How to insulate an apartment from the outside: a step-by-step guide for Almaty residents

Reading time: 18 minutes
How to insulate an apartment from the outside: the facade of an apartment building in Almaty with workers installing insulation on the external wall

Exterior insulation of an apartment is the only way to shift the dew point into the thickness of the insulation and forget about freezing walls for good. In Almaty, for panel and brick buildings the optimal choice is expanded polystyrene (EPS-25) 50–100 mm thick and the “wet facade” technology. The main thing is to prepare the base properly and observe the temperature conditions during installation.

Why it is better to insulate an apartment externally rather than internally

Exterior insulation of an apartment: comparison of exterior and interior insulation using the example of a wall with a window

External insulation of apartment walls is a common question, so let's go through it in detail. We will explain why external insulation is the only correct solution from the point of view of building physics, and what happens if you insulate from the inside.

What the dew point is and why it matters when insulating

The dew point is the temperature at which moisture from the air begins to condense on the surface or inside the wall. With exterior insulation, this point shifts into the thickness of the insulation, and the wall stays dry and warm. In a typical panel nine-storey building in Almaty, a wall 40 cm thick freezes right through in winter — without insulation, the dew point is inside the room, on the inner surface of the wall. With exterior insulation using 50 mm of polystyrene foam in winter, the dew point ends up in the insulation layer, and the wall warms through its entire thickness. In corner apartments, which have two exterior walls, the difference is especially noticeable: without insulation the corner freezes through, and condensation forms once the surface reaches +5°C. If the wall is insulated from the inside, the dew point ends up inside the room — between the wall and the insulation — which is guaranteed to lead to damp, mould and gradual destruction of the wall.

What happens to the wall with interior insulation

With internal insulation, the wall remains cold and the dew point is located between the wall and the insulation — moisture condenses, the insulation gets wet and loses its thermal insulation properties, and mould appears on the wall. In panel buildings of series 1-464 with wall thicknesses of 35 cm, internal insulation with 30 mm polystyrene foam produces a wet wall within a single heating season — in January and February, condensation on the surface of the insulation reaches 1-2 mm per day. In such cases, mould appears at the junction between the insulation and the wall within 3-4 months, and the spores penetrate into the apartment through microcracks. Even a good vapour barrier does not fully solve the problem — the wall stops “breathing”, and the risk of fungus remains; the only way to avoid these consequences is to insulate the wall from the outside.

The three main advantages of external insulation

  • The wall stays dry: the dew point shifts into the insulation, condensation does not form inside the wall and does not destroy the concrete or brick.
  • The area of the apartment is not lost: the insulation is installed on the outside, so every centimetre remains inside — for a typical two-room flat this is 2-3 m² of usable area.
  • Thermal bridges are blocked: the outer layer of insulation covers the joints of the floor slabs and the corners through which up to 30% of the heat escapes in panel buildings.

Which insulation to choose for external wall insulation

Insulating a corner apartment is a common question, so let us examine it in detail. Let us look at the three main materials for exterior insulation — expanded polystyrene, extruded polystyrene and mineral wool — and help you choose the right one for your building.

Polystyrene (EPS) — the most popular facade material

Expanded polystyrene (EPS) with a density of 25–35 kg/m³ is the main material for insulating facades using the “wet facade” technology: it is lightweight, does not absorb moisture, has a thermal conductivity of 0,03–0,04 W/(m·K) and lasts 20–30 years. For walls above the plinth in panel and brick buildings in Almaty, EPS-25 — is used — it is strong and vapour-permeable enough for the wall to “breathe” and not accumulate condensation. EPS-35 is denser and is used on plinths and in damp areas (the blind area, the zone in contact with the ground), where increased mechanical strength is required. In local conditions, the difference between grades is critical: EPS-25 — must not be used on the plinth — it deforms under the load of the blind area and seasonal ground movement.

Extruded polystyrene (XPS) — for plinths and wet areas

Extruded polystyrene foam (XPS) has zero water absorption and a higher density than ordinary EPS — 30–45 kg/m³, so it is used to insulate plinths, blind areas and zones in contact with the ground. XPS is not recommended for walls above the plinth — its vapour permeability is practically zero, which breaks the principle that “a wall must breathe”: in a wet facade system, moisture from inside the building gets trapped under the insulation and causes the plaster to peel off. In Almaty, where winter temperature swings are frequent, this is especially dangerous — frozen water beneath the plaster layer produces cracks as early as the second season. Before installing XPS on a plinth, make sure waterproofing is laid between it and the wall — without it, capillary moisture from the ground will rise into the wall.

