How to lay corrugated sheet on a roof: a step-by-step guide for DIY installation
Laying corrugated sheet on the roof begins with preparing the base: you install the batten at a pitch of 30–50 cm (depending on the grade), lay the waterproofing and the counter-batten. The sheets are fastened from the bottom upwards, from the eaves to the ridge, with an overlap of one or two corrugations. The screws are driven strictly into the lower corrugation — this is the main rule of a watertight roof.
Where to start laying corrugated sheeting on a roof
The overlap of corrugated sheet is a frequent question, so let us examine it in detail. Before picking up the screwdriver, you need to understand the general logic of installation: where to start, how to account for the wind and in what sequence to move across the slope.
Which side to start laying corrugated sheeting from — left or right
Laying of the corrugated sheet begins from the roof end opposite the prevailing wind direction — if the wind most often blows from the left, start from the right so that each subsequent sheet covers the previous one on the windward side. With the south-westerly flows typical of Almaty, the sheets are laid from right to left, leaving the overlap on the south-western slope. On mono-pitch and gable roofs the direction is determined once for the whole surface; on hip and pyramid roofs each side is marked out separately according to its own wind rose. In regions with changeable winds (for example, in the foothills of the Trans-Ili Alatau, where northern flows give way to southern ones during the day) it is safer to lay the sheets from left to right — this is a universal option in which the overlap ends up on the leeward side for most directions.
General rule: bottom to top, from the eaves to the ridge
Regardless of the roof shape, corrugated sheets are always installed from the bottom up — the first row is aligned along the eaves, and each subsequent row rises with an overlap towards the ridge, ensuring water flows from the upper sheet onto the lower one. If the slope is longer than 6 metres, the sheets are joined along their length with a vertical overlap of 200–300 mm, and the joints are staggered so that four corners do not meet at one point. On roofs with two valleys, the valley is first covered with a lower flashing, then the standard sheets are installed from the valley towards the gables — this avoids cutting sheets at the most complex unit and reduces the risk of leakage by 60–70% compared with installation from the gable towards the valley.
How to align the first sheet along the eaves and the end
The first sheet is positioned with an overhang beyond the eaves of 40–70 mm and aligned along the end of the roof — the horizontal deviation must not exceed 2–3 mm per 3 metres of length, otherwise the geometry of the slope will “drift”. The position is checked with a spirit level at least 1,5 metre long and a taut cord along the eaves board; after the first screw is fixed, the diagonal is checked — the difference between the corners must be no more than 5 mm. If the first sheet is laid crookedly, all subsequent installation will go “like a staircase” — this can only be corrected by dismantling, so 2–3 times more time is spent aligning the first sheet than on all the rest.
Battens and waterproofing under corrugated sheeting
How to fasten corrugated sheet is a common question, so we will look at it in detail. Laying corrugated sheet on a roof begins long before the sheets are lifted up — how long the roof will last depends on how correctly the batten and waterproofing are installed.
Batten spacing for different grades of corrugated sheet
| Corrugated sheet grade | Wave height, mm | Metal thickness, mm | Batten spacing, cm |
|---|---|---|---|
| From 20 | 20 | 0,4–0,5 | 30–40 |
| From 21 | 21 | 0,4–0,5 | 30–40 |
| NS35 | 35 | 0,5–0,6 | 40–50 |
| NS44 | 44 | 0,5–0,7 | 50–60 |
| N60 | 60 | 0,6–0,7 | 60–80 |
Is waterproofing needed under corrugated sheet and which side to lay it
Waterproofing under corrugated sheet is essential for any pitched roof — it protects the rafters and insulation from condensation that forms on the inner side of the metal when temperatures fluctuate. Ordinary roofing felt or tar paper are not suitable: they do not let vapour through, and the insulation stays damp, losing its thermal performance. Only diffusion membranes are used, for example the brands “Isospan A” or “Yutafol” — they are laid in strips from bottom to top with a horizontal overlap of 15–20 cm. The rough side of the membrane should face the corrugated sheet, and the smooth side should face the insulation: the fibrous surface retains micro-droplets of condensation and prevents them from running down onto the mineral wool. If the sides are reversed, moisture will seep into the roofing assembly, and after one or two seasons the rafters at the joints will start to turn black.
