How to replace slate with corrugated sheeting: a step-by-step guide for a house in Almaty

Reading time: 16 minutes
Step-by-step guide on how to replace slate with corrugated sheet for a house in Almaty

Replacing slate with corrugated sheeting is a process that can be carried out in two ways: with full dismantling of the old covering or by installing over the slate. The first option is more reliable but costs 30–40% more. The second is faster but requires a ventilation gap and an assessment of the rafters' condition. The choice depends on the state of the roof and the budget.

Why slate is replaced with corrugated sheet

Damaged slate on an old roof — reasons to replace slate with corrugated sheet

Whether corrugated sheeting can be laid over slate is a common question, so let us examine it in detail. We will look at why homeowners increasingly choose corrugated sheeting instead of old slate — from weight to service life and watertightness.

Weight and load on the rafters

Slate weighs 10–15 kg/m², whereas corrugated sheeting weighs only 4–7 kg/m², which reduces the load on the rafters by 5–8 kg/m² and makes the replacement safe even for an old frame. A typical rafter system made of 50x150 timber at 600–900 mm spacing, designed for slate, gains a safety margin of 30–40% when switched to corrugated sheeting. This is especially important for the Almaty region, where the snow load reaches 150–180 kg/m² on the southern slopes of the Trans-Ili Alatau. If the rafters are undamaged, replacing slate with corrugated sheeting actually unloads the roof system — this reduces the risk of frame deformation in snowy winters.

Durability and corrosion resistance

The service life of polymer-coated corrugated sheeting is 25–50 years, whereas slate lasts on average 20–30 years and gradually loses strength, crumbling at the edges and developing microcracks from temperature changes. The polymer coating (polyester, Pural or PVDF) protects the metal from corrosion even in conditions of frequent rain and aggressive ultraviolet radiation typical of Almaty with its sharply continental climate. Asbestos-cement slate, by contrast, absorbs moisture, which on freezing widens microcracks and destroys the sheet from within over 3–5 freeze-thaw cycles. The polymer coating protects the metal from corrosion even in conditions of frequent rain and snow — this eliminates the need for repairs every 5–7 years.

Aesthetics and tightness of the roof

Corrugated sheeting provides a watertight covering thanks to a side overlap of one wave and a vertical overlap of 150–200 mm, which eliminates leaks even on slopes with a pitch of 12 degrees or more. Each sheet is fixed with roofing screws 4.8x28 with an EPDM washer that deforms when tightened and seals the hole — such seals are impossible on slate due to the fragility of the material. During installation, screws are driven strictly into the lower wave of the corrugated sheeting, where water does not linger, whereas on slate the fixing goes through the crest of the wave, creating a channel for leaks. Unlike slate, where joints often let water through due to chips and cracks, corrugated sheeting with EPDM washers on screws creates a reliable seal at every fixing point.

Can corrugated sheet be laid over slate

Can corrugated sheet be laid over slate — an example of installation over the old covering

Replacing a slate roof with corrugated sheeting is a common question, so let us examine it in detail. We will look at when slate can be covered with corrugated sheeting without dismantling, and when this is dangerous and risks leaks and rotting rafters.

When installation over slate is acceptable

Installing corrugated sheeting over slate is possible if the old slate has no cracks, chips or moss, and the rafter system is in good condition with no traces of rot or mould. During the inspection every wave is checked: even one through crack longer than 10 cm is a reason for full dismantling. The condition of the rafters is assessed from the attic side — attention is paid to darkened areas of timber and crumbly wood around the nails. If the slate is intact and the rafters are dry, a counter-batten of 50x50 mm timber with a spacing of 600–900 mm is installed over it, creating a 50 mm ventilation gap. Even when the slate is in acceptable condition, a ventilation gap must be provided — without it, condensation under the corrugated sheeting will lead to metal corrosion within 2–3 years, and the roof will have to be redone.

When slate must be removed

Slate must be dismantled if there are cracks, chips, moss, leaks or signs of rafter rot — in these cases installing over the top will only make the problems worse. Cracks in the slate indicate that the material has already lost strength: in Almaty, where winter temperature swings reach 30°C, asbestos-cement sheets become brittle after 20 years of use and break under the weight of the installers. Moss on slate is not just a cosmetic defect: its roots penetrate the microcracks, widening them when water freezes, and beneath such a covering the rafters are often already affected by rot. If an inspection of the attic reveals damp insulation or a white deposit on the timber, this is a sign of prolonged leaks, and dismantling is essential. Replacing slate with corrugated sheeting and fully removing the old covering takes 3–5 days, but gives access to the rafters for repair and waterproofing, which rules out hidden defects for decades.

