What roofing work includes: a full list of stages, materials and concealed works

Reading time: 21 minute
Full list of roofing work stages in Almaty: from design to the final covering

Roofing works include design, installation of the rafter system, laying of the roofing pie (vapour barrier, insulation, waterproofing), the final covering, installation of trim elements and the gutter system. Depending on the type of roof, the scope of work may vary — from dismantling the old roof to installing roof windows.

What are roofing works — definition and boundaries

Defining roofing works: scope and boundaries of roof installation

The composition of roofing work is a common question, so let us look at it in detail. Roofing work is a set of construction and installation operations for building a roof, from designing the rafter system to installing the downpipes. A clear understanding of the scope of work at the start of construction is the only way to control the budget and the timeframe.

What is included in roofing works — the basic scope

Roofing works are a set of construction and installation operations including design, construction of the rafter system, laying of the roofing pie (vapour barrier, insulation, waterproofing), installation of the final covering, installation of trim elements and the gutter system. In Almaty practice, where day-to-night temperature swings reach 15 °C in the shoulder seasons, the sequence of layers and the ventilation gap are critical — a mistake in the order of the membranes turns the insulation into a moisture condenser. Trim elements (ridge caps, eaves trims, valleys, abutments) seal the joints of the covering, while the gutter system (gutters, downpipes, funnels) diverts precipitation away from the blind area and facade. Understanding the full scope of work at the start allows you to avoid disputes with the contractor and unforeseen extra payments during construction.

Which works are considered additional during roof installation

Additional roofing works include installing roof windows, mounting snow guards, fitting aerators, soffit lining and installing fall protection systems — these elements are not mandatory, but they improve the functionality and safety of the roof. For example, in areas of Almaty with heavy snowfall (Medeu, Kamenskoye Plateau) snow guards prevent avalanche-like sliding, while aerators remove excess moisture from the under-roof space, extending the service life of the rafters. Roof windows (Velux, Fakro) are installed only when a habitable attic is being created and require reinforcement of the rafter system under the window opening. Refusing additional works at the design stage will cost more if these issues have to be resolved after the roofing installation is complete.

What is NOT included in roofing works — the boundaries of responsibility

The standard scope of roofing works does not include wall and facade insulation, installation of internal utility systems (ventilation, electricals), finishing of the attic space or landscaping of the adjacent territory — these tasks are handled under separate contracts. In the Almaty market, it is common for a client to sign a contract for a “turnkey roof” and then discover that the ventilation ducts have not been routed through the roof and the roofing build-up does not tie in with the wall insulation — these junctions require a separate detail and cost. A hidden works certificate for each layer of the roofing build-up (vapour barrier, insulation, waterproofing) records the boundary of the contractor's responsibility and rules out claims regarding wall insulation. A clear division of responsibility zones in the contract with the contractor is the only way to avoid a situation where “the roofers did their job, but the roof still leaks because of improper attic ventilation”.

Which stages of roofing works can be omitted to save money

You can save on roofing work only on decorative elements (soffit lining, expensive trim strips) and on the choice of finish coating, but you must absolutely not give up vapour barrier, insulation and waterproofing — breaking the roof pie leads to freezing and rotting of the rafters. In Almaty's winter conditions with frequent thaws followed by frosts, condensation forms in the insulation already when the temperature difference between outside and inside is 20 °C — without a vapour barrier, moisture penetrates the mineral wool, reducing its thermal resistance by 40-50% in a single season. The counter-batten that creates a ventilation gap between the insulation and the covering costs 500-700 KZT per linear metre, but its absence guarantees rotting of the rafters within 3-5 years. An attempt to save on the ventilation gap or counter-batten will result in major roof repairs within 3-5 years due to condensation and mould.

Types of roofing work — installation, repair and reconstruction

By scope and complexity, roofing work is divided into three types: installation of a new roof (a full cycle from rafters to covering), major repair (replacing the covering along with repairing the rafter system) and routine repair (locally fixing leaks and defects). When installing a new roof, dismantling the old covering is not required - the work is carried out on the bare rafter system, which simplifies quality control of each layer. Major repair is relevant for houses from the 1990--s in Almaty, where slate or ondulin has already exhausted its service life and the rafters need reinforcement due to deformation or rot. The choice of work type determines not only the budget but also the need for design documentation - major repair requires load calculations, while routine repair only needs an inspection and a defect list.