Counter-batten: why it is needed and what height
A counter-batten made of 50×50 mm timber creates a ventilation gap between the waterproofing and the corrugated sheet — without it, condensation cannot evaporate and the rafters begin to rot within 3–5 years. The batten is fixed along the rafters over the membrane, and the battens of the lathing are then nailed across it. For roofs up to 10 metres long, a counter-batten height of 50 mm is sufficient — this is enough for natural draught from the eaves to the ridge. If the slope is longer than 10 metres, the gap is increased to 60–70 mm, otherwise the air stagnates in the middle part of the slope. In practice, when installing corrugated sheet on the roof of a house with an attic, the counter-batten is doubly essential: the under-roof space there is used as living space, and without ventilation the insulation becomes damp within a couple of months.
How to lay corrugated sheeting — laying sequence and overlap
Installing corrugated sheet with your own hands is not simply “laid it down and screwed it on”. Whether the roof will leak in the very first rain depends on the overlap you make and the order in which you join the sheets.
Longitudinal overlap: one wave or two
| Roof pitch | Longitudinal overlap | Additional sealing |
|---|---|---|
| More than 15° | In one wave | Not required |
| 10–15° | In two waves | Recommended |
| Less than 10° | In two waves | Required (sealing tape) |
An overlap of two corrugations at a low pitch (10–12°) not only guards against leaks — it increases the rigidity of the joint, and the sheets “play” less in the wind, which reduces noise and the risk of fasteners being torn off.
Transverse overlap: what determines the size
The transverse overlap (along the length of the sheet) is 150–300 mm and depends on the roof pitch: at 10° it is 250–300 mm, while at 20° and above 150–200 mm is sufficient. The grade of corrugated sheet also affects the value — for NS-35 with a corrugation height of 35 mm, 150 mm is enough, whereas for C-21 with a corrugation of 21 mm at the same pitch of 15°, 200 mm is required due to the lower rigidity of the joint. In winter the snow load reaches 120–140 kg/m² — under such weight a weak overlap can come apart, especially on slopes with a pitch of 10–12°. If the slope length exceeds the standard sheet length (6–12 m), the transverse joint is best placed not at the eaves overhang or near the ridge, but in the middle third of the slope — there the snow and wind load is minimal.
Step-by-step layout for laying the first row
The first row is laid from 3–4 sheets, not one at a time — this is the only way to preserve the geometry of the slope.
- Step 1: Lay the first sheet with a 40–70 mm overhang beyond the eaves, aligning it along the end.
- Step 2: Fix the sheet with a single screw in the centre (do not tighten fully).
- Step 3: Lay the second sheet with an overlap of one corrugation over the first — the overlap must be complete, with no gap between the corrugations.
- Step 4: Align both sheets along the eaves and fix the joint with screws through the crest of the corrugation at a pitch of 300–400 mm.
- Step 5: Add the third and fourth sheets, align the whole group along the eaves and fasten them finally — if you install them one by one, each subsequent sheet may creep by 1–2 mm due to width tolerances, over 10 sheets this adds up to 2 cm, and the last sheet will not fit flush at the edge.
How to fix corrugated sheeting correctly with screws
Fixing the corrugated sheet is the most critical stage of installation. One mistake — and within a year a rusty spot will appear where the screw was, and in a strong wind the sheet may be torn off.
Where to drive the screw — into the lower corrugation or the crest
Screws are driven strictly into the lower corrugation (trough) of the corrugated sheet — here the sheet fits tightly against the batten, the EPDM rubber washer is compressed to a watertight seal, and water runs down the corrugation without getting under the head. Roofing screws have a drill point and a hex head for a bit — they are not to be confused with ordinary self-tapping metal screws, which have no sealing washer. The standard size is 4,8×28 mm for a timber batten (25–40 mm board) and 4,8×50–60 mm for a metal one. Fastening into the upper corrugation (crest) is the most common beginner's mistake: water flows under the screw through a micro-gap between the washer and the metal, and after a year corrosion appears around the fastening.