Comparison of options: dismantling vs installing on top

ParameterComplete dismantlingInstallation over slate
Condition of the slateAny (including cracks and chips)Only whole, without defects
Condition of the raftersCan be assessed and repairedMust be perfect
Ventilation gapProvided by a counter-batten50 mm required
CostHigher by 30–40%Lower, but with risks
Time of work3–5 days1–2 days
Service life of the new roof25–50 years15–25 years (due to hidden processes)

Full dismantling increases the cost of the work by 30–40%, but it allows the condition of the rafters and waterproofing to be assessed, which eliminates hidden problems and multiplies the roof's service life by 1,5–2.

Arranging a ventilation gap when installing over slate

To create a ventilation gap of 50 mm, a counter-batten of 50x50 mm timber is installed over the slate with a spacing of 600–900 mm along the rafters. The timber is fixed to the rafters with galvanised self-tapping screws 100 mm long through a rubber washer — it is important not to damage the old slate when drilling, so the holes are drilled in the crest of the wave. A diffusion membrane is laid over the counter-batten — it lets vapour out of the attic but does not let moisture in from outside, protecting the insulation and rafters from getting wet. The seams of the membrane are sealed with butyl rubber tape, and then the battens for the corrugated sheeting are installed with a spacing of 300–500 mm depending on the slope pitch. In Almaty houses with steep slopes of 30–45° the batten spacing is increased to 500 mm to reduce the load on the old rafters — this reduces the weight of the roofing assembly by 15–20% compared with closely spaced battens.

Removing slate and preparing the rafters

Removing slate and preparing the rafters before replacing slate with corrugated sheeting

A step-by-step guide to dismantling slate with health and safety in mind and preparing the rafters for installing corrugated sheeting.

Safety precautions when dismantling slate

When dismantling asbestos slate, be sure to use a respirator, safety glasses and gloves — asbestos dust belongs to hazard class 4. Dust from old sheets contains fibres that settle in the lungs and can cause chronic respiratory diseases. Therefore, before starting work, be sure to put on an FFP2 or FFP3 respirator, tight-fitting safety glasses and construction gloves with a rubber coating — they do not slip on wet slate. Dampening the slate with water from a hose before dismantling reduces the amount of asbestos dust by 70% — this is a simple and effective way to protect your lungs.

Step-by-step guide to removing slate

  • Crowbar or pry bar: these are used to extract the slate nails from the battens, starting from the bottom edge of the sheet so as not to split it.
  • FFP2 or FFP3 respirator: protection from asbestos dust at all stages of dismantling, especially when removing nails.
  • Safety goggles and gloves: they prevent eye injuries and skin contact with dust and the sharp edges of slate.
  • Hose with water: before removing each sheet, dampen it again — this keeps the dust on the surface.
  • Boards for lowering the sheets: two battens 3-4 metres long, laid from the ridge to the ground, along which the sheets slide down without falling.
  • Polyethylene bags: sturdy 120 litre bags to package each sheet immediately after lowering — this prevents dust from scattering across the site.

Inspection and repair of the rafters after dismantling

After dismantling the slate, inspect the rafters for rot, cracks and woodborer beetle damage — damaged sections must be replaced or reinforced. In Almaty houses built in the 70-80-s, the rafters are often damp due to the lack of waterproofing under the slate, so check the bearing points on the wall plate and the joints with the purlins. If rot affects no more than 30% of the rafter's cross-section, you can fit boards of the same thickness on both sides and secure them with screws — this is cheaper than a full replacement. After repair, be sure to treat all the rafters with fire and bioprotection, applying the product in two coats with a brush — this extends the service life of the rafter system by 15-20 years.

Disposal of old slate in Almaty

Old asbestos slate must be packed in plastic bags, labelled as “asbestos-containing waste” and taken to the Karagaily landfill in Almaty. Labelled bags are accepted by the landfill operator without additional certificates, but entry for a car with a trailer costs from 1500 KZT. Slate belongs to hazard class 4, so it cannot be thrown into ordinary waste containers — this carries a fine, while the Karagaily landfill accepts such waste legally. If you cannot take the slate away yourself, order a 8 cubic metre container from construction waste removal companies — the cost of removal in Almaty starts from 15 000 KZT.

Battens and waterproofing under corrugated sheeting

Battens and waterproofing under the corrugated sheet — the slate roof replacement stage

Proper battens and waterproofing are the foundation of a durable corrugated sheet roof. We will go through the steps and materials that will ensure a dry and strong roof.