Stages of roofing works in order — from design to finish

Stages of roofing works in order: from design to finish in Almaty

We break down the sequence of roofing work - from design to final finishing, focusing on the mandatory stages and their technological links.

Design and calculations — how roofing works begin

Any roofing works begin with design: determining the roof pitch, calculating the snow and wind loads, selecting the rafter cross-section and their spacing — without these calculations the roof may not withstand winter precipitation. In Almaty the snow load reaches 160 kg/m², and in mountainous areas (Tau-Samal, Butakovka microdistricts) up to 200 kg/m² according to SP 17.13330., so the slope angle must be at least 30 degrees for metal tiles, otherwise the snow does not slide off by itself and creates excessive pressure on the rafters. The rafter cross-section is calculated for a specific span: for a house 8-10 metres wide, boards of 50×180 mm at 600 mm spacing are sufficient, while for an attic with an insulated roof the spacing is reduced to 400-500 mm to avoid sagging under the weight of the insulation. The roof design is not a formality but a document on the basis of which the estimate is calculated and materials are purchased; a mistake at this stage makes all subsequent work pointless — redoing the rafters costs 30-40 % of the price of a new roof.

Removal of the old covering — when it is necessary

Dismantling of the old roofing is mandatory for a major repair and reconstruction of the roof — the topcoat and waterproofing are removed, and if necessary the rafter system is partially or fully dismantled if it has been affected by rot. In Almaty houses from the 80-90-s, slate on a wooden batten is common: it is removed together with the nails, after which the condition of the wall plate is checked — if the wood is rotten, the affected sections are replaced with treated boards with a cross-section no smaller than the original. For routine repairs, dismantling may be local, only at the leak site, but if the roof is more than 15 years old, experts recommend a full replacement of the covering — the cost of local repairs over 3-4 seasons equals the price of a new roof, and the watertightness still declines.

Installation of the rafter system — the foundation of a reliable roof

Installation of the rafter system includes fitting the wall plate (a support beam around the perimeter of the walls), fastening the rafter legs at 600-900 mm spacing, installing the ridge purlin and constructing the battens with counter-battens — this is the load-bearing frame that carries the entire load of the roof. The wall plate is fixed to the reinforced ring beam with anchor bolts 12-14 mm in diameter at 1-1,5 metre spacing, and the rafters are secured to it with brackets or metal angles — such connections do not hold the wind load on screws, especially in spring with gusts of up to 25 m/s. The battens are made of boards 25×100 mm or 32×100 mm: under metal tiles the spacing equals the wave pitch (350 mm), under corrugated sheeting — 400-500 mm, while under soft roofing a continuous base of OSB-3 12-15 mm thick is required. For residents of Almaty with its snowy winters, the rafter cross-section must be at least 50×150 mm at 600 mm spacing, otherwise by the end of winter the slope sags from overloading.

Laying the roofing pie — vapour barrier, insulation, waterproofing

The roofing pie is laid in a strict sequence: vapour barrier (protects the insulation from moisture from inside the building), insulation 150-250 mm thick (mineral wool or PIR boards), a waterproofing membrane (diverts external moisture) and a ventilation gap of 50 mm for air circulation. The vapour barrier film is fixed to the rafters with a 100-150 mm overlap and sealed at the joints with butyl rubber tape — if gaps are left, humid air from the house condenses in the insulation, halving its thermal protection. For the climate of Almaty, with swings from -25 °C in winter to +35 °C in summer, 200 mm mineral wool boards with a density of 35-50 kg/m³ are sufficient, while for a habitable attic a second layer of 50 mm is added to bridge cold spots where the rafters meet the wall plate. A typical mistake is laying the vapour barrier the wrong way round or leaving no overlap onto the walls; as a result the insulation gets wet, loses up to 50 % of its thermal protection properties, and mould appears on the ceiling after just one winter.

