almaty sites.
Incorrect calculation of the batten spacing
The most common mistake is setting the batten pitch for corrugated sheeting “by eye”, which makes the sheet sag between the supports and noticeable waves appear on the facade, especially on the sunny side. For wall corrugated sheeting of grade C-8, the batten pitch must not exceed 400 mm, for C-10 — 500 mm, for C-20 — 600 mm; exceeding the pitch by 100–150 mm already produces noticeable deformation of the sheet. The difference in load-bearing capacity between grades is significant: C-8 at a pitch of 500 mm sags by 2–3 mm under a wind load of 15 m/s, whereas C-20 withstands the same load at a pitch of up to 700 mm with no visible changes. For the Almaty climate with frequent winds up to 20 m/s, use a pitch of -10 mm for C400, not 500 — this gives a margin of strength and eliminates irreversible sagging on the south side of the facade after just one season.
Savings on windproofing and vapour barrier
Many DIY builders believe that corrugated sheeting by itself protects the wall from wind and moisture and skip the windproof membrane — this leads to the insulation being blown through and losing up to 30% of its thermal insulation properties. The Almaty winter with temperature swings from −15 °C at night to +5 °C during the day creates ideal conditions for condensation: without a vapour barrier on the room side, moisture from the warm air penetrates the insulation, and when it freezes it loses up to 40% of its thickness within the very first winter. Wind protection is essential even when the corrugated sheeting fits tightly — through the joints and the gaps under the fasteners, air penetrates inside, and without a membrane the insulation accumulates dust and moisture. During installation, be sure to unroll the membrane with the logo facing outwards: if the side is mixed up, vapour permeability drops by 70% and the insulation starts getting wet from the inside.
Fixing with self-tapping screws in the crest of the corrugation
Beginners often drive the screws into the crest (upper part) of the corrugated sheet corrugation, considering this more reliable — in fact, the fixing should be into the lower part of the corrugation, so the sheet fits more tightly to the batten and does not play in the wind. Fixing into the crest is acceptable only for roofing corrugated sheeting with a high corrugation (H-60 and above); on a wall with grades C-8–C-20 this leads to deformation of the sheet and the screw being torn out in a strong wind. Each square metre requires 6–8 screws — one per corrugation in a staggered pattern, and the point of driving must be strictly perpendicular to the batten. If it is driven at an angle, the rubber washer under the head wears out within a year, opening access for moisture to the batten.
Lack of compensation for thermal expansion
Metal corrugated sheeting expands when heated by the sun to +60 °C, and if the sheets are fixed rigidly without a gap at the joints, in summer they will start to buckle like a house roof, and in winter they will crack along the fixing line. The linear expansion of steel is 0,012 mm per metre per degree Celsius — for a three-metre sheet with a swing from −20 °C to +60 °C this gives a change in length of almost 3 mm. It is enough to leave a gap of 3–5 mm between adjacent sheets horizontally and not to drive the screws in all the way — the head should fall slightly short of the metal so the sheet can breathe. A simple test: after tightening, a sheet of paper should pass between the head and the corrugated sheeting — if it does not, the fastener is overtightened, and at the very first temperature change the sheet will deform at that point.
Conclusion
Cladding a facade with corrugated sheeting is a straightforward technology that, when the sequence is followed precisely, gives an even and durable covering without hiring a crew.
Key takeaways
- Choose wall corrugated sheet of grades C-8, C-10 or C-20 with a polymer coating — it is designed for vertical loads and does not deform in the wind.
- Make the battens strictly to the calculation — 400–600 mm spacing depending on the grade of corrugated sheet, otherwise waves will appear and the sheets will start to “move”.
- Do not skimp on wind protection — the membrane is essential even under corrugated sheeting, otherwise the insulation loses up to 30% of its effectiveness.
- Fix the sheets in the bottom corrugation with screws with a rubber washer, leaving a 3–5 mm gap for thermal expansion.
- Pay attention to the trim elements — corners, flashings and trims not only give the facade a finished look but also protect the joints from water and snow.