Mineral wool — a non-combustible alternative

Mineral (basalt) wool is the only non-combustible insulation of the three main types (NG group), so it is suitable for insulating wooden houses and buildings with increased fire safety requirements — for example, high-rises above 28 metres or houses with attics. The main drawback of mineral wool is its hygroscopicity: it requires reliable waterproofing and vapour barriers, otherwise it gets wet, loses its thermal insulation properties (thermal conductivity rises to 0,05–0,06 W/(m·K)) and settles by up to 10% over 5–7 years. For apartments in panel and brick buildings in Almaty, mineral wool is used less often than EPS — due to the complexity of installation and its higher price (by 30–40%). If you do choose mineral wool, take boards with a density of 80–100 kg/m³ — they do not slide down on a vertical wall.

Comparison of insulation materials: EPS, XPS and mineral wool

ParameterEPS -25EPS -35XPSMineral wool
Density, kg/m³253530–4580–150
Thermal conductivity, W/(m·K)0,035–0,040,03–0,0350,028–0,0320,035–0,045
Water absorptionLowLowZeroHigh
FlammabilityGroup G1–G3Group G1–G3Group G1–G3Non-combustible (NC)
ApplicationWalls above the plinthPlinth, wet areasPlinth, blind area, foundationWooden houses, frame walls
Service life20–30 years20–30 years30–50 years15–25 years

For panel and brick buildings in the city, EPS-25 50–100 mm thick is optimal — it offers the best combination of price, efficiency and durability.

What thickness should the insulation on apartment walls be

For the climate of Almaty (winter temperatures down to -20°C), the thickness of polystyrene foam for a panel wall is 80–100 mm, for a brick wall — 50–80 mm, and for corner and end apartments the thickness is increased by 20–30 mm to compensate for the freezing of two external walls. The exact calculation is made using a thermal engineering calculation taking into account the wall material, its thickness and the climatic zone — for Almaty the minimum wall heat transfer resistance is 2,5 m²·°C/W. In practice this means: if the wall is made of sand-lime brick 380 mm thick, EPS-25 should be taken at 80 mm, and if it is made of aerated concrete 300 mm — 50 mm is enough. For a corner apartment in a nine-storey panel building on the 2-th line on the windward side, take 120 mm — you are less at risk of 'crying' corners and mould.

How an apartment wall is insulated from the outside — the “wet facade” technology

Wet facade technology: applying adhesive to the insulation for exterior insulation of apartment walls

Insulating walls from the outside with polystyrene foam is a common question, so let us examine it in detail. The “wet facade” technology is a multi-layer system of insulation, adhesive, reinforcing mesh and finishing plaster that is fixed to the wall in a strict sequence. Let us go through each stage.

Substrate preparation — what needs to be done before installation

Before installing the insulation, the wall is cleaned of old paint, plaster and dirt, levelled where the differences exceed 10 mm and primed with a deep-penetrating primer. This ensures a reliable bond between the adhesive and the substrate. In Almaty buildings of series 1-464 (panel five-storey blocks), cement mortar often protrudes at the panel joints — it is knocked off with a chisel or hammer drill. If the wall was painted with oil paint, it is removed with a grinder fitted with a flap disc — otherwise the adhesive will not bond. Particular attention is paid to knocking off old plaster: if it is not firmly attached, the insulation will eventually fall off along with it. The strength can be checked by tapping: a dull sound indicates detachment.

Installation of the plinth profile and the first row of insulation

The plinth profile is installed along the lower boundary of the insulation — it serves as a support for the first row of boards and protects the edge of the insulation from moisture. The profile is fixed with dowels strictly level, using a spirit level or a laser level. The fixing spacing is 30–40 cm, and at the corners of the building every 20 cm. In buildings with a high plinth (for example, series 1-464A), the profile is installed 50–100 mm above the blind area so that rainwater does not run under it. The first row of insulation boards is installed with staggered joints — like brickwork. The vertical joints of adjacent rows must not coincide, otherwise through gaps form — thermal bridges.