Installation of the final covering — metal tiles, soft roofing, corrugated sheeting

Installation of the final covering depends on the chosen material: metal tiles are fastened to the battens at 350 mm spacing with screws with EPDM washers, soft roofing is laid on a continuous OSB base, corrugated sheeting is installed with a one-wave overlap, and ondulin is suitable for roofs with a pitch of at least 5 degrees. For the “Monterrey” profile the screw consumption is 8-10 pieces per square metre, and they must be driven strictly into the lower crest of the wave at a right angle, otherwise the washer deforms and leaks after 2-3 years. Bitumen shingles are laid from bottom to top with a 100-150 mm overlap, each shingle is fixed with 4-6 wide-head nails, and a special ridge-and-eaves shingle is used at the ridge — without it the upper joint will not be airtight in driving rain. The choice of final covering affects the entire roof structure: soft roofing requires a continuous base (extra costs for OSB), while metal tiles need only spaced battens, saving 15-20 % of the budget at the frame stage.

Installation of flashing elements and the gutter system

Fittings (ridge, valley, eaves and gable trims) and the drainage system (gutters, pipes, funnels) are not an option but a mandatory part of roofing works, without which the roof will not be watertight and the foundation will receive excessive moisture. The ridge is installed at the upper junction of the slopes with a ventilation tape so that the under-roof space is ventilated, and the valley (the internal junction angle) is mounted on a continuous base of galvanised steel 500-600 mm wide — this is the most vulnerable point of any roof, where leaks occur in 70 % of cases when installed incorrectly. For Almaty houses, drainage gutters are chosen with a cross-section of 125×90 mm (standard) or 150×100 mm for roofs over 150 m², and the number of funnels is calculated on the basis of one funnel per 10-12 metres of gutter, otherwise during a downpour the water overflows the edge and floods the blind area. If a contractor excludes the drainage system from the estimate, that is a reason to be wary — either they are trying to reduce the visible cost of the works, or they do not understand the technology; in both cases it is better to look for another contractor.

What is included in roof installation — the scope of works for different types of roofs

Scope of works for roof installation for different roof types

The scope of work for roof installation depends directly on whether you are installing a new roof or repairing an old one, as well as on the chosen finish coating — we will look at the difference using specific examples.

Installation of a new roof — the full cycle of work

Installing a new roof is a full cycle “from scratch”: design, installation of the wall plate and rafter system, laying of the roofing pie (vapour barrier, insulation, waterproofing), installation of the battens, final covering, trim elements and the gutter system. In our practice the full cycle also covers houses with a zero cycle and extensions where the rafter system is designed anew to match the overall roof geometry. If the roof is of a complex shape — with an attic, valley or dormer windows — reinforcement of the abutment joints and additional layers of insulation are added. On a house of 10×12 metres with a standard gable roof under metal tiles, a crew of 4 people completes all stages in 10-14 working days, including installation of gutters and snow guards. When installing a new roof on a new house, it is important to provide the ventilation gap and aerators straight away — once the roof is finished, adding them without dismantling the covering is impossible.

Major roof repair — scope of work

Major roof repair includes dismantling the old covering, replacing damaged sections of the rafter system, restoring or completely replacing the roofing pie, laying a new final covering and replacing the trim elements — in terms of the scope of work it is close to installing a new roof, but retaining the existing roof geometry. If the rafter system is in order and only the pie and covering need replacing, major repair costs less than a full installation by 20-30%, since it does not require a new design or layout. A typical case from our practice is a house built in the 1990-s in the Orbita microdistrict: the slate was dismantled, the rotten rafters on three slopes were replaced, new 200 mm insulation was laid and the roof was covered with metal tiles, keeping the existing pitch angle. If during a major repair the roof pitch is changed or roof windows are added, this is already considered reconstruction and requires a new design — simply “re-laying the covering” will not do.