Fixing pattern: through the wave, in a staggered arrangement
Screws are placed every other corrugation in a staggered pattern — this gives even pressing of the sheet to the batten without skewing and provides roof rigidity under wind and snow loads. Fastening starts from the eaves overhang, moving upwards towards the ridge: each subsequent row of screws is offset by half a corrugation relative to the previous one, so that the load is distributed over the entire surface of the sheet. Along the edges of the sheet (eaves, ridge, gable) the fastening pitch is reduced — screws are driven into every corrugation, as these zones experience the maximum wind loads and the risk of tearing off.
How many screws are needed per square metre
| Slope zone | Screw consumption, pcs/m² | Fastening spacing |
|---|---|---|
| Central part | 6–8 | Through the wave, in a staggered pattern |
| Eaves overhang | 8–10 | In every wave |
| Gable overhang | 8–10 | In every wave |
| Ridge | 8–10 | In every wave (upper) |
Screw consumption is 6–8 pieces per square metre in the central part of the slope and 8–10 pieces along the edges — on average, a standard corrugated sheet (1,15×6 m) takes 50–60 screws. Saving on screws (fewer than 6 pcs/m²) causes the sheet to flap in the wind — this is not only noise, but also gradual loosening of the fastenings, which over 2–3 years can lead to the sheet being torn off.
How to tighten a screw correctly — so as not to overtighten
The screw is tightened until the EPDM rubber washer is lightly compressed — it should protrude slightly from under the head but not be flattened; an over-compressed washer loses its elasticity and starts to let water through after a year. Setting up the screwdriver is a key point: the clutch is set to 2–3 units (for budget models) or a bit with a depth stop is used. If the washer is not visible after tightening (sunken into the metal), the screw is over-tightened; if the washer is loose, it is under-tightened. The correct force is when the screwdriver grazes the rubber but does not press through it.
Components: ridge, valley, abutments
The ridge, the valley and the junctions to pipes are the most vulnerable points of any roof. Even perfectly laid sheets will not help if these units are installed with errors.
Fixing the ridge onto corrugated sheet — step by step
The ridge is fixed with 4,8×80 mm self-tapping screws into the upper corrugation of the corrugated sheet through every corrugation, with the ridge elements overlapping each other by 100–150 mm — installation begins on the leeward side so that the wind does not blow water under the joints. The prevailing wind direction across the city is south-westerly, so the ridge starts from the south-western end of the roof. The screws are driven strictly perpendicular to the ridge plane, without skew — skew crushes the sealing washer and breaks the seal. The screw length is selected so that it enters the lathing by at least 20–25 mm, not just the corrugated sheet. A shaped seal must always be laid between the ridge and the corrugated sheet — it follows the profile of the corrugation and prevents snow and rain from being blown in; without the seal, even a correctly fixed ridge will let water through during driving rain.
Valley: lower and upper strips — installation sequence
Order of valley installation:
- Step 1: Install the lower valley strip on the solid batten (board pitch 20–25 mm) with a 150–200 mm overlap between the elements — start from the bottom upwards so that the upper element covers the lower one.
- Step 2: Lay the waterproofing over the lower strip with an overlap onto it of at least 100 mm, fixing it to the batten with staples.
- Step 3: Install the corrugated sheet with trimming along the valley line — step back 60–100 mm from the valley axis on each side, and trim with metal shears rather than an angle grinder so as not to damage the zinc coating.
- Step 4: Install the upper decorative strip with a 100–150 mm overlap, fastening it with screws into the upper corrugation of the sheet every 300–400 mm.
- Step 5: Seal the joint between the upper strip and the corrugated sheet with roofing sealant, applying it in a continuous bead 3–5 mm thick.
Flashing around a chimney on a corrugated sheet roof
The connection to the chimney is made using a flashing strip (apron): the lower part is tucked under the corrugated sheet, and the upper part is fixed to the chimney wall with a groove 15–20 mm deep, the groove being filled with heat-resistant sealant (up to +300 °C). The flashing strip consists of two parts: the lower one is installed before laying the corrugated sheet, the upper one afterwards, and both are joined with an overlap of at least 100 mm. On rectangular chimneys each strip is bent on site — the bend angle must exactly follow the roof pitch angle, otherwise gaps form. Around the chimney a setback from the flue to the corrugated sheet of 50–70 mm is always provided — this is an expansion gap that prevents deformation of the roof when the flue heats up and during seasonal movement of the roof.