Fixing the insulation — adhesive and disc anchors

The insulation boards are fixed with adhesive (Ceresit CT-83, Knauf or equivalent), applied around the perimeter of the board and in spots in the centre — this method ensures even contact. After the adhesive dries (after 1–3 days, depending on humidity), the boards are additionally secured with anchor dowels. The number of dowels is 5–8 per square metre, and at corners and around the perimeter of the building — up to 10. In panel walls 350 mm thick, dowels 100–120 mm long are used so that the anchor penetrates the concrete by at least 50 mm. The dowel is driven in so that its head is countersunk flush with the insulation — protruding heads will create bumps under the reinforcing layer. At the joints of the boards (every 2–3 metres vertically) expansion joints 3–5 mm wide are left, which are filled with expanding foam — otherwise the boards will crack with temperature changes.

Reinforcement with mesh and application of the base coat

After the insulation is fixed, a first layer of adhesive is applied to it, into which a facade mesh of alkali-resistant glass fibre with a density of 140–160 g/m² is embedded. The mesh is laid with an overlap of 10–15 cm, with particular care taken to reinforce corners and reveals. In Almaty buildings with bay windows (for example, series 1-439A), each external corner is reinforced with a corner profile with mesh — otherwise the plaster on the protruding elements will crack within a year. The mesh must not lie directly on the insulation — it is embedded in the adhesive layer 1–2 mm from the surface. If the mesh protrudes, it is covered with a second layer of adhesive, and the total thickness of the base layer is 3–5 mm. After drying (2–3 days), the surface is sanded with a float and sandpaper to remove irregularities.

Final finishing — plastering and painting the facade

The finishing layer is facade plaster (for example, “bark beetle” with a 2 mm grain or “pebble”) and facade paint. The plaster is applied after the base layer has fully dried, after 3–7 days. The paint chosen should be vapour-permeable, acrylic or silicone — so that the wall “breathes” and does not accumulate moisture inside the system. In Almaty, where there are up to 30 freeze-thaw cycles in winter, silicone paint lasts 3–5 years longer than acrylic. Insulating an apartment on the first or second floor yourself is realistic — from the ground or from a stepladder. The upper floors will require an industrial climber: working at height with a facade system requires skills and safety equipment, and a mistake in reinforcing the corners at a height of 15 metres will cost more than hiring a crew.

Specifics of insulating a corner apartment and upper floors

Insulating a corner apartment: the exterior corner of the building with a reinforced insulation layer and finishing

Corner and end apartments, as well as premises on the top floors, lose 20–40 % more heat than standard ones. Let us look at the technology for insulating such walls and the nuances to take into account.

Why a corner apartment freezes more

A corner apartment has two exterior walls that are exposed to cold air on two sides — this is a natural thermal bridge, because of which the temperature in the rooms is 2–4 °C lower than in apartments in the middle of the building. In panel buildings of the 1-464 and 1-335 series, the walls of corner apartments are often 30–40 cm thick, and in winter the corners freeze right through, especially with temperature swings from –25 °C to +5 °C in a single day, which is typical of an Almaty winter. Because the corners freeze through, mould appears regularly in such apartments — the fungus attacks the wallpaper and plaster, and without exterior insulation it returns after every treatment with antiseptic. Exterior insulation solves both problems: the wall becomes warm, the dew point moves outside, and the mould disappears without additional treatment — it is enough to install 80–100 mm of insulation.

Technology for insulating a corner apartment

For a corner apartment, the insulation thickness is increased by 20–30 mm compared with the standard calculation — if 50 mm of polystyrene is enough for an ordinary apartment, then 80–100 mm is used for a corner one, with particular attention paid to the wall junction, where the boards are installed with an overlap so that the joint does not coincide with the wall junction line and does not form a through thermal bridge. On end walls, the boards are additionally bonded over the entire area with reinforcing mesh overlapping 10–15 cm onto the adjoining wall — this prevents cracks at the corners under temperature deformations typical of winters with swings of up to 30 °C per day. In buildings with a ventilated facade, the insulation is fixed with disc anchors at a spacing of 25 cm at the corners versus 40 cm in the centre, and if the facade is already finished with porcelain stoneware or siding, insulating just one wall is problematic — part of the finish at the junction would have to be dismantled, so it is best to insulate both walls of a corner apartment at the same time.