Laying waterproofing — diffusion membrane or film

Waterproofing under corrugated sheeting is mandatory — a diffusion membrane or waterproofing film is used, laid with an overlap of 150 mm across the rafters. An ordinary film (from 150–200 ₸/m²) does not let vapour out of the insulation, so on cold attics it is acceptable, but for an attic with mineral wool it is not: vapour is retained in the wool, reducing its thermal insulation by 40–60% within two seasons. A diffusion membrane (350–500 ₸/m²) works both ways — it protects against moisture from outside and releases vapour from inside, so it is the only option used on insulated slopes. The sheet is rolled out horizontally from the eaves to the ridge with a sag of 10–20 mm between the rafters, the joints are sealed with butyl rubber tape, and the points where pipes pass through are sealed with mastic. Saving on the membrane results in having to redo the roof after two seasons — for attics with insulation it is the only workable option.

Batten spacing for different grades of corrugated sheet

Corrugated sheet gradeWave height (mm)Batten spacing (mm)Recommended roof pitch
NS-3535500from 15°
N-6060800from 10°
N-75751000from 8°

For the battens, a board of 100x25 mm is used — the first row at the eaves is made thicker (a board of 100x40) to compensate for the load from the first wave. The spacing is measured along the centres of the boards, starting from the eaves board. For NS-35 on slopes longer than 6 metres the spacing is reduced to 400 mm — this distributes the snow load, which in the foothill areas (Gorny Gigant, Kamenka) reaches 200 kg/m². If you are installing N-75 on a roof with a pitch of 8–10°, a spacing of 1000 mm is acceptable only with a design snow load of up to 150 kg/m² — exceeding it deforms the sheets between the supports. Using the wrong batten spacing leads to deformation of the corrugated sheeting under snow load, which is critical for the Almaty winter with precipitation of up to 80–100 cm.

Counter-batten and ventilation gap

A counter-batten made of 50x50 mm timber is installed over the waterproofing along the rafters and creates a 50 mm ventilation gap to remove condensation. The timber is fixed with 100 mm galvanised nails to every rafter at a fixing spacing of no more than 500 mm to prevent sagging. The ventilation gap works continuously: air enters through the soffit of the eaves overhang (a perforated soffit) and exits through the ridge vent. On complex roof shapes (valleys, dormer windows) additional vents are installed — one for every 20–25 m² of roof. Without a ventilation gap, condensation accumulates under the corrugated sheeting, causing metal corrosion and rafter rot — this shortens the roof's service life to 5–7 years instead of the design 30–50.

How to replace slate with corrugated sheeting — installation stages

We will go through the step-by-step installation of corrugated sheeting on prepared battens — from cutting the sheets to fitting the trim elements and the final leak test.

Preparation and cutting of the corrugated sheet

Before installation, the sheets are cut to the length of the slope, allowing for a vertical overlap of 150–200 mm, using tin snips or a jigsaw. For a standard NS-35 sheet 6 metres long on a 8 metre slope, two sheets with an overlap of 200 mm will be required — the allowance is factored in at the measuring stage. Cutting corrugated sheeting with an angle grinder fitted with a metal cutting disc is not allowed: the abrasive heats the polymer to 300–400 °C, the coating cracks and peels, and the exposed steel begins to rust after 3–5 months. In practice, Almaty tradesmen often use tin snips for longitudinal cuts and a jigsaw with a fine-toothed metal blade — this gives a clean edge without burrs. When cutting on the ground, place even timber battens under the sheet so as not to damage the profile, and remove metal swarf immediately — it scratches the coating and later becomes a corrosion hotspot.

Fastening the corrugated sheet to the battens

Corrugated sheeting is fixed to the battens with roofing screws 4.8x28 mm into the lower wave, consumption — 6–8 screws per m². The screwdriver is set to medium torque — the EPDM washer should be compressed by exactly 1 mm, no more; if overtightened, the rubber will squeeze out and lose its seal. Each sheet is first fixed with one screw in the centre of the top edge, aligned with the eaves overhang, and only then are the rest screwed in — along the edges through the wave, in the middle in a staggered pattern. Screws are driven strictly perpendicular to the surface of the corrugated sheeting: even a 5° skew damages the EPDM washer and leaves a gap where water leaks in. When installing on a slope longer than 6 metres, the sheets are joined along their length with an overlap of 200 mm, and in the joint area screws are placed in every trough — this is the most wind-loaded spot.

Installation of flashing elements

After laying the corrugated sheeting, the ridge, eaves and gable strips are installed, as well as the junction strips to walls and pipes — all with sealing tape. The ridge is fixed with 4.8x50 mm screws into the upper wave of the corrugated sheeting through every second wave — this provides ventilation of the under-roof space: air enters under the eaves and exits through the ridge gap, removing vapour from the insulation. The eaves strip is fitted before laying the corrugated sheeting, under the lower edge of the sheet, and the gable strip last, with a 50–100 mm overlap along its length. Junction strips to the chimney require particular attention: a 20–30 mm deep groove is cut in the brick chimney, the upper edge of the strip is inserted into it, and the joint is sealed with roofing sealant. For the ridge on hipped roofs in Almaty, ready-made corner elements are popular — they cost more but eliminate leaks where two ridges meet.