Routine roof repair — local works without replacing the structure

Routine roof repair is the local elimination of defects: replacing damaged metal tile sheets, sealing joints and junctions, repairing the valley, restoring waterproofing at leak points — without dismantling the entire structure or replacing the rafters. Unlike major repairs, routine repair does not affect the roof pie or the battens: if a leak occurs because a sheet was torn off by the wind on one slope, it is replaced within 2-3 hours without opening up the whole roof. In Almaty's conditions, where sharp temperature swings from -15 to +10 degrees in winter are commonplace, pipe junctions and valleys suffer most often due to freeze-thaw cycles. Routine repair is justified if the roof is no more than 5-7 years old and the damage is local; if leaks occur in different places, it is a signal that major repairs are required.

Scope of works for different types of roofing — comparison table

ParameterMetal roof tilesSoft roofingCorrugated sheetingOndulin
Type of baseSpaced battensSolid base (OSB/plywood)Spaced battensSpaced battens
Batten spacing350 mmNot required (solid decking)For the profile (300-500 mm)450-600 mm
Additional layersWaterproofing, counter-battensUnderlayment, waterproofingWaterproofing, counter-battensWaterproofing, counter-battens
FastenersSelf-tapping screws with EPDM washerNails/self-tapping screws + bitumen adhesiveSelf-tapping screws with EPDM washerUmbrella-head nails
Minimum slope12 degrees12 degrees8 degrees5 degrees

What is included in metal roof tile installation — step by step

Installation of metal tiles includes: laying the waterproofing membrane, fixing the counter-battens (creating a 50 mm ventilation gap), installing the battens at 350 mm spacing, laying the metal tile sheets with a one-wave overlap, fastening with screws with EPDM washers and installing the trim elements (ridge, valley, eaves trims). Before laying the membrane, the evenness of the rafters must be checked — the diagonal deviation must not exceed 5 mm per metre, otherwise the sheets will lie skewed and the joints will open up. A typical house of 10×12 metres requires about 80-90 sheets measuring 1,2×2 metres, fastened into the lower wave every other one — about 6-8 screws per square metre. The most common mistake when installing metal tiles is over-tightening the screws: the EPDM washer deforms, the seal is broken, and after 2-3 years rust appears at the fastening points.

Additional roofing work — what is often overlooked

Additional roofing works: what is often overlooked when drawing up the list of works

We break down the works that are often not included in the base estimate but without which the roof will not be complete - from ventilation to documentation.

Roof ventilation — aerators and ventilation gaps

Roof ventilation is not an option but a mandatory element: a ventilation gap of 50 mm between the waterproofing and the topcoat (created by a counter-batten) plus roof aerators ensure air circulation and remove condensation from the under-roof space. In a standard ventilated roof design, air enters through the soffit of the eaves overhang, passes along the gap and exits through the ridge or aerators — this is a closed cycle. If even one element is missing, moisture accumulates in the insulation: mineral wool gets damp, loses up to 40% of its thermal protection properties, and the rafters begin to rot from within. Without ventilation, the insulation becomes damp from condensation, the rafters start to rot and mould appears on the ceiling — saving on aerators (10-15 thousand KZT each) results in a major roof overhaul within 3-5 years.

Soffit lining — why and how it is done

Soffit cladding is the closing of the lower part of the roof (the eaves overhang) with soffits or boards, which protects the rafters and insulation from the weather, prevents birds and rodents from getting under the roof and ensures ventilation of the under-roof space. On the local market, vinyl soffits are most often used (prices from 2500 KZT per linear metre including installation) or wooden lining - the first option is more practical: it does not rot, does not need painting and comes with perforation. When cladding the overhangs it is important to leave ventilation gaps or use perforated soffits - solid cladding blocks ventilation and nullifies the effect of the aerators.

Snow guards and fall protection systems — roof safety

Snow guards (tubular or angle type) are mounted on the final covering and prevent snow from sliding off the roof in an avalanche, while safety systems (anchor lines, roof railings) ensure safety during roof maintenance - snow clearing, repairs and inspections. Tubular snow guards made of galvanised steel with a polymer coating (an approximate cost of 1500-3000 KZT per linear metre) are installed in a staggered pattern along the entire length of the slope, while angle models are cheaper (800-1200 KZT) but are only effective at a slope of up to 30°. In regions with snowy winters (Almaty, East Kazakhstan) snow guards are not an option but a safety requirement: snow sliding off the roof can damage a car, injure passers-by or destroy the drainage system.