Insulating the end wall — what you need to know

An end wall is an exterior wall facing the end of the building, which is not protected by neighbouring apartments and is exposed to cold air over its entire area — heat loss through it is 2–3 times higher than through a facade wall, especially in panel buildings of the P-44 series with end walls 30–35 cm thick and numerous vertical panel joints. Insulating the end wall gives the greatest effect in reducing the apartment's overall heat loss — after installing 80–100 mm of insulation, the room temperature rises by 3–5 °C, and heating bills with individual metering drop by 25–35 %. Before insulating, the condition of the inter-panel joints must always be checked — if they are damaged, they are first sealed with expanding foam or a thiokol sealant, otherwise the wind will blow through the gaps and the insulation will not deliver its full effect even at the correct thickness.

Access via industrial climbing for upper floors

To insulate walls on floors above the 2–3th floor, industrial climbers are used — they descend from the roof on a safety system and carry out all stages of the wet facade at height: from priming the wall to applying the finishing plaster, using a winch to lift bags of adhesive and insulation boards. Erecting scaffolding for the upper floors is unjustifiably expensive — renting scaffolding for a building 9 storeys high costs 150–200 thousand KZT per month, while climbing work costs 15–25 thousand KZT per shift, making rope access the only economically justified way to insulate the upper floors of high-rise buildings in Almaty. On the upper floors, the roof parapet is additionally insulated — the area where the wall meets the roof, through which heat often escapes, especially in buildings with a flat roof of Soviet construction — and this section requires separate sealing with bitumen-polymer mastic before the insulation is installed.

Insulating a first-floor apartment — specifics with the blind area and plinth

When insulating the wall on the ground floor, the insulation is brought 30–50 cm below the level of the blind area to prevent the ground beneath the foundation from freezing — XPS or EPS-35 is used for this zone, as they are resistant to moisture and the mechanical loads caused by ground heaving, and in houses with a basement the plinth section is insulated over its full height with 50–100 mm thick boards with waterproofing. The blind area can also be insulated — this reduces heat loss through the floor and foundation by 15–20 %: XPS boards 30–50 mm thick are laid under a concrete or tiled blind area with a slope of 2–3° from the wall to drain water, which is particularly important for houses on a strip foundation without a basement. In houses without a basement, the insulation is brought 50–60 cm below ground level by digging a trench along the wall — this prevents the floor from freezing in winter and the formation of condensation at the junction between the wall and the floor, which often causes skirting boards and flooring to rot.

Is approval required and what mistakes are made most often

Insulating the facade of a multi-apartment building changes the outward appearance of the building, which requires official approval. And mistakes during installation can nullify all your efforts and lead to costly rework.

Is a permit required to insulate an apartment externally in Kazakhstan

Yes, in Kazakhstan a permit is required to insulate the facade of an apartment building — this is not a private matter for a single owner. The procedure includes coordination with the KSK or OSI (the building's management body) and obtaining permission from the akimat to change the external appearance of the building, since the facade is considered the common property of all residents. Particularly strict requirements in Almaty apply to buildings in the historic centre (Panfilov Street, Kabanbay Batyr Street and the UNESCO zone) and to listed architectural monuments — there any change to the facade is prohibited without a separate architectural opinion. Without approval, the insulation may be deemed unauthorised remodelling, and you may be required to dismantle the structure at your own expense and restore the facade to its original condition.

How to get insulation approved — a step-by-step procedure

  • Residents' meeting: hold a general meeting and obtain the written consent of at least 2/3 votes of the apartment owners — without this the akimat will refuse.
  • Insulation design: order a thermal engineering calculation from a licensed organisation indicating the insulation thickness, type of fixings and the colour scheme of the facade.
  • Application to the akimat: submit a set of documents (meeting minutes, design, copies of the apartment documents) via the PSC or the eGov portal to change the external appearance of the building.
  • Work permit: obtain the official document, after which installation can begin strictly according to the design — any deviation risks the permit being revoked.
  • Connecting to neighbours: if the neighbours have already insulated the facade, use their design documentation — this will shorten the approval process and guarantee a uniform facade style.