Common mistakes when laying corrugated sheet
Even experienced craftsmen sometimes make mistakes when installing corrugated sheet. We have collected the five most common mistakes that turn a new roof into a source of constant problems.
Cutting corrugated sheeting with an angle grinder — why you shouldn't
Cutting corrugated sheet with an angle grinder is strictly forbidden — the abrasive disc overheats the metal and burns through the zinc and polymer coating, and after 2–3 months corrosion begins at the cut site, spreading under the coating by 5–10 cm in both directions. Punch shears (electric or lever) do not heat the metal and do not damage the protective layer — this is the main tool for cutting on site. An electric jigsaw with a fine-tooth metal blade (1–1,5 mm) is acceptable, but requires care: the vibration of the base plate scratches the polymer, and the swarf sticks to the coating and leaves rust spots within a week. Even a perfect cut made with punch shears must be treated with a primer or a special paint for galvanised surfaces — there is no factory zinc layer at the cut edge, and without protection the edge will start to rust within six months, especially on south-facing slopes under the Almaty sun.
Fixing into the upper corrugation and over-tightening the screws
Fixing into the upper corrugation and over-tightening the screws are two mistakes that together account for 80% of all leaks around the fastener holes: water flows under the head through the deformed gasket and through the micro-gap between the crest and the lathing. The screw must be driven strictly into the lower corrugation at an angle of 90° to the sheet plane, and the EPDM rubber gasket must be compressed until a small bead of rubber protrudes slightly at the edge — if the gasket is squashed flat, the seal is lost, and within a year a rusty halo will appear under the head. An over-tightened screw does not “hold tighter” — it creates a funnel for water to flow into and weakens the pressure of the sheet against the lathing by 30–40%. If you discover that a screw has been driven into the upper corrugation, it must be unscrewed, the hole sealed with roofing sealant and a new screw driven into the lower corrugation next to it — simply tightening the old one is pointless.
Incorrect overlap and no waterproofing
An incorrect overlap (one corrugation at a pitch of 10–12°) and the absence of waterproofing are two reasons why a new roof starts leaking in the very first rainy season, and water can appear 2–3 metres from the leak point, running down the rafters. The minimum side overlap for corrugated sheet at a pitch of up to 15° is two corrugations; at a pitch of 15–30° it is one corrugation with the seam sealed with bitumen tape, and the vertical overlap must be at least 200 mm on low-pitched slopes. The waterproofing membrane is fixed to the rafters with a construction stapler with a sag of 10–20 mm between them — without this sag, condensation will run straight onto the insulation instead of onto the eaves flashing. If the waterproofing has not been laid and the roof is already installed, the only way to fix the situation is to dismantle the corrugated sheet, lay the membrane and reassemble the roof; it is impossible to “blow in” waterproofing through the ridge or the eaves.
Can corrugated sheet be laid on an old roof?
Laying corrugated sheet on an old roof (slate, ondulin) without dismantling is only possible in one case — if the rafter system is in perfect condition and can withstand double the weight, and the old roof has no damage or rotten areas. In practice, laying corrugated sheet over an old roof is a bad solution: condensation will accumulate under the new covering, the old material will begin to rot, and after 3–5 years everything will have to be dismantled together, paying twice as much. The waterproofing under the new covering will be unable to perform its function — it must remove condensation from the inner side of the corrugated sheet, but the old slate or ondulin blocks this outflow. In Almaty, where temperature swings in spring reach 15–20° in a day, condensation forms abundantly, and the absence of a ventilation gap between the old and new coverings guarantees the rafters will rot within 2–3 seasons.
Conclusion
Laying corrugated sheet on the roof is a process that requires attention to detail at every stage. We have covered the key points: from choosing the installation direction and the correct overlap to fastening with screws and detailing complex junctions.
Key takeaways
The main thing to remember: start from the windward side, fasten the screws only into the lower wave, do not skimp on waterproofing and the counter-batten, and for cutting use nibbling shears rather than an angle grinder. Pay special attention to the valley — it is the most vulnerable component, where leaks most often occur due to accumulating snow and debris. Before fixing each sheet, check its position relative to the eaves — a deviation of 5 mm on the first sheet will cause a skew of 2-3 cm at the ridge. By following these rules, you will get a reliable roof that will last for decades without repair.