Seasonality of roofing works — what can be done in winter

In winter it is possible to dismantle the old covering, install the rafter system and mount the gutter system (at temperatures down to -15°C), but laying bitumen shingles, sealing valleys and installing waterproofing require a temperature of at least +5°C. At sub-zero temperatures polymer membranes become brittle, bitumen materials lose adhesion and sealants do not cure — each of these factors leads to leaks as early as the first thaw. If roofing work was started in autumn and remains unfinished in winter, the contractor must mothball the roof — cover it with waterproofing and secure the temporary covering so that precipitation does not get inside.

Documentation — contract, acts, warranties

Once the roofing work is complete, the customer must receive: a contract with a list of works and an estimate, hidden work certificates (for each stage - rafters, vapour barrier, insulation, waterproofing), a work acceptance certificate and a warranty commitment (usually 3-5 years for the work, 10-50 years for the materials). The contract also records the deadlines, payment procedure, the parties' responsibilities and termination conditions - without these clauses the customer is left without legal protection. A hidden work certificate is the only document that will allow you to make claims against the contractor if problems with the insulation or waterproofing are discovered a year after installation; without it, proving that the work was done poorly is practically impossible.

What should be in a roofing works estimate — the full list

We draw up a detailed list to avoid hidden extra charges and disputes with the contractor at every stage.

Key items in the cost of roofing works

  • Design and calculation work: the load on the rafter system, the insulation layout, the layout plan for the final covering - without this the estimate has no engineering basis.
  • Materials itemised by position: rafters and wall plate with board cross-section, battens with spacing, vapour barrier, insulation of the calculated thickness, waterproofing, final covering with the manufacturer's brand, trim elements and the gutter system.
  • Crew work by stages: dismantling the old roof, installing the rafter system, insulation, laying the final covering, sealing the junctions and installing the downpipes - with a separate price for each stage.
  • Logistics with two rates: delivery of materials to the site and lifting them onto the roof — by crane or by hand, with different prices set out in the contract.
  • Waste removal: container rental and disposal of the old roof together with the packaging from new materials.

Only a detailed estimate broken down by stage rules out the situation where the contractor names a new price during the process, citing “unforeseen difficulties” that were obvious from the very start.

Hidden costs that are not always included in the estimate

  • Lifting materials to height: if there is no crane on site, the contractor may charge for this service separately, adding 10–15 % to the estimate - make sure the contract states that this is his responsibility.
  • Removal of the old roof and debris: local contractors often omit container rental (5000–8000 KZT per day) and disposal, leaving you with a pile of waste on the plot.
  • Replacement of damaged elements of the rafter system: during dismantling, rotten rafters or the wall plate are exposed — replacing them is not included in the base estimate, but without it the new roof will not last long.
  • Installation of additional ventilation outlets: for bathrooms and kitchens, if they were absent from the old design — roof penetration elements cost from 5000 KZT each.
  • Treatment of wooden structures with an antiseptic and fire retardant: many crews skip this stage, although it is mandatory for safety under the standards.

Specify in the contract that lifting materials onto the roof is the contractor's responsibility, otherwise this service will be billed separately, increasing the total cost by 10–15 %.

How to check a roofing estimate — a checklist for the client

  • Whether the grades and quantities of all materials are stated: the estimate must contain specific names (for example, “Grand Line metal tiles 0,5 mm”), not vague wording like “roof covering” — otherwise you will not be able to control substitution with a cheaper equivalent.
  • Is there a breakdown by stages: dismantling, rafter system, insulation, final covering, gutters — each stage with its own price, so you can see the real cost of each operation.
  • Whether delivery and lifting of materials is included: a crane in Almaty costs from 15 000 KZT per shift — if lifting is not specified, you will be charged extra at the site for the manual labour of loaders.
  • Whether the cost of waste removal is included: renting a container for a day is 5000–8000 KZT, and if this line is missing, the waste will remain on the plot after the work is completed.
  • Is there a separate line for unforeseen works: usually 5–10 % of the estimate — these funds will cover replacing rotten boards or an extra vent penetration without a row and a recalculation.