The five most common insulation mistakes and their consequences

  • Incorrect insulation thickness: the dew point remains inside the wall, condensation destroys the load-bearing structures, and there is no benefit from the insulation — the wall gets as cold as it was before the work.
  • Poor wall preparation: old plaster, paint or whitewash peel off together with the insulation after 1–2 seasons, especially on south-facing facades, where temperature fluctuations are greater.
  • Saving on dowel anchors: if the boards are fixed with adhesive only, they fall off under their own weight after 2–3 years — polystyrene foam needs at least 5 dowels per square metre, and mineral wool 8–10.
  • Lack of bonded joints: through vertical gaps between the boards become thermal bridges — heat loss through such areas increases by 30–40 %.
  • Installation at temperatures below +5°C: the adhesive does not set or gain strength, the “wet facade” system loses its load-bearing capacity and may collapse as early as the first winter.

What to do if mould has already appeared on the wall

External insulation helps get rid of mould, but only if its cause is the wall freezing due to insufficient thermal insulation on the outside. Once the insulation is installed, the wall stops freezing, the dew point shifts outwards, and the fungus dies within 2–3 months due to the complete absence of moisture in the thickness of the wall. However, if the mould appeared because of poor ventilation in the apartment (blocked ventilation ducts, sealed double-glazed windows), insulation alone is not enough — the air exchange must also be improved: install inlet valves or a breather. Before installing the insulation, the affected areas must be treated with a deep-penetrating antiseptic (for example, “Lakra” or “Tex”) and dried with a construction heat gun — otherwise the fungus will remain under the insulation and continue to destroy the wall from the inside.

What you need to know before insulating an apartment from the outside

Before deciding on insulation, several practical points should be taken into account — from the temperature regime to the durability of the system.

At what temperature can a facade be insulated

The “wet facade” technology allows installation at air temperatures from +5°C to +30°C. At lower readings, the adhesive and plaster set more slowly or lose strength — this leads to the layers peeling off after just one season. In Almaty conditions, the optimal window for the work is from April to October, when daytime temperatures consistently stay above +5°C and night frosts are ruled out. Direct sunlight in summer, especially in July and August, is also a problem: it dries out the top layer, causing microcracks before the full depth has set. That is why in hot weather crews work from morning until 11:00 and after 16:00, covering the facade with awnings. Before starting work, check the forecast for 3-5 days — rain in the first 24 hours after the adhesive is applied washes away the unset compound, and the section has to be redone.

How to care for an insulated facade after installation

An insulated facade using the “wet facade” technology requires no special maintenance — it is enough to inspect the surface once a year for cracks and chips. If damage is found, it is patched with acrylic filler in a colour matching the facade. The decorative plaster protects the insulation from ultraviolet light and precipitation, so minor scratches that do not expose the layer pose no danger. The main enemy is mechanical impact: a ball, hail, tree branches. In places where contact is possible (near entrance areas, at first-floor level) it is worth installing protective corners or grilles — their cost of 500–1500 KZT apiece pays for itself by avoiding repairs. Washing the facade with pressurised water is not recommended — it can damage the decorative layer and drive moisture under the plaster, which will cause blistering in winter.

Conclusion

Before ordering a crew, it is worth going over the key principles once more — from choosing the material to obtaining approvals. Here are the five main conclusions.

Key takeaways

  • External insulation is more effective than internal insulation — the dew point is moved outside the wall rather than into the apartment, which eliminates damp and mould.
  • Expanded polystyrene and mineral wool are the main materials for external insulation, each with its own pros and cons in terms of price, vapour permeability and weight.
  • The “wet facade” technology is the most common and reliable method for multi-storey buildings in Almaty, used at 90% sites.
  • Corner and top-floor apartments require a special approach — a reinforced insulation layer of up to 150 mm and an industrial climber for safe work at height.
  • Approval from the KSK/OSI is mandatory — without it the insulation may be deemed illegal and you may be required to dismantle it, as well as being fined.

About the author

Askar Zhunusov

A specialist in facade insulation and wet facades. Works with the PROFI-DOM workshop in Almaty.

External insulation of apartments and facades: polystyrene foam, mineral wool, wet facade, dew point.