Leak test and final sheathing

Once installation is complete, check all joints and fixing points for watertightness — add sealant or sealing tape if necessary. Pay particular attention to the valley and the junctions with pipes: these are the most vulnerable areas of the roof, where leaks most often occur. In the valley, the corrugated sheeting is cut along the line where the slopes meet, leaving a 50–60 mm gap between the sheets, which is closed with the lower and upper valley strips — a porous sealant must be laid between them. After rain, inspect the attic: if there are damp patches on the waterproofing, look for the defect in the area of the screws or overlaps, not in the continuous field of the sheet — 90 % of leaks occur precisely at the fixing points.

Common mistakes when replacing slate with corrugated sheeting

We will go through the most common mistakes made when replacing slate with corrugated sheeting, and how to avoid them — from installation without a ventilation gap to cutting corners on waterproofing.

Installation without a ventilation gap

Installing corrugated sheeting without a ventilation gap leads to condensation accumulation, metal corrosion and rafter rot within 2–3 years. In the Almaty climate, with sharp temperature swings and high humidity in spring, condensation forms daily — without a gap, moisture does not evaporate but drips onto the rafters and insulation. Even when installing over slate, a ventilation gap is mandatory: without it, condensation accumulates between the slate and the corrugated sheeting, destroying both materials — the slate cracks from excessive moisture, and the corrugated sheeting rusts from the inside within a single season.

Fastening into the upper corrugation of the corrugated sheet

Fixing screws into the upper wave of the corrugated sheeting breaks the technology — water seeps under the washer, causing corrosion at the fixing point. Roofing screws 4.8×28 with an EPDM rubber washer are designed to be driven into the lower wave, where the metal fits tightly against the batten and the washer is compressed evenly. When fixed into the upper wave, a 3–5 mm gap forms through which water reaches the metal — even a quality screw begins to rust after 6–8 months. Screws must be driven only into the lower wave, where the metal fits tightly against the batten — this ensures a watertight seal and reliable fixing.

Saving on waterproofing and wood preservative

Skipping waterproofing and treating the rafters with preservative leads to leaks and infestation of the timber by rot and woodborer beetle. Homeowners in Almaty often economise on fire and bioprotection, considering it an unnecessary expense — but in conditions of damp autumn and winter, rafters without treatment begin to rot as early as the second year. A waterproofing membrane under the corrugated sheeting costs around 150–200 KZT per square metre, and preservative for the rafters a further 100–150 KZT. Preservative for the rafters is inexpensive, but its absence can lead to replacement of the entire rafter system in 5–7 years — that is 10 times more expensive than prevention.

Ignoring the condition of the rafters

Ignoring rot in the rafters when installing corrugated sheeting over slate is the most dangerous mistake, one that can lead to roof collapse. Old slate weighs 15–17 kg per square metre, while corrugated sheeting weighs 5–7 kg, but many mistakenly believe that corrugated sheeting can be laid over slate without checking the load-bearing beams. If the rafters have already begun to rot from leaks, the additional weight of the corrugated sheeting and snow can become critical — especially in an Almaty winter with loads of up to 150 kg per square metre. If the rafters have begun to rot, the additional weight of the corrugated sheeting and snow can become critical — be sure to inspect the rafters before choosing any replacement option.

Conclusion

Replacing slate with corrugated sheeting is a solution that gives the roof a new 25–50-year lifespan. Now let us summarise the main points on the choice of technology, materials and critical details that determine the result.

Key takeaways

Replacing slate with corrugated sheeting extends the roof's service life by 25–50 years and reduces the load on the rafters by a factor of 2–3. The main choice is whether to dismantle the old slate or install corrugated sheeting over it: the first option is more reliable but costs 30–40% more due to debris removal and frame repairs, while the second is 2–3 days faster but requires the slate to be in perfect condition and a mandatory ventilation gap of 40–50 mm between the waves and the corrugated sheet. Waterproofing, timber preservative for the rafters and screws with an EPDM washer are not items to economise on but details that determine whether everything will have to be redone in 5 years. If you are unsure about the condition of the rafters, choose full dismantling: it is the only way to see rot or cracks hidden beneath the old slate.

About the author

Bauyrzhan Aliyev

Roofer specialising in roof replacement and re-covering. Works with the PROFI-DOM workshop in Almaty.

Replacing slate with corrugated sheeting: removal, battens, installation.

Phone:+7 (777) 327-97-34Our address:Almaty, Makataev St., 47, office 325 (Partner Business Centre)Daily: 9:00–21:00 (by appointment)