If a contractor refuses to itemise the estimate down to specific material brands, it is a signal that during the work they may substitute cheaper ones without your knowledge.

What a client should pay attention to when choosing a contractor for roofing work

We break down the key points to look out for when choosing a roofing contractor in order to avoid problems with quality and documents.

How to check a contractor's experience in roofing work

  • Number of completed properties: at least 10–15 per season — an indicator that the crew works regularly, not from time to time.
  • Genuine reviews with photos of the stages: ask for pictures of the process - laying the vapour barrier, installing the rafters, insulation; these are what confirm that the technology was followed.
  • Customer contacts from properties 2–3- years old: a contractor willing to provide such contacts is confident in the durability of the roof — after 2–3 years defects appear: leaks at abutments, peeling of waterproofing, deformation of ridges.
  • Checking properties in your area: if the contractor has worked in Aksai or on Gorny Gigant, ask for the address and go and have a look - the condition of a roof after a year or two will tell you more than any portfolio.
  • Refusing to show properties older than a year is a red flag: a quality roof should not leak even after 5 years, so if the contractor pleads that clients are busy, he most likely knows about problems at those properties.

What warranties a contractor should provide for roofing work

The standard warranty on roofing work for private houses is 3–5 years, while manufacturers give from 10 to 50 years on materials: metal tiles — 15–20 years, flexible shingles — 25–50 years, ceramics — up to 50. The contract must clearly state what the contractor's warranty covers: leaks at junctions and valleys, peeling of the finish coating, failure of seam sealing, deformation of ridge and eaves elements. If the contractor offers a warranty only on materials and gives nothing on the work, that is a reason to be wary: installation errors (incorrect batten spacing, poor ventilation of the under-roof space, inadequate overlap of waterproofing) show up in the very first rainy seasons. The manufacturer's warranty on materials and the contractor's warranty on work are fundamentally different things: if the roof leaks because the insulation got wet due to improper vapour barrier, the factory certificate on the tiles will not help, so demand a two-level warranty — both on the material and on the installation.

Documentation for roofing work — contract, acts, warranties

Once the roofing work is complete, the customer must receive four mandatory documents: a contract with a detailed list of works and an estimate for each stage (rafter system, insulation, roof covering, downpipes), hidden work certificates for each technological layer (vapour barrier, insulation, waterproofing, battens), a work acceptance certificate signed by both parties and the contractor's warranty commitment for 3–5 years listing the warranty cases. A hidden work certificate is the only document that will allow you to make claims if problems with the insulation or waterproofing are discovered a year after installation: without it you will not be able to prove that the work was done poorly, and the expert review will rely only on a visual inspection rather than on a confirmed technology.

Conclusion

We have broken down the stages that roofing work consists of: from the rafter system to the downpipes. Here are the main takeaways a customer in Almaty should remember.

Key takeaways

  • Full list of works: includes dismantling the old roof, installing the rafter system, vapour barrier, insulation, waterproofing, installation of the final covering and installation of the drainage system.
  • A detailed estimate: broken down by stages and stating the grades of materials — the only way to avoid hidden extra charges and disputes with the contractor.
  • Hidden works certificates: for every stage — a mandatory document that records the quality of the completed works and allows you to make claims if defects are discovered.
  • Warranty on the works: 3–5 years from the contractor and 10–50 years from the material manufacturer — these are different obligations, and it is important that the crew provides its own warranty specifically on the installation.
  • Choosing a contractor: check real properties older than a year, not just recent reviews and photos — after a season, mistakes in waterproofing and ventilation become visible.

About the author

Yerzhan Tuleuov

Foreman of roofers. Works with the PROFI-DOM workshop in Almaty.

Full cycle of roofing works: from rafters to gutters.